notice will mark the beginning of
PBGC’s 270-day review period under
section 4233(a)(1) of ERISA, and the
plan sponsor’s 30-day notice period
under 4233(a)(2) of ERISA.
*
*
*
*
*
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2015–1102]
7. In § 4233.12, paragraph (c) is
revised to read as follows:
■
§ 4233.12
partition.
PBGC action on application for
*
*
*
*
(c) Conditional determination on
application. At the request of a plan
sponsor, PBGC may, in its discretion,
issue an approval of an application
conditioned on Treasury issuing a final
authorization to suspend under section
305(e)(9)(H)(vi) of ERISA and any other
terms and conditions set forth in the
conditional approval. The conditional
approval will include a written
statement of preliminary findings,
conclusions, and conditions. The
conditional approval is not a final
agency action. The proposed partition
will only become effective upon
satisfaction of the required conditions,
and the issuance of an order of partition
under section 4233(c) of ERISA.
*
*
*
*
*
8. In § 4233.13, paragraphs (a)(3) and
(4) are revised to read as follows:
■
§ 4233.13 Coordinated application process
for partition and benefit suspension.
(a) * * *
(3) If Treasury does not issue the final
authorization to suspend, PBGC’s
conditional approval under § 4233.12(c)
will be null and void.
(4) If Treasury issues a final
authorization to suspend, PBGC will
issue a final partition order under
§ 4233.14 and section 4233(c) of ERISA.
The effective date of a final partition
order must satisfy the requirements of
section 305(e)(9)(D)(v) of ERISA.
*
*
*
*
*
Issued in Washington, DC, this 18th day of
December 2015.
W. Thomas Reeder,
Director, Pension Benefit Guaranty
Corporation.
[FR Doc. 2015–32309 Filed 12–22–15; 8:45 am]
asabaliauskas on DSK5VPTVN1PROD with RULES
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
*
BILLING CODE 7709–02–P
VerDate Sep<11>2014
Drawbridge Operation Regulation; Mill
Neck Creek, Oyster Bay, NY
16:43 Dec 22, 2015
Jkt 238001
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Bayville
Bridge across the Mill Neck Creek, mile
0.1, at Oyster Bay, New York. The
deviation is necessary to perform
electrical and mechanical upgrades.
This deviation allows the bridge to
remain in the closed position for
approximately 5 days.
DATES: This deviation is effective from
7:00 a.m. on January 11, 2016 to 3:30
p.m. on January 15, 2016.
ADDRESSES: The docket for this
deviation, [USCG–2015–1102] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Ms. Judy K.
Leung-Yee, Project Officer, First Coast
Guard District, telephone (212) 514–
4330, email judy.k.leung-yee@uscg.mil.
SUPPLEMENTARY INFORMATION: Nassau
County Department of Public Works
requested this temporary deviation from
the normal operating schedule to
perform electrical and mechanical
upgrades.
The Bayville Bridge, mile 0.1, across
the Mill Neck Creek has a vertical
clearance in the closed position of 9 feet
at mean high water and 16 feet at mean
low water. The existing bridge operating
regulations are found at 33 CFR 117.800.
The waterway is transited by one
commercial user and recreation vessel
traffic.
Under this temporary deviation, the
Bayville Bridge may remain in the
closed position from 7:00 a.m. on
January 11, 2016 to 3:30 p.m. on January
15, 2016.
Vessels able to pass through the
bridge in the closed position may do so
at any time. The bridge will not be able
to open for emergencies and there is no
immediate alternate route for vessels to
pass.
The Coast Guard will also inform the
users of the waterways through our
SUMMARY:
PO 00000
Frm 00041
Fmt 4700
Sfmt 4700
79695
Local and Broadcast Notices to Mariners
of the change in operating schedule for
the bridge so that vessels can arrange
their transits to minimize any impact
caused by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: December 17, 2015.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2015–32254 Filed 12–22–15; 8:45 am]
BILLING CODE 9110–04–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 52
[EPA–R08–OAR–2015–0429; FRL–9939–87–
Region 8]
Air Plan Approval; SD; Update to
Materials Incorporated by Reference
Environmental Protection
Agency (EPA).
ACTION: Final rule; administrative
change.
AGENCY:
The Environmental Protection
Agency (EPA) is updating the materials
that are incorporated by reference (IBR)
into the South Dakota State
Implementation Plan (SIP). The
Regulations affected by this update have
been previously submitted by the South
Dakota Department of Environment and
Natural Resources (SD DENR) and
approved by the EPA. In this action, the
EPA is also notifying the public of
corrections to typographical errors and
minor formatting changes to the IBR
tables. This update affects the SIP
materials that are available for public
inspection at the EPA Regional Office.
DATES: This action is effective December
23, 2015.
ADDRESSES: The EPA has established a
docket for this action under Docket
Identification Number EPA–R08–OAR–
2015–0429. All documents in the docket
are listed on the https://
www.regulations.gov Web site. Although
listed in the index, some information
may not be publicly available, i.e.,
Confidential Business Information or
other information the disclosure of
which is restricted by statute. Certain
other material, such as copyrighted
material, is not placed on the Internet
and will be publicly available only in
the hard copy form. Publicly available
SUMMARY:
E:\FR\FM\23DER1.SGM
23DER1
79696
Federal Register / Vol. 80, No. 246 / Wednesday, December 23, 2015 / Rules and Regulations
docket materials are available either
electronically through https://
www.regulations.gov or in hard copy at
EPA Region 8, Office of Partnerships
and Regulatory Assistance, Air Program,
1595 Wynkoop Street, Denver,
Colorado, 80202–1129. The EPA
requests that you contact the individual
listed in the FOR FURTHER INFORMATION
CONTACT section to view the hard copy
of the docket. An electronic copy of the
State’s SIP compilation is also available
at https://www.epa.gov/region8/air/
sip.html.
FOR FURTHER INFORMATION CONTACT:
Kathy Ayala, Air Program, U.S.
Environmental Protection Agency
(EPA), Region 8, Mailcode 8P–AR, 1595
Wynkoop Street, Denver, Colorado
80202–1129, (303) 312–6142,
ayala.kathy@epa.gov.
SUPPLEMENTARY INFORMATION:
I. Background
The SIP is a living document which
a state revises as necessary to address its
unique air pollution problems.
Therefore, the EPA, from time to time,
must take action on SIP revisions
containing new and/or revised
regulations as being part of the SIP. On
May 22, 1997 (62 FR 27968), the EPA
revised the procedures for incorporating
by reference Federally-approved SIPs, as
a result of consultation between the EPA
and the Office of the Federal Register
(OFR). The description of the revised
SIP document, IBR procedures and
‘‘Identification of Plan’’ format are
discussed in further detail in the May
22, 1997, Federal Register document.
On March 8, 2005 (70 FR 11125) the
EPA published the revised format of the
IBR material for South Dakota as of
November 15, 2004. Today’s action is an
update to the March 8, 2005 document.
II. EPA Action
In this action, the EPA is announcing
the update to the IBR material as of
October 1, 2015. The EPA is also
correcting typographical errors,
including omission and other minor
errors in subsection 52.2170, paragraphs
(c), (d), and (e).
asabaliauskas on DSK5VPTVN1PROD with RULES
III. Incorporation by Reference
In this action, EPA is finalizing
regulatory text that includes
incorporation by reference. In
accordance with requirements of 1 CFR
51.5, EPA is finalizing the incorporation
by reference of the South Dakota
regulations described in the
amendments to 40 CFR part 52 set forth
below. EPA has made, and will continue
to make, these documents generally
available electronically through
VerDate Sep<11>2014
16:43 Dec 22, 2015
Jkt 238001
www.regulations.gov and/or in hard
copy at the appropriate EPA office (see
the ADDRESSES section of this preamble
for more information).
IV. Good Cause Exemption
EPA has determined that today’s
action falls under the ‘‘good cause’’
exemption in section 553(b)(3)(B) of the
Administrative Procedure Act (APA)
which, upon a finding of ‘‘good cause’’
authorizes agencies to dispense with
public participation, and section
553(d)(3), which allows an agency to
make a rule effective immediately
(thereby avoiding the 30-day delayed
effective date otherwise provided for in
the APA). Today’s action simply
updates the codification of provisions
which are already in effect as a matter
of law.
Under section 553 of the APA, an
agency may find good cause where
procedures are ‘‘impractical,
unnecessary, or contrary to the public
interest.’’ Public comment is
‘‘unnecessary’’ and ‘‘contrary to the
public interest’’ since the codification
only reflects existing law. Likewise,
there is no purpose served by delaying
the effective date of this action.
V. Statutory and Executive Order
Reviews
power and responsibilities between the
federal government and Indian tribes, as
specified by Executive Order 13175 (65
FR 67249, November 9, 2000), nor will
it have substantial direct effects on the
states, on the relationship between the
national government and the states, or
on the distribution of power and
responsibilities among the various
levels of government, as specified in
Executive Order 13132 (64 FR 43255,
August 10, 1999). This rule also is not
subject to Executive Order 13045 (62 FR
19885, April 23, 1997), because it is not
economically significant. This rule does
not involve technical standards; thus
the requirements of section 12(d) of the
National Technology Transfer and
Advancement Act of 1995 (15 U.S.C.
272 note) do not apply. The rule also
does not involve special consideration
of environmental justice related issues
as required by Executive Order 12898
(59 FR 7629, February 16, 1994). This
rule does not impose an information
collection burden under the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501
et seq.). EPA’s compliance with these
statutes and Executive Orders for the
underlying rules are discussed in
previous actions taken on the state’s
rules.
