Natural Gas Pipeline Company of America, LLC; Notice of Schedule for Environmental Review of the Chicago Market Expansion Project, 76280-76281 [2015-30847]
Download as PDF
Lhorne on DSK9F6TC42PROD with NOTICES
76280
Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Notices
Panel. The Administrative Work
Meeting will be held at the Naval
Heritage Center, 701 Pennsylvania
Avenue NW., Washington, DC 20004.
Pursuant to 41 CFR 102–3.160, the
Administrative Work Meeting will be
closed to the public.
Written Statements: Pursuant to 41
CFR 102–3.140, the public or interested
organizations may submit written
statements to the membership of the
Panel at any time or in response to the
stated agenda of a planned meeting.
Written statements should be submitted
to the Panel’s Designated Federal Officer
(DFO). The DFO’s contact information
can be obtained from the General
Services Administration’s Federal
Advisory Committee Act Database at
https://facadatabase.gov/. Written
statements that do not pertain to the
scheduled meeting of the Panel may be
submitted at any time. However, if
individual comments pertain to a
specific topic being discussed at a
planned meeting, then these statements
must be submitted no later than 5
business days prior to the meeting in
question. The DFO will review all
submitted written statements and
provide copies to all the committee
members.
Public Comments: In addition to
written statements, the Panel will set
aside 1 hour for individuals or
interested groups to address the Panel.
To ensure consideration of their
comments, individuals and interested
groups should submit written
statements as outlined in this notice; but
if they still want to address the Panel,
then they will be afforded the
opportunity to register to address the
Panel. The Panel’s DFO will have a
‘‘Sign-Up Roster’’ available at the Panel
meeting for registration on a first-come,
first-serve basis. Those wishing to
address the Panel will be given no more
than 5 minutes to present their
comments, and at the end of the 1 hour
time period, no further public
comments will be accepted. Anyone
who signs-up to address the Panel, but
is unable to do so due to the time
limitation, may submit their comments
in writing; however, they must
understand that their written comments
may not be reviewed prior to the Panel’s
deliberation.
To ensure timeliness of comments for
the official record, the Panel encourages
that individuals and interested groups
consider submitting written statements
instead of addressing the Panel.
VerDate Sep<11>2014
14:17 Dec 07, 2015
Jkt 238001
Dated: December 3, 2015.
Aaron Siegel,
Alternate OSD Federal Register Liaison
Officer, Department of Defense.
Comments Due: 5 p.m. ET 12/23/15.
Docket Numbers: ER16–453–000.
Applicants: PJM Interconnection,
L.L.C., Northeast Transmission
Development, LLC.
[FR Doc. 2015–30861 Filed 12–7–15; 8:45 am]
Description: § 205(d) Rate Filing: NTD
BILLING CODE 5001–06–P
submits Attachment H—ATRR, Formula
Rate, and Formula Protocols to be
effective 2/1/2016.
DEPARTMENT OF ENERGY
Filed Date: 12/2/15.
Accession Number: 20151202–5207.
Federal Energy Regulatory
Comments Due: 5 p.m. ET 12/23/15.
Commission
The filings are accessible in the
Commission’s eLibrary system by
Combined Notice of Filings #2
clicking on the links or querying the
Take notice that the Commission
docket number.
received the following electric rate
Any person desiring to intervene or
filings:
protest in any of the above proceedings
must file in accordance with Rules 211
Docket Numbers: ER10–2331–048;
ER14–630–024; ER10–2319–039; ER10– and 214 of the Commission’s
2317–039; ER13–1351–021; ER10–2330– Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
046.
time on the specified comment date.
Applicants: J.P. Morgan Ventures
Protests may be considered, but
Energy Corporation, AlphaGen Power
intervention is necessary to become a
LLC, BE Alabama LLC, BE CA LLC,
Florida Power Development LLC, Utility party to the proceeding.
eFiling is encouraged. More detailed
Contract Funding, L.L.C.
information relating to filing
Description: Notice of Non-Material
requirements, interventions, protests,
Change in Status of JPMorgan Sellers.
service, and qualifying facilities filings
Filed Date: 12/2/15.
can be found at: https://www.ferc.gov/
Accession Number: 20151202–5154.
docs-filing/efiling/filing-req.pdf. For
Comments Due: 5 p.m. ET 12/23/15.
other information, call (866) 208–3676
Docket Numbers: ER16–98–001.
(toll free). For TTY, call (202) 502–8659.
Applicants: Windom Transmission,
Dated: December 2, 2015.
LLC.
Description: Tariff Amendment:
Nathaniel J. Davis, Sr.,
Amended Transmission and
Deputy Secretary.
Interconnection Agreement to be
[FR Doc. 2015–30846 Filed 12–7–15; 8:45 am]
effective 12/15/2015.
BILLING CODE 6717–01–P
Filed Date: 12/2/15.
Accession Number: 20151202–5184.
Comments Due: 5 p.m. ET 12/23/15.
DEPARTMENT OF ENERGY
Docket Numbers: ER16–450–000.
Federal Energy Regulatory
Applicants: RE Columbia Two LLC.
Commission
Description: Compliance filing:
Compliance Filing—RE Columbia Two
[Docket No. CP15–505–000]
Removal of Affiliate Waiver to be
Natural Gas Pipeline Company of
effective 11/1/2015.
America, LLC; Notice of Schedule for
Filed Date: 12/2/15.
Environmental Review of the Chicago
Accession Number: 20151202–5142.
Market Expansion Project
Comments Due: 5 p.m. ET 12/23/15.
