Combined Notice of Filings #1, 79587-79588 [2015-32122]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 245 / Tuesday, December 22, 2015 / Notices
Station, and a segment of Line Q, all
located in Forest and Warren Counties,
Pennsylvania, as more fully set forth in
the application which is on file with the
Commission and open to public
inspection. The filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to David W.
Reitz, Deputy General Counsel for
National Fuel, 6363 Main Street,
Williamsville, New York 14221; by
calling (716) 857–7949; by faxing (716)
857–7206; or by emailing reitzd@
natfuel.com.
Specifically, National Fuel proposes
to abandon by sale all of the facilities
comprising its Queen Storage Field,
including an approximately 5.5 mile
segment of its Line Q. These facilities
are proposed to be sold to EmKey
Gathering LLC which plans to operate
them as part of its non-jurisdictional
gathering facilities. In order to maintain
service to existing utility customers,
National Fuel seeks authorization to
construct and operate approximately 5
miles of new 4-inch diameter plastic
pipe traversing along or adjacent to the
existing Line Q right-of-way.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
VerDate Sep<11>2014
17:21 Dec 21, 2015
Jkt 238001
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
79587
and 7 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on January 6, 2016.
Dated: December 16, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32127 Filed 12–21–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1790–013;
ER10–2595–003; ER12–1400–004;
ER10–276–004.
Applicants: BP Energy Company, Flat
Ridge Wind Energy, LLC, Flat Ridge 2
Wind Energy LLC, Rolling Thunder I
Power Partners, LLC.
Description: Updated Market Power
Analysis for Southwest Power Pool
Region of BP Energy Company, et al.
under ER10–1790, et al.
Filed Date: 12/15/15.
Accession Number: 20151215–5242.
Comments Due: 5 p.m. ET 2/12/16.
Docket Numbers: ER15–1345–003.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2015–
12–15_SMEPA Compliance 2nd
Amendment to be effective 6/1/2015.
Filed Date: 12/16/15.
Accession Number: 20151216–5043.
Comments Due: 5 p.m. ET 1/6/16.
Docket Numbers: ER15–2019–001
Applicants: Wisconsin Electric Power
Company.
Description: Market-Based Triennial
Review Filing: Wisconsin Electric
Amended Triennial MBR Filing in
ER15–2019–001 to be effective 8/25/
2015.
Filed Date: 12/15/15.
Accession Number: 20151215–5230.
Comments Due: 5 p.m. ET 1/5/16.
Docket Numbers: ER16–534–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Section 205(d) Rate
Filing: 2015–12–15_Coordinated
Transaction Scheduling Filing to be
effective 3/1/2017.
Filed Date: 12/15/15.
Accession Number: 20151215–5234.
Comments Due: 5 p.m. ET 1/5/16.
Docket Numbers: ER16–535–000.
E:\FR\FM\22DEN1.SGM
22DEN1
mstockstill on DSK4VPTVN1PROD with NOTICES
79588
Federal Register / Vol. 80, No. 245 / Tuesday, December 22, 2015 / Notices
Applicants: PJM Interconnection,
L.L.C.
Description: Section 205(d) Rate
Filing: PJM Revisions to OATT, OA and
MISO–PJM JOA re Coordinated
Transaction Scheduling to be effective
3/1/2017.
Filed Date: 12/15/15.
Accession Number: 20151215–5236.
Comments Due: 5 p.m. ET 1/5/16.
Docket Numbers: ER16–536–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Section 205(d) Rate
Filing: PJM Revisions to OATT, OA and
MISO–PJM JOA re Coordinated
Transaction Scheduling to be effective
3/1/2017.
Filed Date: 12/15/15.
Accession Number: 20151215–5237.
Comments Due: 5 p.m. ET 1/5/16.
Docket Numbers: ER16–537–000.
Applicants: Wisconsin Electric Power
Company.
Description: Tariff Cancellation:
Wisconsin Electric Cancellation of
Pending Tariff Record in ER15–2019–
000 to be effective 8/25/2015.
Filed Date: 12/15/15.
Accession Number: 20151215–5238.
Comments Due: 5 p.m. ET 1/5/16.
Docket Numbers: ER16–538–000.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: Section 205(d) Rate
Filing: Removal of Requirement to
Publish De-List Bid Pricing Information
to be effective 2/14/2016.
Filed Date: 12/16/15.
Accession Number: 20151216–5028.
Comments Due: 5 p.m. ET 1/6/16.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF16–245–000.
Applicants: Graphic Packaging
International Inc.
Description: Form 556 of Graphic
Packaging International Inc. [West
Monroe].
Filed Date: 12/15/15.
Accession Number: 20151215–5240.
Comments Due: None Applicable.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
VerDate Sep<11>2014
17:21 Dec 21, 2015
Jkt 238001
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 16, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32122 Filed 12–21–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–144–000]
Florida Gas Transmission Company,
LLC; Notice of Revised Schedule for
Environmental Review of the
Jacksonville Expansion Project
This notice identifies the Federal
Energy Regulatory Commission staff’s
revised schedule for the completion of
the environmental assessment (EA) for
the Florida Gas Transmission Company,
LLC’s Jacksonville Expansion Project.
The first notice of schedule, issued on
November 12, 2015, identified
December 18, 2015 as the EA issuance
date. However, staff has revised the
schedule for issuance of the EA.