A. General Requirements
B. Submission to Congress and the
Comptroller General
Under Executive Order 12866 (58 FR
51735, October 4, 1993), this action is
not a ‘‘significant regulatory action’’ and
is therefore not subject to review by the
Office of Management and Budget. This
rule is not subject to Executive Order
13211, ‘‘Actions Concerning Regulations
That Significantly Affect Energy Supply,
Distribution, or Use’’ (66 FR 28355, May
22, 2001) because it is not a significant
regulatory action under Executive Order
12866. Because the agency has made a
‘‘good cause’’ finding that this action is
not subject to notice-and-comment
requirements under the Administrative
Procedure Act or any other statute as
indicated in the SUPPLEMENTARY
INFORMATION section, it is not subject to
the regulatory flexibility provisions of
the Regulatory Flexibility Act (5 U.S.C.
601 et seq.), or to sections 202 and 205
of the Unfunded Mandates Reform Act
of 1995 (UMRA) (Pub. L. 104–4). In
addition, this action does not
significantly or uniquely affect small
governments or impose a significant
intergovernmental mandate, as
described in sections 203 and 204 of
UMRA. This rule also does not have a
substantial direct effect on one or more
Indian tribes, on the relationship
between the federal government and
Indian tribes, or on the distribution of
The Congressional Review Act (5
U.S.C. 801 et seq.), as added by the
Small Business Regulatory Enforcement
Fairness Act of 1996, generally provides
that before a rule may take effect, the
agency promulgating the rule must
submit a rule report, which includes a
copy of the rule, to each House of the
Congress and to the Comptroller General
of the United States. Section 808 allows
the issuing agency to make a rule
effective sooner than otherwise
provided by the CRA if the agency
makes a good cause finding that notice
and public procedure is impracticable,
unnecessary or contrary to the public
interest. This action simply codifies
provisions which are already in effect as
a matter of law in federal and approved
state programs. 5 U.S.C. 808(2). As
stated previously, EPA has made such a
good cause finding and established an
effective date of December 23, 2015.
EPA will submit a report containing this
rule and other required information to
the U.S. Senate, the U.S. House of
Representatives, and the Comptroller
General of the United States prior to
publication of the rule in the Federal
Register. This change to the
identification of plan for South Dakota
is not a ‘‘major rule’’ as defined by 5
U.S.C. 804(2).
PO 00000
Frm 00042
Fmt 4700
Sfmt 4700
E:\FR\FM\23DER1.SGM
23DER1
Federal Register / Vol. 80, No. 246 / Wednesday, December 23, 2015 / Rules and Regulations
In this rule, EPA is finalizing
regulatory text that includes
incorporation by reference. In
accordance with requirements of 1 CFR
51.5, EPA is finalizing the incorporation
by reference of the South Dakota
regulations described in the
amendments to 40 CFR part 52 set forth
below. EPA has made, and will continue
to make, these documents generally
available electronically through
www.regulations.gov and/or in hard
copy at the appropriate EPA office (see
the ADDRESSES section of this preamble
for more information).
for this ‘‘Identification of plan’’ update
action for South Dakota.
List of Subjects in 40 CFR Part 52
Environmental protection, Air
pollution control, Carbon monoxide,
Incorporation by reference,
Intergovernmental relations, Lead,
Nitrogen dioxide, Ozone, Particulate
matter, Reporting and recordkeeping
requirements, Sulfur oxides, Volatile
organic compounds.
Dated: December 4, 2015.
Shaun L. McGrath,
Regional Administrator, Region 8.
C. Petitions for Judicial Review
40 CFR part 52 is amended as follows:
EPA has also determined that the
provisions of section 307(b)(1) of the
Clean Air Act pertaining to petitions for
judicial review are not applicable to this
action. Prior EPA rulemaking actions for
each individual component of the South
Dakota SIP compilation had previously
afforded interested parties the
opportunity to file a petition for judicial
review in the United States Court of
Appeals for the appropriate circuit
within 60 days of such rulemaking
action. Thus, EPA sees no need in this
action to reopen the 60-day period for
filing such petitions for judicial review
Rule No.
PART 52—APPROVAL AND
PROMULGATION OF
IMPLEMENTATION PLANS
1. The authority citation for part 52
continues to read as follows:
■
Authority: 42 U.S.C. 7401 et seq.
Subpart QQ—South Dakota
2. In § 52.2170 paragraphs (b), (c), (d)
and (e) are revised to read as follows:
■
§ 52.2170
Identification of plan.
*
*
Rule title
*
*
State effective
date
*
EPA effective
date
(b) Incorporation by reference. (1)
Material listed in paragraphs (c) and (d)
of this section with an EPA approval
date prior to October 1, 2015, was
approved for incorporation by reference
by the Director of the Federal Register
in accordance with 5 U.S.C. 552(a) and
1 CFR part 51. Material is incorporated
as it exists on the date of the approval,
and notice of any change in the material
will be published in the Federal
Register. Entries in paragraphs (c) and
(d) of this section with EPA approval
dates after October 1, 2015, will be
incorporated by reference in the next
update to the SIP compilation.
(2) EPA Region 8 certifies that the
rules/regulations provided by EPA in
the SIP compilation at the addresses in
paragraph (b)(3) of this section are an
exact duplicate of the officially
promulgated state rules/regulations
which have been approved as part of the
SIP as of October 1, 2015.
(3) Copies of the materials
incorporated by reference may be
inspected at the EPA Region 8 Office,
Office of Partnerships and Regulatory
Assistance (OPRA), Air Program, 1595
Wynkoop Street, Denver, Colorado
80202–1129.
(c) EPA-approved regulations.
Final rule citation, date
Statewide
74:09:01. Procedures—Board of Minerals and Environment, Contested Case Procedure
74:09:01:20 ..........................
74:09:01:21 ..........................
Board member conflict of interest.
Board member potential conflict of
interests.
5/29/14
3/2/15
80 FR 4799, 1/29/15.
5/29/14
3/2/15
80 FR 4799, 1/29/15.
74:36:01. Definitions
74:36:01:01 ..........................
74:36:01:03 ..........................
74:36:01:04 ..........................
74:36:01:05 ..........................
74:36:01:06 ..........................
74:36:01:08 ..........................
asabaliauskas on DSK5VPTVN1PROD with RULES
74:36:01:09 ..........................
74:36:01:10 ..........................
74:36:01:11 ..........................
74:36:01:12 ..........................
74:36:01:13 ..........................
VerDate Sep<11>2014
16:43 Dec 22, 2015
Definitions ...............
Administrative permit amendment
defined.
Affected states defined.
Applicable requirements of Clean
Air Act defined.
Complete application defined.
Major source defined.
Categories of
sources defined.
Modification defined
National ambient air
quality standard
(NAAQS).
Potential to emit defined.
Process weight rate
defined.
Jkt 238001
PO 00000
6/25/13
4/4/99
11/2/15
5/7/03
80 FR 59620, 10/2/15.
68 FR 16726, 4/7/03.
4/22/93
12/18/98
63 FR 55804, 10/19/98.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
4/22/93
12/18/98
63 FR 55804, 10/19/98.
4/4/99
5/19/14
79 FR 21852, 4/18/14.
1/2/05
10/13/06
71 FR 46403, 8/14/06.
6/28/10
4/22/93
7/28/14
12/18/98
79 FR 36419, 6/27/14.
63 FR 55804, 10/19/98.
4/22/93
12/18/98
63 FR 55804, 10/19/98.
4/22/93
12/18/98
63 FR 55804, 10/19/98.
Frm 00043
Fmt 4700
Sfmt 4700
79697
E:\FR\FM\23DER1.SGM
23DER1
Comments
79698
Federal Register / Vol. 80, No. 246 / Wednesday, December 23, 2015 / Rules and Regulations
State effective
date
Rule No.
Rule title
74:36:01:15 ..........................
Regulated air pollutant defined.
Responsible official
defined.
Municipal solid
waste landfill defined.
Existing municipal
solid waste landfill
defined.
Physical change or
change in the
method of operation defined.
Commence construction defined.
74:36:01:16 ..........................
74:36:01:18 ..........................
74:36:01:19 ..........................
74:36:01:20 ..........................
74:36:01:21 ..........................
EPA effective
date
1/5/95
5/19/14
79 FR 21852, 4/18/14.
1/2/05
10/13/06
71 FR 46403, 8/14/06.
12/29/96
12/18/98
63 FR 55804, 10/19/98.
12/29/96
12/18/98
63 FR 55804, 10/19/98.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
Final rule citation, date
74:36:02. Ambient Air Quality
74:36:02:01 ..........................
74:36:02:02 ..........................
74:36:02:03 ..........................
74:36:02:04 ..........................
74:36:02:05 ..........................
Air quality goals ......
Ambient air quality
standards.
Methods of sampling and analysis.
Air quality monitoring network.
Air quality monitoring requirements.
4/22/93
6/25/13
12/18/98
11/2/15
63 FR 55804, 10/19/98.
80 FR 59620, 10/2/15.
6/25/13
11/2/15
80 FR 59620,10/2/15.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
74:36:03. Air Quality Episodes
74:36:03:01 ..........................
74:36:03:02 ..........................
Air pollution emergency episode.
Episode emergency
contingency plan.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
74:36:04. Operating Permits for Minor Sources
74:36:04:01 ..........................
74:36:04:02 ..........................
74:36:04:02.01 .....................
74:36:04:03 ..........................
74:36:04:04 ..........................
74:36:04:05 ..........................
74:36:04:06 ..........................
asabaliauskas on DSK5VPTVN1PROD with RULES
74:36:04:07 ..........................
74:36:04:08 ..........................
74:36:04:09 ..........................
74:36:04:10 ..........................
VerDate Sep<11>2014
16:43 Dec 22, 2015
Applicability .............
Minor source operating permit required.
Minor source operating permit exemption.
Emission unit exemptions.
Standard for
issuance of a
minor source operating permit.
Time period for operating permits
and renewals.
Timely and complete application
for operating permit required.
Required contents
of complete application for operating permit.