Docket Numbers: ER16–451–000.
On June 1, 2015, Natural Gas Pipeline
Applicants: KCP&L Greater Missouri
Company of America, LLC (Natural)
Operations Company.
filed an application in Docket No.
Description: KCP&L Greater Missouri
CP15–505–000 requesting a Certificate
Operations Company Notice of
of Public Convenience and Necessity
Cancellation of Interconnection
pursuant to Section 7(c) of the Natural
Agreement.
Gas Act to construct and operate certain
Filed Date: 12/2/15.
natural gas pipeline facilities. The
Accession Number: 20151202–5174.
proposed project is known as the
Comments Due: 5 p.m. ET 12/23/15.
Chicago Market Expansion Project
Docket Numbers: ER16–452–000.
(Project), and would provide about
Applicants: RE Tranquillity LLC.
238,000 dekatherms of incremental
Description: Baseline eTariff Filing:
northbound firm transportation capacity
Application and Initial BaselineTariff
to the city of Chicago, Illinois and
Filing to be effective 12/3/2015.
neighboring areas.
Filed Date: 12/2/15.
On June 12, 2015, the Federal Energy
Accession Number: 20151202–5200.
Regulatory Commission (Commission or
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
E:\FR\FM\08DEN1.SGM
08DEN1
Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Notices
FERC) issued its Notice of Application
for the Project. Among other things, that
notice alerted agencies issuing federal
authorizations of the requirement to
complete all necessary reviews and to
reach a final decision on a request for
a federal authorization within 90 days of
the date of issuance of the Commission
staff’s Environmental Assessment (EA)
for the Project. This instant notice
identifies the FERC staff’s planned
schedule for the completion of the EA
for the Project.
SCHEDULE FOR ENVIRONMENTAL
REVIEW
Issuance of EA ...............
90-day Federal Authorization Decision Deadline.
January 11, 2016.
April 11, 2016.
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP15–505), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC Web site also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: December 2, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30847 Filed 12–7–15; 8:45 am]
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Project Description
The proposed Project would construct
a new 30,000 horsepower natural gasfired compressor station with suction
and discharge piping and ancillary
equipment in Livingston County,
Illinois.
Lhorne on DSK9F6TC42PROD with NOTICES
Background
On July 9, 2015, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Chicago Market Expansion
Project and Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. In response to
the NOI, the Commission received a
consultation letter from United States
Department of Agriculture regarding
impacts of farmland conversion.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
VerDate Sep<11>2014
14:17 Dec 07, 2015
Jkt 238001
Federal Energy Regulatory
Commission
[Docket No. ER16–438–000]
Marshall Wind Energy LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding Marshall
Wind Energy LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is December 22,
2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
76281
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: December 2, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30848 Filed 12–7–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14715–000]
Lock+TM Hydro Friends Fund XII;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On September 14, 2015, Lock+TM
Hydro Friends Fund XII filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Hepburn Street Dam
Hydroelectric Project (Hepburn Project
or project) to be located on West Branch
of the Susquehanna River, near
Williamsport, Lycoming County,
Pennsylvania. The Hepburn Street Dam
is owned by the state of Pennsylvania.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
E:\FR\FM\08DEN1.SGM
08DEN1
Agencies
[Federal Register Volume 80, Number 235 (Tuesday, December 8, 2015)]
[Notices]
[Pages 76280-76281]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-30847]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP15-505-000]
Natural Gas Pipeline Company of America, LLC; Notice of Schedule
for Environmental Review of the Chicago Market Expansion Project
On June 1, 2015, Natural Gas Pipeline Company of America, LLC
(Natural) filed an application in Docket No. CP15-505-000 requesting a
Certificate of Public Convenience and Necessity pursuant to Section
7(c) of the Natural Gas Act to construct and operate certain natural
gas pipeline facilities. The proposed project is known as the Chicago
Market Expansion Project (Project), and would provide about 238,000
dekatherms of incremental northbound firm transportation capacity to
the city of Chicago, Illinois and neighboring areas.
On June 12, 2015, the Federal Energy Regulatory Commission
(Commission or
[[Page 76281]]
FERC) issued its Notice of Application for the Project. Among other
things, that notice alerted agencies issuing federal authorizations of
the requirement to complete all necessary reviews and to reach a final
decision on a request for a federal authorization within 90 days of the
date of issuance of the Commission staff's Environmental Assessment
(EA) for the Project. This instant notice identifies the FERC staff's
planned schedule for the completion of the EA for the Project.
Schedule for Environmental Review
------------------------------------------------------------------------
------------------------------------------------------------------------
Issuance of EA........................ January 11, 2016.
90-day Federal Authorization Decision April 11, 2016.
Deadline.
------------------------------------------------------------------------
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
The proposed Project would construct a new 30,000 horsepower
natural gas-fired compressor station with suction and discharge piping
and ancillary equipment in Livingston County, Illinois.
Background
On July 9, 2015, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed Chicago Market
Expansion Project and Request for Comments on Environmental Issues
(NOI). The NOI was sent to affected landowners; federal, state, and
local government agencies; elected officials; environmental and public
interest groups; Native American tribes; other interested parties; and
local libraries and newspapers. In response to the NOI, the Commission
received a consultation letter from United States Department of
Agriculture regarding impacts of farmland conversion.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC Web site (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP15-505), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC
Web site also provides access to the texts of formal documents issued
by the Commission, such as orders, notices, and rule makings.
Dated: December 2, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-30847 Filed 12-7-15; 8:45 am]
BILLING CODE 6717-01-P