Air Plan Approval; ND; Update to Materials Incorporated by Reference, 76211-76219 [2015-30823]

Download as PDF Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Rules and Regulations approximately 500 feet of the Witt-Penn Bridge. It is categorically excluded from further review under paragraph 34(g) of Figure 2–1 of the Commandant Instruction. An environmental analysis checklist supporting this determination and a Categorical Exclusion Determination are available in the docket where indicated under ADDRESSES. We seek any comments or information that may lead to the discovery of a significant environmental impact from this rule. G. Protest Activities The Coast Guard respects the First Amendment rights of protesters. Protesters are asked to contact the person listed in the FOR FURTHER INFORMATION CONTACT section to coordinate protest activities so that your message can be received without jeopardizing the safety or security of people, places or vessels. List of Subjects in 33 CFR Part 165 Harbors, Marine safety, Navigation (water), Reporting and recordkeeping requirements, Security measures, Waterways. For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 165 as follows: PART 165—REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS 1. The authority citation for part 165 continues to read as follows: ■ Authority: 33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05–1, 6.04–1, 6.04–6, and 160.5; Department of Homeland Security Delegation No. 0170.1. ■ an official patrol vessel or may be on shore and will communicate with vessels via VHF–FM radio or loudhailer. In addition, members of the Coast Guard Auxiliary may be present to inform vessel operators of this regulation. (2) Official patrol vessels. Official patrol vessels may consist of any Coast Guard, Coast Guard Auxiliary, state, or local law enforcement vessels assigned or approved by the COTP. (c) Enforcement periods. (1) This safety zone is in effect permanently starting January 7, 2016, but will only be enforced when deemed necessary by the COTP. (2) The Coast Guard will rely on the methods described in § 165.7 to notify the public of the time and duration of any closure of the safety zone. Violations of this safety zone may be reported to the COTP at 718–354–4353 or on VHF-Channel 16. (d) Regulations. (1) The general regulations contained in § 165.23, as well as paragraphs (d)(2) and (3) of this section, apply. (2) During periods of enforcement, all persons and vessels must comply with all orders and directions from the COTP or a COTP’s designated representative. (3) During periods of enforcement, upon being hailed by a U.S. Coast Guard vessel by siren, radio, flashing light, or other means, the operator of the vessel must proceed as directed. Dated: November 6, 2015. M.H. Day, Captain, U.S. Coast Guard, Captain of the Port New York. [FR Doc. 2015–30907 Filed 12–7–15; 8:45 am] BILLING CODE 9110–04–P 2. Add § 165.162 to read as follows: Lhorne on DSK9F6TC42PROD with RULES § 165.162 Safety Zone; Witt-Penn Bridge Construction, Hackensack River, Jersey City, NJ. ENVIRONMENTAL PROTECTION AGENCY (a) Location. The following area is a safety zone: All waters from surface to bottom of the Hackensack River bound by the following approximate positions: North of a line drawn from 40°44′27.4″ N., 074°05′09.8″ W. to 40°44′22.9″ N., 074°04′53.1″ W. (NJ PATH Bridge at mile 3.0), and south of a line drawn from 40°44′33.2″ N., 074°04′51.0″ W. to 40°44′28.2″ N., 074°04′42.7″ W. (500 feet north of the new Witt-Penn Bridge) (NAD 83). (b) Definitions. The following definitions apply to this section: (1) Designated representative. A ‘‘designated representative’’ is any Coast Guard commissioned, warrant or petty officer of the U.S. Coast Guard who has been designated by the Captain of the Port (COTP) to act on his or her behalf. A designated representative may be on 40 CFR Part 52 VerDate Sep<11>2014 14:14 Dec 07, 2015 Jkt 238001 [EPA–R08–OAR–2013–0047; FRL–9932–60– Region 8] Air Plan Approval; ND; Update to Materials Incorporated by Reference Environmental Protection Agency (EPA). ACTION: Final rule; administrative change. AGENCY: The Environmental Protection Agency (EPA) is updating the materials that are incorporated