Applicant required to
supplement or
correct application.
Permit application—
Completeness review.
Time period for department’s recommendation.
Jkt 238001
PO 00000
4/22/93
6/28/10
12/18/98
7/28/14
63 FR 55804, 10/19/98.
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/28/14.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
1/5/95
12/18/98
63 FR 55804, 10/19/98.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
Frm 00044
Fmt 4700
Sfmt 4700
E:\FR\FM\23DER1.SGM
23DER1
Comments
Federal Register / Vol. 80, No. 246 / Wednesday, December 23, 2015 / Rules and Regulations
State effective
date
Rule No.
Rule title
74:36:04:11 ..........................
Department’s recommendation on
operating permit.
Public participation
in permitting process.
Public review of department’s draft
permit.
Final permit decision—Notice to interested persons.
Right to petition for
contested case
hearing.
Contents of operating permit.
Operating permit expiration.
Renewal of operating permit.
Operating permit revision.
Administrative permit amendment.
Procedures for administrative permit
amendments.
Minor permit
amendment required.
Requirements for
minor permit
amendment.
Application for minor
permit amendment.
Department deadline to approve
minor permit
amendment.
Permit modifications
Source status
change—new permit required.
Reopening operating permit for
cause.
Procedures to reopen operating
permit.
Operating permit
termination, revision, and revocation.
Notice of operating
noncompliance—
Contents.
Petition for contested case on alleged violation.
Circumvention of
emissions not allowed.
General permits ......
Secretary may require an individual
permit.
74:36:04:12 ..........................
74:36:04:12.01 .....................
74:36:04:13 ..........................
74:36:04:14 ..........................
74:36:04:15 ..........................
74:36:04:16 ..........................
74:36:04:17 ..........................
74:36:04:18 ..........................
74:36:04:19 ..........................
74:36:04:20 ..........................
74:36:04:20.01 .....................
74:36:04:20.02 .....................
74:36:04:20.03 .....................
74:36:04:20.04 .....................
74:36:04:21 ..........................
74:36:04:22 ..........................
74:36:04:23 ..........................
74:36:04:24 ..........................
74:36:04:27 ..........................
74:36:04:28 ..........................
74:36:04:29 ..........................
asabaliauskas on DSK5VPTVN1PROD with RULES
74:36:04:31 ..........................
74:36:04:32 ..........................
74:36:04:33 ..........................
EPA effective
date
4/4/99
5/7/03
68 FR 16726, 4/7/03.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
4/4/99
5/7/03
68 FR 16726, 4/7/03.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
1/5/95
12/18/98
63 FR 55804, 10/19/98.
1/5/95
12/18/98
63 FR 55804, 10/19/98.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
1/5/95
4/4/99
12/18/98
5/7/03
63 FR 55804, 10/19/98.
68 FR 16726, 4/7/03.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
4/22/93
12/18/98
63 FR 55804, 10/19/98.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
4/22/93
12/18/98
63 FR 55804, 10/19/98.
4/22/93
12/18/98
63 FR 55804, 10/19/98.
4/22/93
12/18/98
63 FR 55804, 10/19/98.
6/28/10
9/1/03
7/28/14
7/9/04
79 FR 36419, 6/27/14.
69 FR 25839, 5/10/04.
Final rule citation, date
74:36:06. Regulated Air Pollutant Emissions
74:36:06:01 ..........................
VerDate Sep<11>2014
16:43 Dec 22, 2015
Applicability .............
Jkt 238001
PO 00000
1/5/95
Frm 00045
Fmt 4700
12/18/98
Sfmt 4700
63 FR 55804, 10/19/98.
E:\FR\FM\23DER1.SGM
23DER1
79699
Comments
79700
Federal Register / Vol. 80, No. 246 / Wednesday, December 23, 2015 / Rules and Regulations
State effective
date
Rule No.
Rule title
74:36:06:02 ..........................
Allowable emissions
for fuel-burning
units.
Allowable emissions
for process industry units.
Particulate emission
restrictions for incinerators and
waste wood burners.
Most stringent interpretation applicable.
Stack performance
test.
Open burning practices prohibited.
74:36:06:03 ..........................
74:36:06:04 ..........................
74:36:06:05 ..........................
74:36:06:06 ..........................
74:36:06:07 ..........................
EPA effective
date
4/4/99
5/7/03
68 FR 16726, 4/7/03.
4/4/99
5/7/03
68 FR 16726, 4/7/03.
1/2/05
10/13/06
71 FR 46403,8/14/06.
4/22/93
12/18/98
63 FR 55804, 10/19/98.
1/2/05
10/13/06
71 FR 46403, 8/14/06.
4/4/99
5/7/03
Final rule citation, date
68 FR 16726, 4/7/03.
74:36:07. New Source Performance Standards
74:36:07:08 ..........................
74:36:07:29 ..........................
74:36:07:30 ..........................
Ash disposal requirements.
Operating requirements for wire
reclamation furnaces.
Monitoring requirements for wire
reclamation furnaces.
12/29/96
6/21/00
65 FR 32033, 5/22/00.
4/22/93
11/6/95
60 FR 46222, 9/6/95.
4/22/93
11/6/95
60 FR 46222, 9/6/95.
74:36:09. Prevention of Significant Deterioration
74:36:09:01 ..........................
74:36:09:01.01 .....................
74:36:09:02 ..........................
74:36:09:03 ..........................
Applicability .............
Prevention of significant deterioration
permit required.
Prevention of significant deterioration.
Public participation
9/18/06
9/18/06
1/22/08
1/22/08
72 FR 72617, 12/21/07.
72 FR 72617, 12/21/07.
6/25/13
3/2/15
80 FR 4799, 1/29/15.
6/25/13
3/2/15
80 FR 4799, 1/29/15.
74:36:10. New Source Review
74:36:10:01 ..........................
74:36:10:02 ..........................
74:36:10:03.01 .....................
74:36:10:05 ..........................
74:36:10:06 ..........................
74:36:10:07 ..........................
74:36:10:08 ..........................
asabaliauskas on DSK5VPTVN1PROD with RULES
74:36:10:09 ..........................
74:36:10:10 ..........................
VerDate Sep<11>2014
16:43 Dec 22, 2015
Applicability .............
Definitions ...............
New source review
preconstruction
permit required.
New source review
preconstruction
permit.
Causing or contributing to violation
of any national
ambient air quality
standard.
Determining credit
for emission offsets.
Projected actual
emissions.
Clean unit test for
emission units
subject to lowest
achievable emission rate.
Clean unit test for
emission units
comparable to
lowest achievable
emission rate.
Jkt 238001
PO 00000
4/22/93
6/25/13
6/25/13
12/18/98
7/28/14
7/28/14
63 FR 55804, 10/19/98.
79 FR 36419, 6/27/14.
79 FR 36419, 6/27/14.
6/25/13
7/28/14
79 FR 36419, 6/27/14.
9/1/03
7/9/04
69 FR 25839, 5/10/04.
6/25/13
7/28/14
79 FR 36419, 6/27/14.
6/25/13
7/28/14
79 FR 36419, 6/27/14.
1/2/05
10/13/06
71 FR 46403, 8/14/06.
1/2/05
10/13/06
71 FR 46403, 8/14/06.
Frm 00046
Fmt 4700
Sfmt 4700
E:\FR\FM\23DER1.SGM
23DER1
Comments
Federal Register / Vol. 80, No. 246 / Wednesday, December 23, 2015 / Rules and Regulations
Rule No.
State effective
date
Rule title
EPA effective
date
Final rule citation, date
74:36:11. Performance Testing
74:36:11:01 ..........................
74:36:11:02 ..........................
74:36:11:03 ..........................
74:36:11:04 ..........................
Stack performance
testing or other
testing methods.
Secretary may require performance
tests.
Notice to department of performance test.
Testing new fuels or
raw materials.
6/25/13
11/2/15
80 FR 59620,10/2/15.
12/29/96
12/18/98
63 FR 55804, 10/19/98.
12/29/96
12/18/98
63 FR 55804, 10/19/98.
4/4/99
4/3/00
65 FR 5264, 2/3/00.
74:36:12. Control of Visible Emissions
74:36:12:01 ..........................
74:36:12:02 ..........................
74:36:12:03 ..........................
Restrictions on visible emissions.
Exceptions to restrictions.
Exceptions granted
to alfalfa
pelletizers or
dehydrators.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
74:36:13. Continuous Emission Monitoring Systems
74:36:13:01 ..........................
74:36:13:02 ..........................
74:36:13:03 ..........................
74:36:13:04 ..........................
74:36:13:05 ..........................
74:36:13:06 ..........................
74:36:13:07 ..........................
74:36:13:08 ..........................
Secretary may require continuous
emission monitoring systems
(CEMS).
Minimum performance specifications for all continuous emission
monitoring systems.
Reporting requirements.
Notice to department of exceedance.
Compliance determined by data
from continuous
emission monitor.
Compliance certification.
Credible evidence ...
Compliance assurance monitoring.
4/22/93
12/18/98
63 FR 55804, 10/19/98.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
4/22/93
12/18/98
63 FR 55804, 10/19/98.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/25/13
6/25/13
11/2/15
11/2/15
80 FR 59620, 10/2/15.
80 FR 59620, 10/2/15.
74:36:17. Rapid City Street Sanding and Deicing
74:36:17:01 ..........................
74:36:17:02 ..........................
74:36:17:03 ..........................
asabaliauskas on DSK5VPTVN1PROD with RULES
74:36:17:04 ..........................
74:36:17:05 ..........................
74:36:17:06 ..........................
Applicability .............
Reasonable available control technology.
Street sanding specifications.
Street deicing and
maintenance plan.
Street sanding and
sweeping recordkeeping.
