Buckeye Pipe Line Transportation, LLC; Notice of Petition for Declaratory Order, 77624 [2015-31476]
Download as PDF
asabaliauskas on DSK5VPTVN1PROD with NOTICES
77624
Federal Register / Vol. 80, No. 240 / Tuesday, December 15, 2015 / Notices
350, 351 and 352 to be effective 11/9/
2015.
Filed Date: 12/9/15.
Accession Number: 20151209–5109.
Comments Due: 5 p.m. ET 12/30/15.
Docket Numbers: ER16–483–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Bylaws Section 6.2 Revisions to Expand
the Strategic Planning Committee to be
effective 2/7/2016.
Filed Date: 12/9/15.
Accession Number: 20151209–5031.
Comments Due: 5 p.m. ET 12/30/15.
Docket Numbers: ER16–484–000.
Applicants: CenterPoint Energy
Houston Electric, LLC.
Description: § 205(d) Rate Filing: TFO
Tariff Interim Rate Revision to Conform
with PUCT-Approved ERCOT Rate to be
effective 11/23/2015.
Filed Date: 12/9/15.
Accession Number: 20151209–5041.
Comments Due: 5 p.m. ET 12/30/15.
Docket Numbers: ER16–485–000.
Applicants: Golden Hills
Interconnection, LLC.
Description: Baseline eTariff Filing:
Golden Hills Interconnection SFA with
Golden Hills, and Golden Hills North to
be effective 12/10/2015.
Filed Date: 12/9/15.
Accession Number: 20151209–5072.
Comments Due: 5 p.m. ET 12/30/15.
Docket Numbers: ER16–486–000.
Applicants: Credit Suisse Energy,
LLC.
Description: Tariff Cancellation:
Notice of Cancellation of Market-Based
Rate Tariff to be effective 12/31/2015.
Filed Date: 12/9/15.
Accession Number: 20151209–5101.
Comments Due: 5 p.m. ET 12/30/15.
Docket Numbers: ER16–487–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
Transmission Access Charge Balancing
Account Adjustment (TACBAA) 2016 to
be effective 3/1/2016.
Filed Date: 12/9/15.
Accession Number: 20151209–5105.
Comments Due: 5 p.m. ET 12/30/15.
Docket Numbers: ER16–488–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revise PJM–MISO JOA section 9.4 re:
Interregional Market Eff. Project Criteria
to be effective 2/8/2016.
Filed Date: 12/9/15.
Accession Number: 20151209–5107.
Comments Due: 5 p.m. ET 12/30/15.
Docket Numbers: ER16–489–000.
Applicants: PJM Interconnection,
L.L.C.
VerDate Sep<11>2014
17:08 Dec 14, 2015
Jkt 238001
Description: § 205(d) Rate Filing: SA
No. 4311, First Revised SA No. 4218
and Cancellation of SA No. 4180 to be
effective 11/9/2015.
Filed Date: 12/9/15.
Accession Number: 20151209–5110.
Comments Due: 5 p.m. ET 12/30/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–31466 Filed 12–14–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR16–5–000]
Buckeye Pipe Line Transportation,
LLC; Notice of Petition for Declaratory
Order
Take notice that on November 24,
2015, pursuant to Rule 207(a)(2) of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.207(a)(2)(2015),
Buckeye Pipe Line Transportation, LLC
filed a petition requesting a declaratory
order approving the overall tariff and
rate structure, prorationing provisions,
and other terms of service for a new
interstate common carrier pipeline
(Project). The Project is expected to
transport refined petroleum products
from Michigan and Ohio, to destination
points in Ohio and Pennsylvania and
will obtain the additional capacity
through the use of underutilized leased
capacity, construction of new pipelines
and tanks, upgrades to existing pipeline
manifolds, replacement of certain
mainline pumps, and a reconfiguration
of existing pipeline, as more fully
explained in the petition.
PO 00000
Frm 00025
Fmt 4703
Sfmt 9990
Any person desiring to intervene or to
protest in this proceeding must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above proceeding
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov. or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on December 24, 2015.
Dated: December 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–31476 Filed 12–14–15; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\15DEN1.SGM
15DEN1
Agencies
[Federal Register Volume 80, Number 240 (Tuesday, December 15, 2015)]
[Notices]
[Page 77624]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-31476]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. OR16-5-000]
Buckeye Pipe Line Transportation, LLC; Notice of Petition for
Declaratory Order
Take notice that on November 24, 2015, pursuant to Rule 207(a)(2)
of the Commission's Rules of Practice and Procedure, 18 CFR
385.207(a)(2)(2015), Buckeye Pipe Line Transportation, LLC filed a
petition requesting a declaratory order approving the overall tariff
and rate structure, prorationing provisions, and other terms of service
for a new interstate common carrier pipeline (Project). The Project is
expected to transport refined petroleum products from Michigan and
Ohio, to destination points in Ohio and Pennsylvania and will obtain
the additional capacity through the use of underutilized leased
capacity, construction of new pipelines and tanks, upgrades to existing
pipeline manifolds, replacement of certain mainline pumps, and a
reconfiguration of existing pipeline, as more fully explained in the
petition.
Any person desiring to intervene or to protest in this proceeding
must file in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or
before 5:00 p.m. Eastern time on the specified comment date. Protests
will be considered by the Commission in determining the appropriate
action to be taken, but will not serve to make protestants parties to
the proceeding. Any person wishing to become a party must file a notice
of intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Petitioner.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The filings in the above proceeding are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive email notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please email FERCOnlineSupport@ferc.gov. or
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern time on December 24, 2015.
Dated: December 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-31476 Filed 12-14-15; 8:45 am]
BILLING CODE 6717-01-P