Albany Engineering Corporation; Notice of Successive Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 76283 [2015-30849]
Download as PDF
Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Notices
Affiliate Waiver to be effective 11/1/
2015.
Filed Date: 12/2/15.
Accession Number: 20151202–5116.
Comments Due: 5 p.m. ET 12/23/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 2, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30845 Filed 12–7–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14387–001]
Lhorne on DSK9F6TC42PROD with NOTICES
Albany Engineering Corporation;
Notice of Successive Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
On September 22, 2015, Albany
Engineering Corporation filed an
application for a successive preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of hydropower at
the New York State Canal Corporation’s
Lock C1 Dam located on the Hudson
River in Saratoga and Rensselaer
Counties, New York. The sole purpose
of a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed Waterford
Hydroelectric Project would consist of
the following: (1) An existing 672-foot-
VerDate Sep<11>2014
14:17 Dec 07, 2015
Jkt 238001
long and 15-foot-high ogee-shaped
concrete gravity dam with a 356-footlong tainter-gated structure forming the
eastern portion of the dam; (2) an
existing impoundment having a surface
area of 400 acres and a storage capacity
of 5,000 acre-feet at the spillway crest
elevation of 28.3 feet National Geodetic
Vertical Datum; (3) either a new
powerhouse at the east end of the dam
with two identical turbine generator
units with a total installed capacity of
10.2 megawatts (MW) (Scenario 1), or
two new identical modular floating
barge-type structures at the west end of
the tainter gates housing 18 turbinegenerator units with a total installed
capacity of 4.0 MW (Scenario 2); (4) a
proposed 10,000-foot-long, 34.5-kilovolt
transmission line; and (5) appurtenant
facilities. The proposed project would
have an annual generation of 39,000
megawatt-hours (MWh) (Scenario 1) or
12,000 MWh (Scenario 2).
Applicant Contact: Wendy Jo Carey,
Albany Engineering Corporation, 5
Washington Square, Albany, NY 12205;
phone: (518) 456–7712.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14387–001.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14387) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
76283
Dated: December 2, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30849 Filed 12–7–15; 8:45 am]
BILLING CODE 6717–01–P
FEDERAL COMMUNICATIONS
COMMISSION
Radio Broadcasting Services; AM or
FM Proposals To Change the
Community of License
Federal Communications
Commission.
ACTION: Notice.
AGENCY:
The following applicants filed
AM or FM proposals to change the
community of license: Actualidad
1040AM Licensee, LLC, Station WLVJ,
Facility ID 4341, BP–20150706ACT,
From Boynton Beach, FL, To Miami, FL;
Actualidad 990AM Licensee, LLC,
Station WMYM, Facility ID 12833, BP–
20150706ACS, From Miami, FL, To
Kendall, FL; Actualidad Licensee
1020AM, LLC, Station WURN, Facility
ID 3607, BP- 20150706ACU, From
Kendall, FL, To Boynton Beach, FL;
Alpha Media Licensee, LLC, Station
NEW, Facility ID 198622, BNPH–
20151013AIK, From Longview, TX, To
Atlanta, TX; Costa-Eagle Radio Ventures
Limited Partnership, Station WMVX,
Facility ID 22798, BP–20151119AYB,
From Beverly, MA, To Methuen, MA;
EDB VV License, LLC, Station KXFM,
Facility ID 5470, BPH–20151110ANR,
From Santa Maria, CA, To Montecito,
CA; Educational Media Foundation,
Station NEW, Facility ID 198724,
BNPH–20151013AGJ, From Baggs, WY,
To Yampa, CO; Jackman Holding
Company, LLC, Station NEW, Facility
ID 198745, BNPH–20151013ADJ, From
Moro, OR, To White Salmon, WA;
Katherine Pyeatt, Station NEW, Facility
ID 190004, BNPH–20111013ACU, From
Midway, TX, To Groveton, TX;
Northeast Colorado Broadcasting, LLC,
Station NEW, Facility ID 198758,
BNPH–20151013ADX, From Akron, CO,
To Eckley, CO; Northway Broadcasting,
Station NEW, Facility ID 190452,
BNPH–20120530AOI, From Silver
Springs, NV, To Fallon, NV; Summit
Broadcasting II, LLC, Station NEW,
Facility ID 198794, BNPH–
20151013AAM, From McCall, ID, To
Silver City, ID.
DATES: The agency must receive
comments on or before February 8,
2016.
SUMMARY:
Federal Communications
Commission, 445 Twelfth Street SW.,
Washington, DC 20554.
ADDRESSES:
E:\FR\FM\08DEN1.SGM
08DEN1
Agencies
[Federal Register Volume 80, Number 235 (Tuesday, December 8, 2015)]
[Notices]
[Page 76283]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-30849]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14387-001]
Albany Engineering Corporation; Notice of Successive Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
To Intervene, and Competing Applications
On September 22, 2015, Albany Engineering Corporation filed an
application for a successive preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA), proposing to study the feasibility
of hydropower at the New York State Canal Corporation's Lock C1 Dam
located on the Hudson River in Saratoga and Rensselaer Counties, New
York. The sole purpose of a preliminary permit, if issued, is to grant
the permit holder priority to file a license application during the
permit term. A preliminary permit does not authorize the permit holder
to perform any land-disturbing activities or otherwise enter upon lands
or waters owned by others without the owners' express permission.
The proposed Waterford Hydroelectric Project would consist of the
following: (1) An existing 672-foot-long and 15-foot-high ogee-shaped
concrete gravity dam with a 356-foot-long tainter-gated structure
forming the eastern portion of the dam; (2) an existing impoundment
having a surface area of 400 acres and a storage capacity of 5,000
acre-feet at the spillway crest elevation of 28.3 feet National
Geodetic Vertical Datum; (3) either a new powerhouse at the east end of
the dam with two identical turbine generator units with a total
installed capacity of 10.2 megawatts (MW) (Scenario 1), or two new
identical modular floating barge-type structures at the west end of the
tainter gates housing 18 turbine-generator units with a total installed
capacity of 4.0 MW (Scenario 2); (4) a proposed 10,000-foot-long, 34.5-
kilovolt transmission line; and (5) appurtenant facilities. The
proposed project would have an annual generation of 39,000 megawatt-
hours (MWh) (Scenario 1) or 12,000 MWh (Scenario 2).
Applicant Contact: Wendy Jo Carey, Albany Engineering Corporation,
5 Washington Square, Albany, NY 12205; phone: (518) 456-7712.
FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14387-001.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14387) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: December 2, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-30849 Filed 12-7-15; 8:45 am]
BILLING CODE 6717-01-P