Inspection authority
2/11/96
2/11/96
8/9/02
8/9/02
67 FR 39619, 6/10/02.
67 FR 39619, 6/10/02.
2/11/96
8/9/02
67 FR 39619, 6/10/02.
2/11/96
8/9/02
67 FR 39619, 6/10/02.
2/11/96
8/9/02
67 FR 39619, 6/10/02.
2/11/96
8/9/02
67 FR 39619, 6/10/02.
74:36:18. Regulations for State Facilities in the Rapid City Area
74:36:18:01 ..........................
74:36:18:02 ..........................
74:36:18:03 ..........................
VerDate Sep<11>2014
16:43 Dec 22, 2015
Definitions ...............
Applicability .............
Permit required .......
Jkt 238001
PO 00000
7/1/02
7/1/02
7/1/02
Frm 00047
Fmt 4700
3/22/04
3/22/04
3/22/04
Sfmt 4700
69 FR 2671,1/20/04.
69 FR 2671, 1/20/04.
69 FR 2671, 1/20/04.
E:\FR\FM\23DER1.SGM
23DER1
79701
Comments
79702
Federal Register / Vol. 80, No. 246 / Wednesday, December 23, 2015 / Rules and Regulations
Rule No.
Rule title
74:36:18:04 ..........................
Time period for permits and renewals.
Required contents
of a complete application for a permit.
Contents of permit ..
Permit expiration .....
Renewal of permit ..
Reasonably available control technology required.
Visible emission
limit for construction and continuous operation
activities.
Exception to visible
emission limit.
Notice of operating
noncompliance—
Contents.
74:36:18:05 ..........................
74:36:18:06
74:36:18:07
74:36:18:08
74:36:18:09
..........................
..........................
..........................
..........................
74:36:18:10 ..........................
74:36:18:11 ..........................
74:36:18:12 ..........................
State effective
date
EPA effective
date
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/25/13
7/1/02
7/1/02
7/1/02
11/2/15
3/22/04
3/22/04
3/22/04
80
69
69
69
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
Final rule citation, date
FR
FR
FR
FR
59620, 10/2/15.
2671, 1/20/04.
2671, 1/20/04.
2671, 1/20/04.
74:36:20. Construction Permits for New Sources or Modifications
74:36.20.01 ..........................
74:36:20:02 ..........................
74:36:20:03 ..........................
74:36:20:04 ..........................
74:36:20:05 ..........................
74:36:20:06 ..........................
74:36:20:07 ..........................
74:36:20:08 ..........................
74:36:20:09 ..........................
74:36:20:10 ..........................
74:36:20:11 ..........................
74:36:20:12 ..........................
74:36:20:13 ..........................
asabaliauskas on DSK5VPTVN1PROD with RULES
74:36:20:14 ..........................
74:36:20:15 ..........................
74:36:20:16 ..........................
74:36:20:17 ..........................
VerDate Sep<11>2014
16:43 Dec 22, 2015
Applicability .............
Construction permit
required.
Construction permit
exemption.
Emission unit exemptions.
Standard for
issuance of construction permit.
Timely and complete application
for a construction
permit required.
Required contents
of complete application for a construction permit.
Applicant required to
supplement or
correct application.
Permit application—
Completeness review.
Time period for department’s recommendation.
Public participation
in permitting process.
Public review of department’s draft
permit.
Final permit decision—Notice to interested persons.
Right to petition for
contested case
hearing.
Contents of construction permit.
Administrative permit amendment.
Procedures for administrative permit
amendments.
Jkt 238001
PO 00000
6/28/10
4/20/11
7/28/14
7/28/14
79 FR 36419, 6/27/14.
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36149, 6/27/14.
Frm 00048
Fmt 4700
Sfmt 4700
E:\FR\FM\23DER1.SGM
23DER1
Comments
Federal Register / Vol. 80, No. 246 / Wednesday, December 23, 2015 / Rules and Regulations
Rule No.
Rule title
74:36:20:18 ..........................
Reopening construction permit for
cause.
Procedures to reopen construction
permit.
Construction permit
does not exempt
from other requirements.
Expiration of a construction permit.
Notice of constructing or operating noncompliance—Contents.
Petition for contested case on alleged violation.
Circumvention of
emissions not allowed.
74:36:20:19 ..........................
74:36:20:20 ..........................
74:36:20:21 ..........................
74:36:20:22 ..........................
74:36:20:23 ..........................
74:36:20:24 ..........................
State effective
date
EPA effective
date
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36149, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
6/28/10
7/28/14
79 FR 36419, 6/27/14.
Final rule citation, date
74:36:21. Regional Haze Program
74:36:21:01 ..........................
74:36:21:02 ..........................
74:36:21:03 ..........................
74:36:21:04 ..........................
74:36:21:05 ..........................
74:36:21:06 ..........................
74:36:21:07 ..........................
74:36:21:08 ..........................
74:36:21:09 ..........................
74:36:21:10 ..........................
74:36:21:11 ..........................
74:36:21:12 ..........................
Applicability .............
Definitions ...............
Existing stationary
facility defined.
Visibility impact
analysis.
BART determination
BART determination
for a BART-eligible coal-fired
power plant.
Installation of controls based on visibility impact analysis or BART determination.
Operation and maintenance of controls.
Monitoring, recordkeeping, and reporting.
Permit to construct
Permit required for
BART determination.
Federal land manager notification
and review.
12/7/10
6/25/13
12/7/10
5/29/12
11/2/15
5/29/12
77 FR 24845, 4/26/12.
80 FR 59620, 10/2/15.
77 FR 24845, 4/26/12.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
6/25/13
9/19/11
11/2/15
5/29/12
80 FR 59620, 10/2/15.
77 FR 24845, 4/26/12.
12/7/10
5/29/12
77 FR 24845, 4/26/12.
12/7/10
5/29/12
77 FR 24845, 4/26/12.
6/25/13
11/2/15
80 FR 59620, 10/2/15.
12/7/10
12/7/10
5/29/12
5/29/12
77 FR 24845, 4/26/12.
77 FR 24845, 4/26/12.
12/7/10
5/29/12
77 FR 24845, 4/26/12.
Pennington
Ordinance #12—Fugitive Dust Regulation—1.0 Control of Fugitive Dust
asabaliauskas on DSK5VPTVN1PROD with RULES
1.1 ........................................
1.2 ........................................
1.3 ........................................
1.4 ........................................
1.5 ........................................
VerDate Sep<11>2014
16:43 Dec 22, 2015
Applicability .............
Definitions ...............
Standard of compliance.
Reasonably available control technology required.
Fugitive dust control
permits required
for construction
activities, i.e.,
temporary operations.
Jkt 238001
PO 00000
12/12/78
12/12/78
12/12/78
7/13/79
7/13/79
7/13/79
44 FR 44494, 7/30/79.
44 FR 44494, 7/30/79.
44 FR 44494, 7/30/79.
12/12/78
7/13/79
44 FR 44494, 7/30/79.
12/12/78
7/13/79
44 FR 44494, 7/30/79.
Frm 00049
Fmt 4700
Sfmt 4700
E:\FR\FM\23DER1.SGM
23DER1
79703
Comments
79704
Federal Register / Vol. 80, No. 246 / Wednesday, December 23, 2015 / Rules and Regulations
Rule title
1.6 ........................................
Compliance plans
and schedules required, i.e., continuous operations.
Enforcement procedures.
Establishment of administrative mechanisms.
Separability .............
1.7 ........................................
1.8 ........................................
1.9 ........................................
State effective
date
EPA effective
date
12/12/78
7/13/79
44 FR 44494, 7/30/79.
12/12/78
7/13/79
44 FR 44494, 7/30/79.
12/12/78
7/13/79
44 FR 44494, 7/30/79.
12/12/78
7/13/79
44 FR 44494, 7/30/79.
State effective
date
EPA effective
date
3/18/82
8/7/83
State effective
date
Rule No.
EPA effective
date
1/17/72
1/17/72
1/17/72
1/17/72
1/17/72
1/17/72
1/17/72
1/17/72
1/17/72
1/17/72
1/17/72
12/27/78
1/21/80
7/13/72
7/13/72
7/13/72
7/13/72
7/13/72
7/13/72
7/13/72
7/13/72
7/13/72
7/13/72
7/13/72
8/30/79
10/4/80
37
37
37
37
37
37
37
37
37
37
37
44
45
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
15080,
15080,
15080,
15080,
15080,
15080,
15080,
15080,
15080,
15080,
15080,
44494,
58528,
7/27/72.
7/27/72.
7/27/72.
7/27/72.
7/27/72.
7/27/72.
7/27/72.
7/27/72.
7/27/72.
7/27/72.
7/27/72.
7/30/79.
9/4/80.
5/4/84
8/20/86
5/11/88
7/12/88
1/12/94
10/26/84
7/7/89
10/2/88
11/5/90
12/27/94
49
54
53
55
59
FR
FR
FR
FR
FR
37752,
24334,
34077,
40831,
53589,
9/26/84.
6/7/89.
9/2/88.
10/5/90.
10/25/94.
11/16/95
7/10/02
67 FR 39619, 6/10/02.
4/19/07
7/7/08
73 FR 26019, 5/8/08.
2/1/08
4/26/12
8/22/11
5/29/12
76 FR 43912, 7/22/11.
77 FR 24845, 4/26/12.
3/4/11
3/2/15
80 FR 4799, 1/29/15.
10/10/12
3/2/15
80 FR 4799, 1/29/15.
5/21/13
3/2/15
80 FR 4799, 1/29/15.
10/23/13
3/2/15
80 FR 4799, 1/29/15.
3/2/15
3/2/15
80 FR 4799, 1/29/15.
7/1/93
12/27/94
Final rule citation, date
Comments
(d) EPA-approved source specific
requirements.
Rule No.
Rule title
(AQ 79–02.) ................................
South Dakota
State University steam
generating
plant.
