Advanced Hydropower, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On August 3, 2015, Advanced
Hydropower, Inc. filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the McNary Dam Advanced
Hydropower Project (McNary Dam
Project or project) to be located at U.S.
Corps of Engineers’ McNary Dam near
Plymouth in Benton County,
Washington and Umatilla in Umatilla
County, Oregon. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would utilize
flows at the existing McNary Dam, and
would consist of the following new
features: (1) A 52-foot-wide, 40-foothigh gated intake located on the
upstream side of McNary Dam; (2) a 32foot-wide, 34-foot-high, 234-foot-long
concrete penstock installed through
McNary Dam; (3) a 34-megawatt vertical
shaft Alden turbine; (4) a draft tube
discharging flows to the existing
McNary Dam tailrace; (5) a 1.24-milelong, 13.8- or 23-kilovolt transmission
line interconnecting with the existing
McNary Dam switchyard; and (6)
appurtenant facilities. The estimated
annual generation of the McNary Dam
Project would be 148.92 gigawatt-hours.
Applicant Contact: Mr. Kurt Ross,
Advanced Hydropower, Inc., 925
Fairgrounds Road, Goldendale,
Washington 98620; phone: (509) 773–
5650.
FERC Contact: Sean O’Neill; phone:
(202) 502–6462.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
VerDate Sep<11>2014
17:21 Dec 15, 2015
Jkt 238001
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14697–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14697) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: December 10, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–31612 Filed 12–15–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filing Instituting Proceedings
Docket Numbers: RP15–1257–000.
Applicants: ANR Pipeline Company.
Description: Informational Filing,
submitted out of time, in compliance
with October 22, 2015 Letter Order of
ANR Pipeline Company under RP15–
1257.
Filed Date: 12/9/15.
Accession Number: 20151209–5021.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: RP16–291–000.
Applicants: Alliance Pipeline L.P.
Description: § 4(d) rate filing per
154.204: J. Aron Contract Amendment
to be effective 12/1/2015.
Filed Date: 12/9/15.
Accession Number: 20151209–5004.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: RP16–291–000.
Applicants: Alliance Pipeline L.P.
Description: § 4(d) rate filing per
154.204: J. Aron Contract Amendment
to be effective 12/1/2015.
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
Filed Date: 12/9/15.
Accession Number: 20151209–5004.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: RP16–292–000.
Applicants: Alliance Pipeline L.P.
Description: Compliance filing per
154.203: Reinstate AOS to be effective
12/1/2015.
Filed Date: 12/9/15.
Accession Number: 20151209–5071.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: RP16–293–000.
Applicants: Equitrans, L.P.
Description: § 4(d) rate filing per
154.204: Update LPS and FLPS Form of
Service Agreements to be effective 1/9/
2016.
Filed Date: 12/9/15.
Accession Number: 20151209–5077.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: RP16–294–000.
Applicants: Southern Star Central Gas
Pipeline, Inc.
Description: Compliance filing per
154.203: Capacity Release Waiver Filing
to be effective N/A.
Filed Date: 12/9/15.
Accession Number: 20151209–5120.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: RP16–295–000.
Applicants: Eastern Shore Natural Gas
Company.
Description: § 4(d) rate filing per
154.204: Filing of Negotiated Rate
Agreement to be effective 11/1/2015.
Filed Date: 12/9/15.
Accession Number: 20151209–5121.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: CP16–26–000.
Applicants: MoGas Pipeline LLC.
Description: Abandonment Authority
and for a Certificate of Public
Convenience.
Filed Date: 11/30/2015.
Accession Number: 20151130–5452.
Comments Due: 5 p.m. ET 12/28/
2015.
Docket Numbers: PR16–8–000.
Applicants: Washington 10 Storage
Corporation.
Description: Tariff filing per
284.123(e)/.224: Update of Statement of
Operating Conditions to be effective 12/
8/2015.
Filed Date: 12/7/15.
Accession Number: 201512075094.
Comments/Protests Due: 5 p.m. ET
12/28/15.
Docket Numbers: PR16–5–000.
Applicants: Southern California Gas
Company.
Description: Tariff filing per
284.123(b)(1)/.: New Rate Filing to be
effective 12/1/2015.
Filed Date: 12/2/15.
Accession Number: 201512025225.
Comments/Protests Due: 5 p.m. ET
12/23/15.
E:\FR\FM\16DEN1.SGM
16DEN1
Agencies
[Federal Register Volume 80, Number 241 (Wednesday, December 16, 2015)]
[Notices]
[Page 78218]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-31612]
[[Page 78218]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[14697-000]
Advanced Hydropower, Inc.; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On August 3, 2015, Advanced Hydropower, Inc. filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of the McNary Dam
Advanced Hydropower Project (McNary Dam Project or project) to be
located at U.S. Corps of Engineers' McNary Dam near Plymouth in Benton
County, Washington and Umatilla in Umatilla County, Oregon. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would utilize flows at the existing McNary
Dam, and would consist of the following new features: (1) A 52-foot-
wide, 40-foot-high gated intake located on the upstream side of McNary
Dam; (2) a 32-foot-wide, 34-foot-high, 234-foot-long concrete penstock
installed through McNary Dam; (3) a 34-megawatt vertical shaft Alden
turbine; (4) a draft tube discharging flows to the existing McNary Dam
tailrace; (5) a 1.24-mile-long, 13.8- or 23-kilovolt transmission line
interconnecting with the existing McNary Dam switchyard; and (6)
appurtenant facilities. The estimated annual generation of the McNary
Dam Project would be 148.92 gigawatt-hours.
Applicant Contact: Mr. Kurt Ross, Advanced Hydropower, Inc., 925
Fairgrounds Road, Goldendale, Washington 98620; phone: (509) 773-5650.
FERC Contact: Sean O'Neill; phone: (202) 502-6462.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14697-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14697) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: December 10, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-31612 Filed 12-15-15; 8:45 am]
BILLING CODE 6717-01-P