Schedule for Environmental Review
Issuance of EA: January 15, 2016
90-day Federal Authorization Decision
Deadline: April 14, 2016
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription
www.ferc.gov/docs-filing/
esubscription.asp.
Dated: December 16, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32125 Filed 12–21–15; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14737–000]
Energy Resources USA Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On November 26, 2015, Energy
Resources USA Inc., filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of a hydropower project to be located at
the U.S. Army Corps of Engineers’
(Corps) Tom Bevill Lock and Dam on
the Tombigbee River near the town of
Aliceville in Pickens County, Alabama.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) A 770-foot-long, 300foot-wide intake channel with a 85-footlong retaining wall; (2) a 131-foot-long,
82-foot-wide powerhouse containing
four generating units with a total
capacity of 15.5 megawatts; (3) a 1000foot-long, 220-foot-wide tailrace with a
40-foot-long retaining wall; (4) a 4.16/69
kilo-Volt (kV) substation; and (5) a 3mile-long, 69 kV transmission line. The
proposed project would have an
estimated average annual generation of
84,440 megawatt-hours, and operate as
directed by the Corps.
Applicant Contact: Mr. Ander
Gonzalez, Energy Resources USA Inc.,
2655 Le Jeune Road, Suite 804, Coral
Gables, Florida 33134; Phone: (954)
248–8425; Email: agonzalez@
energyresources.es.
FERC Contact: Christiane Casey,
christiane.casey@ferc.gov, (202) 502–
8577.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
E:\FR\FM\22DEN1.SGM
22DEN1
Agencies
[Federal Register Volume 80, Number 245 (Tuesday, December 22, 2015)]
[Notices]
[Pages 79587-79588]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-32122]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1790-013; ER10-2595-003; ER12-1400-004; ER10-
276-004.
Applicants: BP Energy Company, Flat Ridge Wind Energy, LLC, Flat
Ridge 2 Wind Energy LLC, Rolling Thunder I Power Partners, LLC.
Description: Updated Market Power Analysis for Southwest Power Pool
Region of BP Energy Company, et al. under ER10-1790, et al.
Filed Date: 12/15/15.
Accession Number: 20151215-5242.
Comments Due: 5 p.m. ET 2/12/16.
Docket Numbers: ER15-1345-003.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Compliance filing: 2015-12-15_SMEPA Compliance 2nd
Amendment to be effective 6/1/2015.
Filed Date: 12/16/15.
Accession Number: 20151216-5043.
Comments Due: 5 p.m. ET 1/6/16.
Docket Numbers: ER15-2019-001
Applicants: Wisconsin Electric Power Company.
Description: Market-Based Triennial Review Filing: Wisconsin
Electric Amended Triennial MBR Filing in ER15-2019-001 to be effective
8/25/2015.
Filed Date: 12/15/15.
Accession Number: 20151215-5230.
Comments Due: 5 p.m. ET 1/5/16.
Docket Numbers: ER16-534-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Section 205(d) Rate Filing: 2015-12-15_Coordinated
Transaction Scheduling Filing to be effective 3/1/2017.
Filed Date: 12/15/15.
Accession Number: 20151215-5234.
Comments Due: 5 p.m. ET 1/5/16.
Docket Numbers: ER16-535-000.
[[Page 79588]]
Applicants: PJM Interconnection, L.L.C.
Description: Section 205(d) Rate Filing: PJM Revisions to OATT, OA
and MISO-PJM JOA re Coordinated Transaction Scheduling to be effective
3/1/2017.
Filed Date: 12/15/15.
Accession Number: 20151215-5236.
Comments Due: 5 p.m. ET 1/5/16.
Docket Numbers: ER16-536-000.
Applicants: PJM Interconnection, L.L.C.
Description: Section 205(d) Rate Filing: PJM Revisions to OATT, OA
and MISO-PJM JOA re Coordinated Transaction Scheduling to be effective
3/1/2017.
Filed Date: 12/15/15.
Accession Number: 20151215-5237.
Comments Due: 5 p.m. ET 1/5/16.
Docket Numbers: ER16-537-000.
Applicants: Wisconsin Electric Power Company.
Description: Tariff Cancellation: Wisconsin Electric Cancellation
of Pending Tariff Record in ER15-2019-000 to be effective 8/25/2015.
Filed Date: 12/15/15.
Accession Number: 20151215-5238.
Comments Due: 5 p.m. ET 1/5/16.
Docket Numbers: ER16-538-000.
Applicants: ISO New England Inc., New England Power Pool
Participants Committee.
Description: Section 205(d) Rate Filing: Removal of Requirement to
Publish De-List Bid Pricing Information to be effective 2/14/2016.
Filed Date: 12/16/15.
Accession Number: 20151216-5028.
Comments Due: 5 p.m. ET 1/6/16.
Take notice that the Commission received the following qualifying
facility filings:
Docket Numbers: QF16-245-000.
Applicants: Graphic Packaging International Inc.
Description: Form 556 of Graphic Packaging International Inc. [West
Monroe].
Filed Date: 12/15/15.
Accession Number: 20151215-5240.
Comments Due: None Applicable.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: December 16, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-32122 Filed 12-21-15; 8:45 am]