Final rule citation, date
Comments
48 FR 31199, 7/7/83.
(e) EPA-approved nonregulatory
provisions.
asabaliauskas on DSK5VPTVN1PROD with RULES
Rule title
I.A. Introduction .........................................................
I.B. Legal Authority ....................................................
I.C. Control Strategy ..................................................
I.D. Compliance Schedule .........................................
I.E. Prevention of Air Pollution Emergency Episodes
I.F. Air Quality Surveillance .......................................
I.G. Review of New Sources and Modifications ........
I.H. Source Surveillance ............................................
I.I. Resources ............................................................
I.J. Intergovernmental Cooperation ...........................
I. Appendix A. South Dakota Compiled Laws ...........
II. Part D Plan for Total Suspended Particulate ........
III. SIP to meet Air Quality Monitoring and public
notification requirements.
IV. Lead (Pb) SIP ......................................................
V. Stack Height Demonstration Analysis ..................
VI. Commitment to revise stack height rules ............
VII. PM10 Committal SIP ............................................
VIII. Small Business Technical and Environmental
Compliance Program.
IX. Commitment regarding permit exceedances of
the PM10 standard in Rapid City.
X. CAA 110(a)(D)(2)(i) Interstate Transport Requirements for the 1997 8-hr Ozone and PM2.5
NAAQS.
XI. 1997 Ozone NAAQS Infrastructure Certification
XII. South Dakota Regional Haze State Implementation Plan, Amended.
XIII. Section 110(a)(2) Infrastructure Requirements
for the 1997 and 2006 PM2.5 NAAQS.
XIV. Section 110(a)(2) Infrastructure Requirements
for the 2008 Lead NAAQS.
XV. Section 110(a)(3) Infrastructure Requirements
for the 2008 8-hour Ozone NAAQS.
XVI. Section 110(a)(2) Infrastructure Requirements
for the 2010 NO2 NAAQS.
XVII. SDCL (South Dakota Codified Laws), 1–40–
25.1.
XVIII. South Dakota Codified Laws, 34–A–1–57,
34–A–1–58, 34–A–1–59, and 34–A–1–60.
VerDate Sep<11>2014
16:43 Dec 22, 2015
Jkt 238001
PO 00000
Frm 00050
Fmt 4700
Sfmt 4700
Final rule citation, date
59 FR 53589, 10/25/94.
E:\FR\FM\23DER1.SGM
23DER1
Comments
Federal Register / Vol. 80, No. 246 / Wednesday, December 23, 2015 / Rules and Regulations
ENVIRONMENTAL PROTECTION
AGENCY
Environmental Protection Agency, 1200
Pennsylvania Ave. NW., Washington,
DC 20460–0001; main telephone
number: (703) 305–7090; email address:
RDFRNotices@epa.gov.
SUPPLEMENTARY INFORMATION:
40 CFR Part 180
I. General Information
[EPA–HQ–OPP–2013–0700; FRL–9939–39]
A. Does this action apply to me?
[FR Doc. 2015–32216 Filed 12–22–15; 8:45 am]
BILLING CODE 6560–50–P
Ammonium Acetate; Exemption From
the Requirement of a Tolerance
Environmental Protection
Agency (EPA).
ACTION: Final rule.
AGENCY:
This regulation establishes an
exemption from the requirement of a
tolerance for residues of ammonium
acetate (CAS No. 631–61–8) when used
as an inert ingredient (buffering agent)
limited to 15% in pesticide
formulations applied to pre-harvested
crops. Exponent Inc., 1150 Connecticut
Ave., Suite 1100, Washington, DC 20036
on behalf of the Gowan Company LLC.,
370 South Main Street, Yuma, AZ 85364
submitted a petition to EPA under the
Federal Food, Drug, and Cosmetic Act
(FFDCA), requesting establishment of an
exemption from the requirement of a
tolerance. This regulation eliminates the
need to establish a maximum
permissible level for residues of
ammonium acetate.
DATES: This regulation is effective
December 23, 2015. Objections and
requests for hearings must be received
on or before February 22, 2016, and
must be filed in accordance with the
instructions provided in 40 CFR part
178 (see also Unit I.C. of the
SUPPLEMENTARY INFORMATION).
ADDRESSES: The docket for this action,
identified by docket identification (ID)
number EPA–HQ–OPP–2013–0700, is
available at https://www.regulations.gov
or at the Office of Pesticide Programs
Regulatory Public Docket (OPP Docket)
in the Environmental Protection Agency
Docket Center (EPA/DC), West William
Jefferson Clinton Bldg., Rm. 3334, 1301
Constitution Ave. NW., Washington, DC
20460–0001. The Public Reading Room
is open from 8:30 a.m. to 4:30 p.m.,
Monday through Friday, excluding legal
holidays. The telephone number for the
Public Reading Room is (202) 566–1744,
and the telephone number for the OPP
Docket is (703) 305–5805. Please review
the visitor instructions and additional
information about the docket available
at https://www.epa.gov/dockets.
FOR FURTHER INFORMATION CONTACT:
Susan Lewis, Registration Division
(7505P), Registration Division (7505P),
Office of Pesticide Programs,
asabaliauskas on DSK5VPTVN1PROD with RULES
SUMMARY:
VerDate Sep<11>2014
16:43 Dec 22, 2015
Jkt 238001
You may be potentially affected by
this action if you are an agricultural
producer, food manufacturer, or
pesticide manufacturer. The following
list of North American Industrial
Classification System (NAICS) codes is
not intended to be exhaustive, but rather
provides a guide to help readers
determine whether this document
applies to them. Potentially affected
entities may include:
• Crop production (NAICS code 111).
• Animal production (NAICS code
112).
• Food manufacturing (NAICS code
311).
• Pesticide manufacturing (NAICS
code 32532).
B. How can I get electronic access to
other related information?
You may access a frequently updated
electronic version of 40 CFR part 180
through the Government Printing
Office’s e-CFR site at https://
www.ecfr.gov/cgi-bin/textidx?&c=ecfr&tpl=/ecfrbrowse/Title40/
40tab_02.tpl.
C. How can I file an objection or hearing
request?
Under FFDCA section 408(g), 21
U.S.C. 346a, any person may file an
objection to any aspect of this regulation
and may also request a hearing on those
objections. You must file your objection
or request a hearing on this regulation
in accordance with the instructions
provided in 40 CFR part 178. To ensure
proper receipt by EPA, you must
identify docket ID number EPA–HQ–
OPP–2013–0700 in the subject line on
the first page of your submission. All
objections and requests for a hearing
must be in writing, and must be
received by the Hearing Clerk on or
before February 22, 2016. Addresses for
mail and hand delivery of objections
and hearing requests are provided in 40
CFR 178.25(b).
In addition to filing an objection or
hearing request with the Hearing Clerk
as described in 40 CFR part 178, please
submit a copy of the filing (excluding
any Confidential Business Information
(CBI)) for inclusion in the public docket.
Information not marked confidential
pursuant to 40 CFR part 2 may be
disclosed publicly by EPA without prior
PO 00000
Frm 00051
Fmt 4700
Sfmt 4700
79705
notice. Submit the non-CBI copy of your
objection or hearing request, identified
by docket ID number EPA–HQ–OPP–
2013–0700, by one of the following
methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the online
instructions for submitting comments.
Do not submit electronically any
information you consider to be CBI or
other information whose disclosure is
restricted by statute.
• Mail: OPP Docket, Environmental
Protection Agency Docket Center (EPA/
DC), (28221T), 1200 Pennsylvania Ave.
NW., Washington, DC 20460–0001.
• Hand Delivery: To make special
arrangements for hand delivery or
delivery of boxed information, please
follow the instructions at https://
www.epa.gov/dockets/contacts.html.
Additional instructions on commenting
or visiting the docket, along with more
information about dockets generally, is
available at https://www.epa.gov/
dockets.
II. Petition for Exemption
In the Federal Register of December
30, 2013 (78 FR79359) (FRL–9903–69),
EPA issued a document pursuant to
FFDCA section 408, 21 U.S.C. 346a,
announcing the filing of a pesticide
petition (PP IN–10604) by Exponent
Inc., 1150 Connecticut Ave., Suite 1100,
Washington, DC 20036, on behalf of the
Gowan Company LLC., 370 South Main
Street, Yuma, AZ 85364. The petition
requested that 40 CFR 180.920 be
amended by establishing an exemption
from the requirement of a tolerance for
residues of ammonium acetate (CAS No.
631–61–8) when used as an inert
ingredient in pesticide formulations
applied to crops pre-harvest and limited
to 15% in pesticide formulations. That
document referenced a summary of the
petition prepared by Exponent Inc., on
behalf of the Gowan Company LLC, the
petitioner, which is available in the
docket, https://www.regulations.gov. No
comments were received on the notice
of filing. EPA’s response to these
comments is discussed in Unit V.C.
III. Inert Ingredient Definition
Inert ingredients are all ingredients
that are not active ingredients as defined
in 40 CFR 153.125 and include, but are
not limited to, the following types of
ingredients (except when they have a
pesticidal efficacy of their own):
Solvents such as alcohols and
hydrocarbons; surfactants such as
polyoxyethylene polymers and fatty
acids; carriers such as clay and
diatomaceous earth; thickeners such as
carrageenan and modified cellulose;
wetting, spreading, and dispersing
E:\FR\FM\23DER1.SGM
23DER1
Agencies
[Federal Register Volume 80, Number 246 (Wednesday, December 23, 2015)]
[Rules and Regulations]
[Pages 79695-79705]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-32216]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R08-OAR-2015-0429; FRL-9939-87-Region 8]
Air Plan Approval; SD; Update to Materials Incorporated by
Reference
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule; administrative change.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) is updating the
materials that are incorporated by reference (IBR) into the South
Dakota State Implementation Plan (SIP). The Regulations affected by
this update have been previously submitted by the South Dakota
Department of Environment and Natural Resources (SD DENR) and approved
by the EPA. In this action, the EPA is also notifying the public of
corrections to typographical errors and minor formatting changes to the
IBR tables. This update affects the SIP materials that are available
for public inspection at the EPA Regional Office.
