Tennessee Gas Pipeline Company, L.L.C; Notice of Schedule for Environmental Review of the Triad Expansion Project, 77619 [2015-31467]
Download as PDF
77619
Federal Register / Vol. 80, No. 240 / Tuesday, December 15, 2015 / Notices
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above proceeding
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov.or
call (866) 208-3676 (toll free). For TTY,
call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern time
on December 31, 2015.
Dated: December 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–31478 Filed 12–14–15; 8:45 am]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–520–000]
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Tennessee Gas Pipeline Company,
L.L.C; Notice of Schedule for
Environmental Review of the Triad
Expansion Project
On June 19, 2015, Tennessee Gas
Pipeline Company, L.L.C. (Tennessee)
filed an application in Docket No.
CP15–520–000 requesting authorization
pursuant to Section 7(c) of the Natural
Gas Act to construct and operate certain
natural gas pipeline facilities. The
proposed project is known as the Triad
Expansion Project (Project), and would
deliver an additional 180,000
dekatherms per day of natural gas to
meet the needs of a new natural gasfired power plant to be constructed in
Lackawanna County, Pennsylvania.
On July 6, 2015, the Federal Energy
Regulatory Commission (Commission or
FERC) issued its Notice of Application
for the Project. Among other things, that
notice alerted agencies issuing federal
authorizations of the requirement to
complete all necessary reviews and to
reach a final decision on a request for
a federal authorization within 90 days of
18:55 Dec 14, 2015
Schedule for Environmental Review
Issuance of EA
April 6, 2016
90-day Federal Authorization Decision
Deadline
July 5, 2016
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
Tennessee would construct about 7.0
miles of new 36-inch-diameter looping 1
pipeline adjacent to its existing 300 Line
system in Susquehanna County,
Pennsylvania; a new internal pipeline
inspection (pig) 2 launcher, crossover,
and connecting facilities at the
beginning of the proposed pipeline
loop; and a new pig receiver, a new
odorant facility, and ancillary piping at
the existing Compressor Station 321 in
Susquehanna County, Pennsylvania.
Background
BILLING CODE 6717–01–P
VerDate Sep<11>2014
the date of issuance of the Commission
staff’s Environmental Assessment (EA)
for the Project. This instant notice
identifies the FERC staff’s planned
schedule for the completion of the EA
for the Project.
Jkt 238001
On August 5, 2015, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Triad Expansion Project and
Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. In response to
the NOI, the Commission received
comments from the United States Army
Corps of Engineers; Pennsylvania
Department of Conservation and Natural
Resources; the Stockbridge-Munsee
Tribal Historic Preservation Office; the
Allegheny Defense Project; and one
individual. The primary issues raised
during scoping relate to impacts on
soils, wetlands, waterbodies, vegetation,
and wildlife; recreation and impacts on
cultural resources; reliability and safety
concerns; and review of project
alternatives.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
1 A pipeline loop is a segment of pipe constructed
parallel to an existing pipeline to increase capacity.
2 A ‘‘pig’’ is a tool that the pipeline company
inserts into and pushes through the pipeline for
cleaning the pipeline, conducting internal
inspections, or other purposes.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s
Office of External Affairs at (866) 208–
FERC or on the FERC Web site
(www.ferc.gov). Using the ‘‘eLibrary’’
link, select ‘‘General Search’’ from the
eLibrary menu, enter the selected date
range and ‘‘Docket Number’’ excluding
the last three digits (i.e., CP15–520), and
follow the instructions. For assistance
with access to eLibrary, the helpline can
be reached at (866) 208–3676, TTY (202)
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
Web site also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
Dated: December 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–31467 Filed 12–14–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Conference
Docket Nos.
Public Service Company of Colorado.
Black Hills/Colorado Electric Utility Company LP.
ER15–237–004
ER15–326–001
ER16–178–000
ER16–180–000
ER15–295–003
ER15–348–003
ER16–212–000
ER16–217–000
On Tuesday, December 15, 2015,
Commission staff will meet with Public
Service Company of Colorado (PSCo) in
Washington, DC. The purpose of the
meeting is to discuss matters related to
the filings submitted by PSCo and Black
Hills/Colorado Electric Utility Company
LP in the above-captioned proceedings,
including matters related to: (1) The
cost-based rate cap for energy provided
E:\FR\FM\15DEN1.SGM
15DEN1
Agencies
[Federal Register Volume 80, Number 240 (Tuesday, December 15, 2015)]
[Notices]
[Page 77619]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-31467]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP15-520-000]
Tennessee Gas Pipeline Company, L.L.C; Notice of Schedule for
Environmental Review of the Triad Expansion Project
On June 19, 2015, Tennessee Gas Pipeline Company, L.L.C.
(Tennessee) filed an application in Docket No. CP15-520-000 requesting
authorization pursuant to Section 7(c) of the Natural Gas Act to
construct and operate certain natural gas pipeline facilities. The
proposed project is known as the Triad Expansion Project (Project), and
would deliver an additional 180,000 dekatherms per day of natural gas
to meet the needs of a new natural gas-fired power plant to be
constructed in Lackawanna County, Pennsylvania.
On July 6, 2015, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA April 6, 2016
90-day Federal Authorization Decision Deadline July 5, 2016
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
Tennessee would construct about 7.0 miles of new 36-inch-diameter
looping \1\ pipeline adjacent to its existing 300 Line system in
Susquehanna County, Pennsylvania; a new internal pipeline inspection
(pig) \2\ launcher, crossover, and connecting facilities at the
beginning of the proposed pipeline loop; and a new pig receiver, a new
odorant facility, and ancillary piping at the existing Compressor
Station 321 in Susquehanna County, Pennsylvania.
---------------------------------------------------------------------------
\1\ A pipeline loop is a segment of pipe constructed parallel to
an existing pipeline to increase capacity.
\2\ A ``pig'' is a tool that the pipeline company inserts into
and pushes through the pipeline for cleaning the pipeline,
conducting internal inspections, or other purposes.
---------------------------------------------------------------------------
Background
On August 5, 2015, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed Triad Expansion
Project and Request for Comments on Environmental Issues (NOI). The NOI
was sent to affected landowners; federal, state, and local government
agencies; elected officials; environmental and public interest groups;
Native American tribes; other interested parties; and local libraries
and newspapers. In response to the NOI, the Commission received
comments from the United States Army Corps of Engineers; Pennsylvania
Department of Conservation and Natural Resources; the Stockbridge-
Munsee Tribal Historic Preservation Office; the Allegheny Defense
Project; and one individual. The primary issues raised during scoping
relate to impacts on soils, wetlands, waterbodies, vegetation, and
wildlife; recreation and impacts on cultural resources; reliability and
safety concerns; and review of project alternatives.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's
Office of External Affairs at (866) 208-FERC or on the FERC Web
site (www.ferc.gov). Using the ``eLibrary'' link, select ``General
Search'' from the eLibrary menu, enter the selected date range and
``Docket Number'' excluding the last three digits (i.e., CP15-520), and
follow the instructions. For assistance with access to eLibrary, the
helpline can be reached at (866) 208-3676, TTY (202) 502-8659, or at
FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC Web site also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: December 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-31467 Filed 12-14-15; 8:45 am]
BILLING CODE 6717-01-P