DATES: This action is effective December 23, 2015.
ADDRESSES: The EPA has established a docket for this action under
Docket Identification Number EPA-R08-OAR-2015-0429. All documents in
the docket are listed on the https://www.regulations.gov Web site.
Although listed in the index, some information may not be publicly
available, i.e., Confidential Business Information or other information
the disclosure of which is restricted by statute. Certain other
material, such as copyrighted material, is not placed on the Internet
and will be publicly available only in the hard copy form. Publicly
available
[[Page 79696]]
docket materials are available either electronically through https://www.regulations.gov or in hard copy at EPA Region 8, Office of
Partnerships and Regulatory Assistance, Air Program, 1595 Wynkoop
Street, Denver, Colorado, 80202-1129. The EPA requests that you contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section to
view the hard copy of the docket. An electronic copy of the State's SIP
compilation is also available at https://www.epa.gov/region8/air/sip.html.
FOR FURTHER INFORMATION CONTACT: Kathy Ayala, Air Program, U.S.
Environmental Protection Agency (EPA), Region 8, Mailcode 8P-AR, 1595
Wynkoop Street, Denver, Colorado 80202-1129, (303) 312-6142,
ayala.kathy@epa.gov.
SUPPLEMENTARY INFORMATION:
I. Background
The SIP is a living document which a state revises as necessary to
address its unique air pollution problems. Therefore, the EPA, from
time to time, must take action on SIP revisions containing new and/or
revised regulations as being part of the SIP. On May 22, 1997 (62 FR
27968), the EPA revised the procedures for incorporating by reference
Federally-approved SIPs, as a result of consultation between the EPA
and the Office of the Federal Register (OFR). The description of the
revised SIP document, IBR procedures and ``Identification of Plan''
format are discussed in further detail in the May 22, 1997, Federal
Register document. On March 8, 2005 (70 FR 11125) the EPA published the
revised format of the IBR material for South Dakota as of November 15,
2004. Today's action is an update to the March 8, 2005 document.
II. EPA Action
In this action, the EPA is announcing the update to the IBR
material as of October 1, 2015. The EPA is also correcting
typographical errors, including omission and other minor errors in
subsection 52.2170, paragraphs (c), (d), and (e).
III. Incorporation by Reference
In this action, EPA is finalizing regulatory text that includes
incorporation by reference. In accordance with requirements of 1 CFR
51.5, EPA is finalizing the incorporation by reference of the South
Dakota regulations described in the amendments to 40 CFR part 52 set
forth below. EPA has made, and will continue to make, these documents
generally available electronically through www.regulations.gov and/or
in hard copy at the appropriate EPA office (see the ADDRESSES section
of this preamble for more information).
IV. Good Cause Exemption
EPA has determined that today's action falls under the ``good
cause'' exemption in section 553(b)(3)(B) of the Administrative
Procedure Act (APA) which, upon a finding of ``good cause'' authorizes
agencies to dispense with public participation, and section 553(d)(3),
which allows an agency to make a rule effective immediately (thereby
avoiding the 30-day delayed effective date otherwise provided for in
the APA). Today's action simply updates the codification of provisions
which are already in effect as a matter of law.
Under section 553 of the APA, an agency may find good cause where
procedures are ``impractical, unnecessary, or contrary to the public
interest.'' Public comment is ``unnecessary'' and ``contrary to the
public interest'' since the codification only reflects existing law.
Likewise, there is no purpose served by delaying the effective date of
this action.
V. Statutory and Executive Order Reviews
A. General Requirements
Under Executive Order 12866 (58 FR 51735, October 4, 1993), this
action is not a ``significant regulatory action'' and is therefore not
subject to review by the Office of Management and Budget. This rule is
not subject to Executive Order 13211, ``Actions Concerning Regulations
That Significantly Affect Energy Supply, Distribution, or Use'' (66 FR
28355, May 22, 2001) because it is not a significant regulatory action
under Executive Order 12866. Because the agency has made a ``good
cause'' finding that this action is not subject to notice-and-comment
requirements under the Administrative Procedure Act or any other
statute as indicated in the SUPPLEMENTARY INFORMATION section, it is
not subject to the regulatory flexibility provisions of the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.), or to sections 202 and 205 of
the Unfunded Mandates Reform Act of 1995 (UMRA) (Pub. L. 104-4). In
addition, this action does not significantly or uniquely affect small
governments or impose a significant intergovernmental mandate, as
described in sections 203 and 204 of UMRA. This rule also does not have
a substantial direct effect on one or more Indian tribes, on the
relationship between the federal government and Indian tribes, or on
the distribution of power and responsibilities between the federal
government and Indian tribes, as specified by Executive Order 13175 (65
FR 67249, November 9, 2000), nor will it have substantial direct
effects on the states, on the relationship between the national
government and the states, or on the distribution of power and
responsibilities among the various levels of government, as specified
in Executive Order 13132 (64 FR 43255, August 10, 1999). This rule also
is not subject to Executive Order 13045 (62 FR 19885, April 23, 1997),
because it is not economically significant. This rule does not involve
technical standards; thus the requirements of section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) do not apply. The rule also does not involve special
consideration of environmental justice related issues as required by
Executive Order 12898 (59 FR 7629, February 16, 1994). This rule does
not impose an information collection burden under the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). EPA's compliance with
these statutes and Executive Orders for the underlying rules are
discussed in previous actions taken on the state's rules.
B. Submission to Congress and the Comptroller General
The Congressional Review Act (5 U.S.C. 801 et seq.), as added by
the Small Business Regulatory Enforcement Fairness Act of 1996,
generally provides that before a rule may take effect, the agency
promulgating the rule must submit a rule report, which includes a copy
of the rule, to each House of the Congress and to the Comptroller
General of the United States. Section 808 allows the issuing agency to
make a rule effective sooner than otherwise provided by the CRA if the
agency makes a good cause finding that notice and public procedure is
impracticable, unnecessary or contrary to the public interest. This
action simply codifies provisions which are already in effect as a
matter of law in federal and approved state programs. 5 U.S.C. 808(2).
As stated previously, EPA has made such a good cause finding and
established an effective date of December 23, 2015. EPA will submit a
report containing this rule and other required information to the U.S.
Senate, the U.S. House of Representatives, and the Comptroller General
of the United States prior to publication of the rule in the Federal
Register. This change to the identification of plan for South Dakota is
not a ``major rule'' as defined by 5 U.S.C. 804(2).
[[Page 79697]]
In this rule, EPA is finalizing regulatory text that includes
incorporation by reference. In accordance with requirements of 1 CFR
51.5, EPA is finalizing the incorporation by reference of the South
Dakota regulations described in the amendments to 40 CFR part 52 set
forth below. EPA has made, and will continue to make, these documents
generally available electronically through www.regulations.gov and/or
in hard copy at the appropriate EPA office (see the ADDRESSES section
of this preamble for more information).
C. Petitions for Judicial Review
EPA has also determined that the provisions of section 307(b)(1) of
the Clean Air Act pertaining to petitions for judicial review are not
applicable to this action. Prior EPA rulemaking actions for each
individual component of the South Dakota SIP compilation had previously
afforded interested parties the opportunity to file a petition for
judicial review in the United States Court of Appeals for the
appropriate circuit within 60 days of such rulemaking action. Thus, EPA
sees no need in this action to reopen the 60-day period for filing such
petitions for judicial review for this ``Identification of plan''
update action for South Dakota.
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Carbon monoxide,
Incorporation by reference, Intergovernmental relations, Lead, Nitrogen
dioxide, Ozone, Particulate matter, Reporting and recordkeeping
requirements, Sulfur oxides, Volatile organic compounds.
Dated: December 4, 2015.
Shaun L. McGrath,
Regional Administrator, Region 8.
40 CFR part 52 is amended as follows:
PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
0
1. The authority citation for part 52 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
Subpart QQ--South Dakota
0
2. In Sec. 52.2170 paragraphs (b), (c), (d) and (e) are revised to
read as follows:
Sec. 52.2170 Identification of plan.
* * * * *
(b) Incorporation by reference. (1) Material listed in paragraphs
(c) and (d) of this section with an EPA approval date prior to October
1, 2015, was approved for incorporation by reference by the Director of
the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part
51. Material is incorporated as it exists on the date of the approval,
and notice of any change in the material will be published in the
Federal Register. Entries in paragraphs (c) and (d) of this section
with EPA approval dates after October 1, 2015, will be incorporated by
reference in the next update to the SIP compilation.
(2) EPA Region 8 certifies that the rules/regulations provided by
EPA in the SIP compilation at the addresses in paragraph (b)(3) of this
section are an exact duplicate of the officially promulgated state
rules/regulations which have been approved as part of the SIP as of
October 1, 2015.
(3) Copies of the materials incorporated by reference may be
inspected at the EPA Region 8 Office, Office of Partnerships and
Regulatory Assistance (OPRA), Air Program, 1595 Wynkoop Street, Denver,
Colorado 80202-1129.
(c) EPA-approved regulations.
--------------------------------------------------------------------------------------------------------------------------------------------------------
State EPA effective
Rule No. Rule title effective date date Final rule citation, date Comments
--------------------------------------------------------------------------------------------------------------------------------------------------------
Statewide
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:09:01. Procedures--Board of Minerals and Environment, Contested Case Procedure
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:09:01:20................... Board member 5/29/14 3/2/15 80 FR 4799, 1/29/15...............
conflict of
interest.
74:09:01:21................... Board member 5/29/14 3/2/15 80 FR 4799, 1/29/15...............
potential
conflict of
interests.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:01. Definitions
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:01:01................... Definitions...... 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
74:36:01:03................... Administrative 4/4/99 5/7/03 68 FR 16726, 4/7/03...............
permit amendment
defined.
74:36:01:04................... Affected states 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
defined.
74:36:01:05................... Applicable 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
requirements of
Clean Air Act
defined.
74:36:01:06................... Complete 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
application
defined.
74:36:01:08................... Major source 4/4/99 5/19/14 79 FR 21852, 4/18/14..............
defined.
74:36:01:09................... Categories of 1/2/05 10/13/06 71 FR 46403, 8/14/06..............
sources defined.
74:36:01:10................... Modification 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
defined.
74:36:01:11................... National ambient 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
air quality
standard (NAAQS).
74:36:01:12................... Potential to emit 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
defined.
74:36:01:13................... Process weight 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
rate defined.
[[Page 79698]]
74:36:01:15................... Regulated air 1/5/95 5/19/14 79 FR 21852, 4/18/14..............
pollutant
defined.
74:36:01:16................... Responsible 1/2/05 10/13/06 71 FR 46403, 8/14/06..............
official defined.
74:36:01:18................... Municipal solid 12/29/96 12/18/98 63 FR 55804, 10/19/98.............
waste landfill
defined.
74:36:01:19................... Existing 12/29/96 12/18/98 63 FR 55804, 10/19/98.............
municipal solid
waste landfill
defined.
74:36:01:20................... Physical change 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
or change in the
method of
operation
defined.
74:36:01:21................... Commence 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
construction
defined.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:02. Ambient Air Quality
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:02:01................... Air quality goals 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
74:36:02:02................... Ambient air 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
quality
standards.
74:36:02:03................... Methods of 6/25/13 11/2/15 80 FR 59620,10/2/15...............
sampling and
analysis.
74:36:02:04................... Air quality 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
monitoring
network.
74:36:02:05................... Air quality 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
monitoring
requirements.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:03. Air Quality Episodes
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:03:01................... Air pollution 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
emergency
episode.
74:36:03:02................... Episode emergency 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
contingency plan.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:04. Operating Permits for Minor Sources
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:04:01................... Applicability.... 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
74:36:04:02................... Minor source 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
operating permit
required.
74:36:04:02.01................ Minor source 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
operating permit
exemption.
74:36:04:03................... Emission unit 6/28/10 7/28/14 79 FR 36419, 6/28/14..............
exemptions.
74:36:04:04................... Standard for 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
issuance of a
minor source
operating permit.
74:36:04:05................... Time period for 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
operating
permits and
renewals.
74:36:04:06................... Timely and 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
complete
application for
operating permit
required.
74:36:04:07................... Required contents 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
of complete
application for
operating permit.
74:36:04:08................... Applicant 1/5/95 12/18/98 63 FR 55804, 10/19/98.............
required to
supplement or
correct
application.
74:36:04:09................... Permit 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
application--Com
pleteness review.
74:36:04:10................... Time period for 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
department's
recommendation.
[[Page 79699]]
74:36:04:11................... Department's 4/4/99 5/7/03 68 FR 16726, 4/7/03...............
recommendation
on operating
permit.
74:36:04:12................... Public 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
participation in
permitting
process.
74:36:04:12.01................ Public review of 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
department's
draft permit.
74:36:04:13................... Final permit 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
decision--Notice
to interested
persons.
74:36:04:14................... Right to petition 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
for contested
case hearing.
74:36:04:15................... Contents of 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
operating permit.
74:36:04:16................... Operating permit 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
expiration.
74:36:04:17................... Renewal of 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
operating permit.
74:36:04:18................... Operating permit 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
revision.
74:36:04:19................... Administrative 4/4/99 5/7/03 68 FR 16726, 4/7/03...............
permit amendment.
74:36:04:20................... Procedures for 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
administrative
permit
amendments.
74:36:04:20.01................ Minor permit 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
amendment
required.
74:36:04:20.02................ Requirements for 1/5/95 12/18/98 63 FR 55804, 10/19/98.............
minor permit
amendment.
74:36:04:20.03................ Application for 1/5/95 12/18/98 63 FR 55804, 10/19/98.............
minor permit
amendment.
74:36:04:20.04................ Department 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
deadline to
approve minor
permit amendment.
74:36:04:21................... Permit 1/5/95 12/18/98 63 FR 55804, 10/19/98.............
modifications.
74:36:04:22................... Source status 4/4/99 5/7/03 68 FR 16726, 4/7/03...............
change--new
permit required.
74:36:04:23................... Reopening 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
operating permit
for cause.
74:36:04:24................... Procedures to 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
reopen operating
permit.
74:36:04:27................... Operating permit 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
termination,
revision, and
revocation.
74:36:04:28................... Notice of 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
operating
noncompliance--C
ontents.
74:36:04:29................... Petition for 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
contested case
on alleged
violation.
74:36:04:31................... Circumvention of 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
emissions not
allowed.
74:36:04:32................... General permits.. 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
74:36:04:33................... Secretary may 9/1/03 7/9/04 69 FR 25839, 5/10/04..............
require an
individual
permit.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:06. Regulated Air Pollutant Emissions
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:06:01................... Applicability.... 1/5/95 12/18/98 63 FR 55804, 10/19/98.............
[[Page 79700]]
74:36:06:02................... Allowable 4/4/99 5/7/03 68 FR 16726, 4/7/03...............
emissions for
fuel-burning
units.
74:36:06:03................... Allowable 4/4/99 5/7/03 68 FR 16726, 4/7/03...............
emissions for
process industry
units.
74:36:06:04................... Particulate 1/2/05 10/13/06 71 FR 46403,8/14/06...............
emission
restrictions for
incinerators and
waste wood
burners.
74:36:06:05................... Most stringent 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
interpretation
applicable.
74:36:06:06................... Stack performance 1/2/05 10/13/06 71 FR 46403, 8/14/06..............
test.
74:36:06:07................... Open burning 4/4/99 5/7/03 68 FR 16726, 4/7/03...............
practices
prohibited.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:07. New Source Performance Standards
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:07:08................... Ash disposal 12/29/96 6/21/00 65 FR 32033, 5/22/00..............
requirements.
74:36:07:29................... Operating 4/22/93 11/6/95 60 FR 46222, 9/6/95...............
requirements for
wire reclamation
furnaces.
74:36:07:30................... Monitoring 4/22/93 11/6/95 60 FR 46222, 9/6/95...............
requirements for
wire reclamation
furnaces.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:09. Prevention of Significant Deterioration
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:09:01................... Applicability.... 9/18/06 1/22/08 72 FR 72617, 12/21/07.............
74:36:09:01.01................ Prevention of 9/18/06 1/22/08 72 FR 72617, 12/21/07.............
significant
deterioration
permit required.
74:36:09:02................... Prevention of 6/25/13 3/2/15 80 FR 4799, 1/29/15...............
significant
deterioration.
74:36:09:03................... Public 6/25/13 3/2/15 80 FR 4799, 1/29/15...............
participation.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:10. New Source Review
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:10:01................... Applicability.... 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
74:36:10:02................... Definitions...... 6/25/13 7/28/14 79 FR 36419, 6/27/14..............
74:36:10:03.01................ New source review 6/25/13 7/28/14 79 FR 36419, 6/27/14..............
preconstruction
permit required.
74:36:10:05................... New source review 6/25/13 7/28/14 79 FR 36419, 6/27/14..............
preconstruction
permit.
74:36:10:06................... Causing or 9/1/03 7/9/04 69 FR 25839, 5/10/04..............
contributing to
violation of any
national ambient
air quality
standard.
74:36:10:07................... Determining 6/25/13 7/28/14 79 FR 36419, 6/27/14..............
credit for
emission offsets.
74:36:10:08................... Projected actual 6/25/13 7/28/14 79 FR 36419, 6/27/14..............
emissions.
74:36:10:09................... Clean unit test 1/2/05 10/13/06 71 FR 46403, 8/14/06..............
for emission
units subject to
lowest
achievable
emission rate.
74:36:10:10................... Clean unit test 1/2/05 10/13/06 71 FR 46403, 8/14/06..............
for emission
units comparable
to lowest
achievable
emission rate.
--------------------------------------------------------------------------------------------------------------------------------------------------------
[[Page 79701]]
74:36:11. Performance Testing
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:11:01................... Stack performance 6/25/13 11/2/15 80 FR 59620,10/2/15...............
testing or other
testing methods.
74:36:11:02................... Secretary may 12/29/96 12/18/98 63 FR 55804, 10/19/98.............
require
performance
tests.
74:36:11:03................... Notice to 12/29/96 12/18/98 63 FR 55804, 10/19/98.............
department of
performance test.
74:36:11:04................... Testing new fuels 4/4/99 4/3/00 65 FR 5264, 2/3/00................
or raw materials.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:12. Control of Visible Emissions
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:12:01................... Restrictions on 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
visible
emissions.
74:36:12:02................... Exceptions to 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
restrictions.
74:36:12:03................... Exceptions 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
granted to
alfalfa
pelletizers or
dehydrators.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:13. Continuous Emission Monitoring Systems
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:13:01................... Secretary may 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
require
continuous
emission
monitoring
systems (CEMS).
74:36:13:02................... Minimum 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
performance
specifications
for all
continuous
emission
monitoring
systems.
74:36:13:03................... Reporting 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
requirements.
74:36:13:04................... Notice to 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
department of
exceedance.
74:36:13:05................... Compliance 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
determined by
data from
continuous
emission monitor.
74:36:13:06................... Compliance 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
certification.
74:36:13:07................... Credible evidence 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
74:36:13:08................... Compliance 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
assurance
monitoring.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:17. Rapid City Street Sanding and Deicing
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:17:01................... Applicability.... 2/11/96 8/9/02 67 FR 39619, 6/10/02..............
74:36:17:02................... Reasonable 2/11/96 8/9/02 67 FR 39619, 6/10/02..............
available
control
technology.
74:36:17:03................... Street sanding 2/11/96 8/9/02 67 FR 39619, 6/10/02..............
specifications.
74:36:17:04................... Street deicing 2/11/96 8/9/02 67 FR 39619, 6/10/02..............
and maintenance
plan.
74:36:17:05................... Street sanding 2/11/96 8/9/02 67 FR 39619, 6/10/02..............
and sweeping
recordkeeping.
74:36:17:06................... Inspection 2/11/96 8/9/02 67 FR 39619, 6/10/02..............
authority.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:18. Regulations for State Facilities in the Rapid City Area
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:18:01................... Definitions...... 7/1/02 3/22/04 69 FR 2671,1/20/04................
74:36:18:02................... Applicability.... 7/1/02 3/22/04 69 FR 2671, 1/20/04...............
74:36:18:03................... Permit required.. 7/1/02 3/22/04 69 FR 2671, 1/20/04...............
[[Page 79702]]
74:36:18:04................... Time period for 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
permits and
renewals.
74:36:18:05................... Required contents 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
of a complete
application for
a permit.
74:36:18:06................... Contents of 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
permit.
74:36:18:07................... Permit expiration 7/1/02 3/22/04 69 FR 2671, 1/20/04...............
74:36:18:08................... Renewal of permit 7/1/02 3/22/04 69 FR 2671, 1/20/04...............
74:36:18:09................... Reasonably 7/1/02 3/22/04 69 FR 2671, 1/20/04...............
available
control
technology
required.
74:36:18:10................... Visible emission 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
limit for
construction and
continuous
operation
activities.
74:36:18:11................... Exception to 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
visible emission
limit.
74:36:18:12................... Notice of 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
operating
noncompliance--C
ontents.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:20. Construction Permits for New Sources or Modifications
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36.20.01................... Applicability.... 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
74:36:20:02................... Construction 4/20/11 7/28/14 79 FR 36419, 6/27/14..............
permit required.
74:36:20:03................... Construction 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
permit exemption.
74:36:20:04................... Emission unit 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
exemptions.
74:36:20:05................... Standard for 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
issuance of
construction
permit.
74:36:20:06................... Timely and 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
complete
application for
a construction
permit required.
74:36:20:07................... Required contents 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
of complete
application for
a construction
permit.
74:36:20:08................... Applicant 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
required to
supplement or
correct
application.
74:36:20:09................... Permit 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
application--Com
pleteness review.
74:36:20:10................... Time period for 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
department's
recommendation.
74:36:20:11................... Public 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
participation in
permitting
process.
74:36:20:12................... Public review of 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
department's
draft permit.
74:36:20:13................... Final permit 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
decision--Notice
to interested
persons.
74:36:20:14................... Right to petition 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
for contested
case hearing.
74:36:20:15................... Contents of 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
construction
permit.
74:36:20:16................... Administrative 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
permit amendment.
74:36:20:17................... Procedures for 6/28/10 7/28/14 79 FR 36149, 6/27/14..............
administrative
permit
amendments.
[[Page 79703]]
74:36:20:18................... Reopening 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
construction
permit for cause.
74:36:20:19................... Procedures to 6/28/10 7/28/14 79 FR 36149, 6/27/14..............
reopen
construction
permit.
74:36:20:20................... Construction 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
permit does not
exempt from
other
requirements.
74:36:20:21................... Expiration of a 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
construction
permit.
74:36:20:22................... Notice of 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
constructing or
operating
noncompliance--C
ontents.
74:36:20:23................... Petition for 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
contested case
on alleged
violation.
74:36:20:24................... Circumvention of 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
emissions not
allowed.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:21. Regional Haze Program
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:21:01................... Applicability.... 12/7/10 5/29/12 77 FR 24845, 4/26/12..............
74:36:21:02................... Definitions...... 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
74:36:21:03................... Existing 12/7/10 5/29/12 77 FR 24845, 4/26/12..............
stationary
facility defined.
74:36:21:04................... Visibility impact 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
analysis.
74:36:21:05................... BART 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
determination.
74:36:21:06................... BART 9/19/11 5/29/12 77 FR 24845, 4/26/12..............
determination
for a BART-
eligible coal-
fired power
plant.
74:36:21:07................... Installation of 12/7/10 5/29/12 77 FR 24845, 4/26/12..............
controls based
on visibility
impact analysis
or BART
determination.
74:36:21:08................... Operation and 12/7/10 5/29/12 77 FR 24845, 4/26/12..............
maintenance of
controls.
74:36:21:09................... Monitoring, 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
recordkeeping,
and reporting.
74:36:21:10................... Permit to 12/7/10 5/29/12 77 FR 24845, 4/26/12..............
construct.
74:36:21:11................... Permit required 12/7/10 5/29/12 77 FR 24845, 4/26/12..............
for BART
determination.
74:36:21:12................... Federal land 12/7/10 5/29/12 77 FR 24845, 4/26/12..............
manager
notification and
review.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Pennington
--------------------------------------------------------------------------------------------------------------------------------------------------------
Ordinance #12--Fugitive Dust Regulation--1.0 Control of Fugitive Dust
--------------------------------------------------------------------------------------------------------------------------------------------------------
1.1........................... Applicability.... 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
1.2........................... Definitions...... 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
1.3........................... Standard of 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
compliance.
1.4........................... Reasonably 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
available
control
technology
required.
1.5........................... Fugitive dust 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
control permits
required for
construction
activities,
i.e., temporary
operations.
[[Page 79704]]
1.6........................... Compliance plans 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
and schedules
required, i.e.,
continuous
operations.
1.7........................... Enforcement 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
procedures.
1.8........................... Establishment of 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
administrative
mechanisms.
1.9........................... Separability..... 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
--------------------------------------------------------------------------------------------------------------------------------------------------------
(d) EPA-approved source specific requirements.
--------------------------------------------------------------------------------------------------------------------------------------------------------
State EPA effective
Rule No. Rule title effective date date Final rule citation, date Comments
--------------------------------------------------------------------------------------------------------------------------------------------------------
(AQ 79-02.)................... South Dakota 3/18/82 8/7/83 48 FR 31199, 7/7/83...............
State University
steam generating
plant.
--------------------------------------------------------------------------------------------------------------------------------------------------------
(e) EPA-approved nonregulatory provisions.
--------------------------------------------------------------------------------------------------------------------------------------------------------
State EPA effective
Rule title effective date date Final rule citation, date Comments
--------------------------------------------------------------------------------------------------------------------------------------------------------
I.A. Introduction................... 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
I.B. Legal Authority................ 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
I.C. Control Strategy............... 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
I.D. Compliance Schedule............ 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
I.E. Prevention of Air Pollution 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
Emergency Episodes.
I.F. Air Quality Surveillance....... 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
I.G. Review of New Sources and 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
Modifications.
I.H. Source Surveillance............ 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
I.I. Resources...................... 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
I.J. Intergovernmental Cooperation.. 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
I. Appendix A. South Dakota Compiled 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
Laws.
II. Part D Plan for Total Suspended 12/27/78 8/30/79 44 FR 44494, 7/30/79....................
Particulate.
III. SIP to meet Air Quality 1/21/80 10/4/80 45 FR 58528, 9/4/80.....................
Monitoring and public notification
requirements.
IV. Lead (Pb) SIP................... 5/4/84 10/26/84 49 FR 37752, 9/26/84....................
V. Stack Height Demonstration 8/20/86 7/7/89 54 FR 24334, 6/7/89.....................
Analysis.
VI. Commitment to revise stack 5/11/88 10/2/88 53 FR 34077, 9/2/88.....................
height rules.
VII. PM10 Committal SIP............. 7/12/88 11/5/90 55 FR 40831, 10/5/90....................
VIII. Small Business Technical and 1/12/94 12/27/94 59 FR 53589, 10/25/94...................
Environmental Compliance Program.
IX. Commitment regarding permit 11/16/95 7/10/02 67 FR 39619, 6/10/02....................
exceedances of the PM10 standard in
Rapid City.
X. CAA 110(a)(D)(2)(i) Interstate 4/19/07 7/7/08 73 FR 26019, 5/8/08.....................
Transport Requirements for the 1997
8-hr Ozone and PM2.5 NAAQS.
XI. 1997 Ozone NAAQS Infrastructure 2/1/08 8/22/11 76 FR 43912, 7/22/11....................
Certification.
XII. South Dakota Regional Haze 4/26/12 5/29/12 77 FR 24845, 4/26/12....................
State Implementation Plan, Amended.
XIII. Section 110(a)(2) 3/4/11 3/2/15 80 FR 4799, 1/29/15.....................
Infrastructure Requirements for the
1997 and 2006 PM2.5 NAAQS.
XIV. Section 110(a)(2) 10/10/12 3/2/15 80 FR 4799, 1/29/15.....................
Infrastructure Requirements for the
2008 Lead NAAQS.
XV. Section 110(a)(3) Infrastructure 5/21/13 3/2/15 80 FR 4799, 1/29/15.....................
Requirements for the 2008 8-hour
Ozone NAAQS.
XVI. Section 110(a)(2) 10/23/13 3/2/15 80 FR 4799, 1/29/15.....................
Infrastructure Requirements for the
2010 NO2 NAAQS.
XVII. SDCL (South Dakota Codified 3/2/15 3/2/15 80 FR 4799, 1/29/15.....................
Laws), 1-40-25.1.
XVIII. South Dakota Codified Laws, 7/1/93 12/27/94 59 FR 53589, 10/25/94...................
34-A-1-57, 34-A-1-58, 34-A-1-59,
and 34-A-1-60.
--------------------------------------------------------------------------------------------------------------------------------------------------------
[[Page 79705]]