by reference (IBR) into the North Dakota State Implementation Plan (SIP). The regulations affected by this update have been previously submitted by the North Dakota Department of Health and approved by the EPA. In this action, the SUMMARY: PO 00000 Frm 00011 Fmt 4700 Sfmt 4700 76211 EPA is also notifying the public of corrections to typographical errors and minor formatting changes to the IBR tables. This update affects the SIP materials that are available for public inspection at the EPA Regional Office. DATES: This action is effective December 8, 2015. ADDRESSES: The EPA has established a docket for this action under Docket Identification Number EPA–R08–OAR– 2013–0047. All documents in the docket are listed on the https:// www.regulations.gov Web site. Although listed in the index, some information may not be publicly available, i.e., Confidential Business Information or other information the disclosure of which is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in the hard copy form. Publicly available docket materials are available either electronically through https:// www.regulations.gov or in hard copy at EPA Region 8, Office of Partnership and Regulatory Assistance, Air Program, 1595 Wynkoop Street, Denver, Colorado 80202–1129. The EPA requests that you contact the individual listed in the FOR FURTHER INFORMATION CONTACT section to view the hard copy of the docket. An electronic copy of the State’s SIP compilation is also available at https:// www.epa.gov/region8/air/sip.html. FOR FURTHER INFORMATION CONTACT: Kathy Ayala, Air Program, U.S. Environmental Protection Agency (EPA), Region 8, Mailcode 8P–AR, 1595 Wynkoop Street, Denver, Colorado 80202–1129, (303) 312–6142, ayala.kathy@epa.gov. SUPPLEMENTARY INFORMATION: I. Background The SIP is a living document which a state revises as necessary to address its unique air pollution problems. Therefore, the EPA, from time to time, must take action on SIP revisions containing new and/or revised regulations as being part of the SIP. On May 22, 1997 (62 FR 27968), the EPA revised the procedures for incorporating by reference federally-approved SIPs, as a result of consultation between the EPA and the Office of the Federal Register (OFR). The description of the revised SIP document, IBR procedures and ‘‘Identification of Plan’’ format are discussed in further detail in the May 22, 1997, Federal Register document. On April 21, 2009 (74 FR 18141) the EPA published an update to the IBR material for North Dakota as of March 1, 2009. Today’s action is an update to the March 1, 2009 document. E:\FR\FM\08DER1.SGM 08DER1 76212 Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Rules and Regulations II. EPA Action In this action, the EPA is announcing the update to the IBR material as of August 1, 2015. The EPA is also correcting typographical errors, including omissions and other minor errors in subsection 52.1820, paragraphs (c), (d), and (e). III. Good Cause Exemption EPA has determined that today’s action falls under the ‘‘good cause’’ exemption in section 553(b)(3)(B) of the Administrative Procedure Act (APA) which, upon a finding of ‘‘good cause’’ authorizes agencies to dispense with public participation, and section 553(d)(3), which allows an agency to make a rule effective immediately (thereby avoiding the 30-day delayed effective date otherwise provided for in the APA). Today’s action simply updates the codification of provisions which are already in effect as a matter of law. Under section 553 of the APA, an agency may find good cause where procedures are ‘‘impractical, unnecessary, or contrary to the public interest.’’ Public comment is ‘‘unnecessary’’ and ‘‘contrary to the public interest’’ since the codification only reflects existing law. Likewise, there is no purpose served by delaying the effective date of this action. Lhorne on DSK9F6TC42PROD with RULES IV. Statutory and Executive Order Reviews A. General Requirements Under Executive Order 12866 (58 FR 51735, October 4, 1993), this action is not a ‘‘significant regulatory action’’ and is therefore not subject to review by the Office of Management and Budget. This rule is not subject to Executive Order 13211, ‘‘Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use’’ (66 FR 28355, May 22, 2001) because it is not a significant regulatory action under Executive Order 12866. Because the agency has made a ‘‘good cause’’ finding that this action is not subject to notice-and-comment requirements under the Administrative Procedure Act or any other statute as indicated in the SUPPLEMENTARY INFORMATION section, it is not subject to the regulatory flexibility provisions of the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), or to sections 202 and 205 of the Unfunded Mandates Reform Act of 1995 (UMRA) (Pub. L. 104–4). In addition, this action does not significantly or uniquely affect small governments or impose a significant intergovernmental mandate, as described in sections 203 and 204 of UMRA. This rule also does not have a VerDate Sep<11>2014 14:14 Dec 07, 2015 Jkt 238001 substantial direct effect on one or more Indian tribes, on the relationship between the federal government and Indian tribes, or on the distribution of power and responsibilities between the federal government and Indian tribes, as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), nor will it have substantial direct effects on the states, on the relationship between the national government and the states, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132 (64 FR 43255, August 10, 1999). This rule also is not subject to Executive Order 13045 (62 FR 19885, April 23, 1997), because it is not economically significant. This rule does not involve technical standards; thus the requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) do not apply. The rule also does not involve special consideration of environmental justice related issues as required by Executive Order 12898 (59 FR 7629, February 16, 1994). This rule does not impose an information collection burden under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). EPA’s compliance with these statutes and Executive Orders for the underlying rules are discussed in previous actions taken on the State’s rules. In this rule, EPA is finalizing regulatory text that includes incorporation by reference. In accordance with requirements of 1 CFR 51.5, EPA is finalizing the incorporation by reference of the North Dakota regulations described in the amendments to 40 CFR part 52 set forth below. EPA has made, and will continue to make, these documents generally available electronically through www.regulations.gov and/or in hard copy at the appropriate EPA office (see the ADDRESSES section of this preamble for more information). B. Submission to Congress and the Comptroller General The Congressional Review Act (5 U.S.C. 801 et seq.), as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. Section 808 allows the issuing agency to make a rule effective sooner than otherwise provided by the CRA if the agency makes a good cause finding that notice and public procedure is impracticable, PO 00000 Frm 00012 Fmt 4700 Sfmt 4700 unnecessary or contrary to the public interest. This action simply codifies provisions which are already in effect as a matter of law in federal and approved state programs. 5 U.S.C. 808(2). As stated previously, EPA has made such a good cause finding and established an effective date of December 8, 2015. EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. This change to the identification of plan for North Dakota is not a ‘‘major rule’’ as defined by 5 U.S.C. 804(2). C. Petitions for Judicial Review EPA has also determined that the provisions of section 307(b)(1) of the Clean Air Act pertaining to petitions for judicial review are not applicable to this action. Prior EPA rulemaking actions for each individual component of the North Dakota SIP compilation had previously afforded interested parties the opportunity to file a petition for judicial review in the United States Court of Appeals for the appropriate circuit within 60 days of such rulemaking action. Thus, EPA sees no need in this action to reopen the 60-day period for filing such petitions for judicial review for this ‘‘Identification of plan’’ reorganization action for North Dakota. List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Carbon monoxide, Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds. Dated: September 8, 2015. Shaun L. McGrath, Regional Administrator, Region 8. PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS 1. The authority citation for part 52 continues to read as follows: ■ Authority: 42 U.S.C. 7401 et seq. Subpart JJ—North Dakota 2. In § 52.1820 paragraphs (b), (c), (d) and (e) are revised to read as follows: ■ § 52.1820 Identification of plan. * * * * * (b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval E:\FR\FM\08DER1.SGM 08DER1 Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Rules and Regulations date prior to August 1, 2015, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval Rule No. dates after August 1, 2015, will be incorporated by reference in the next update to the SIP compilation. (2) EPA Region 8 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated state rules/regulations State effective date Rule title EPA effective date which have been approved as part of the SIP as of August 1, 2015. (3) Copies of the materials incorporated by reference may be inspected at the EPA Region 8 Office, Office of Partnerships and Regulatory Assistance (OPRA), Air Program, 1595 Wynkoop Street, Denver, Colorado 80202–1129. (c) EPA-approved regulations. Final rule citation/date 33–15–01. General Provisions 33–15–01–01 33–15–01–02 33–15–01–03 33–15–01–04 33–15–01–05 33–15–01–06 ......... ......... ......... ......... ......... ......... 33–15–01–07 33–15–01–08 33–15–01–09 33–15–01–10 ......... ......... ......... ......... 33–15–01–12 ......... 33–15–01–13 ......... 33–15–01–14 33–15–01–15 33–15–01–16 33–15–01–17 33–15–01–18 ......... ......... ......... ......... ......... Purpose .................................. Scope ..................................... Authority ................................. Definitions .............................. Abbreviations ......................... Entry onto Premises—Authority. Variances ............................... Circumvention ........................ Severability ............................ Land use plans and zoning regulations. Measurement of emissions of air contaminants. Shutdown and malfunction of an installation—Requirement for notification. Time schedule for compliance Prohibition of air pollution ...... Confidentiality of records ....... Enforcement ........................... Compliance Certifications ...... 10/1/87 10/1/87 9/1/97 4/1/11 4/1/09 10/1/87 6/12/89 6/12/89 5/3/04 6/2/14 12/5/11 6/12/89 54 54 69 79 76 54 FR FR FR FR FR FR 20574, 20574, 17302, 25021, 68317, 20574, 5/12/89 5/12/89 4/2/04 5/2/14 11/4/11 5/12/89 6/1/1990 6/1/90 10/1/87 10/1/87 8/25/1992 8/25/92 6/12/89 6/12/89 57 57 54 54 FR FR FR FR 28619, 28619, 20574, 20574, 6/26/92 6/26/92 5/12/89 5/12/89 6/1/01 3/31/03 68 FR 9565, 2/28/03 4/1/09 12/5/11 76 FR 68317, 11/4/11 10/1/87 6/1/01 10/1/87 3/1/03 3/1/03 6/12/89 3/31/03 6/12/89 11/22/04 11/22/04 54 68 54 69 69 FR FR FR FR FR 20574, 5/12/89 9565, 2/28/03 20574, 5/12/89 61762, 10/21/04 61762, 10/21/04 33–15–02. Ambient Air Quality Standards 33–15–02–01 33–15–02–02 33–15–02–03 33–15–02–04 33–15–02–05 ......... ......... ......... ......... ......... 33–15–02–06 ......... 33–15–02–07 ......... Table 1 ................... Table 2 ................... Scope ..................................... Purpose .................................. Air quality guidelines .............. Ambient air quality standards Method of sampling and analysis. Reference conditions ............. Concentration of air contaminants in the ambient air restricted. Ambient Air Quality Standards National Ambient Air Quality Standards. FR FR FR FR FR 10/1/87 10/1/87 10/1/87 4/1/11 12/1/94 6/12/89 6/12/89 6/12/89 6/2/14 12/9/96 54 54 54 79 61 20574, 20574, 20574, 25021, 52865, 5/12/89 5/12/89 5/12/89 5/2/14 10/8/96 10/1/87 4/1/11 6/12/89 6/2/14 54 FR 20574, 5/12/89 79 FR 25021, 5/2/14 4/1/11 4/1/11 6/2/14 6/2/14 77 FR 25021, 5/2/14 79 FR 25021, 5/2/14 33–15–03. Restriction of Emission of Visible Air Contaminants 33–15–03–01 ......... 33–15–03–02 ......... Lhorne on DSK9F6TC42PROD with RULES 33–15–03–03 ......... 33–15–03–03.1 ...... 33–15–03–04 ......... 33–15–03–05 ......... Restrictions applicable to existing installations. Restrictions applicable to new installations and all incinerators. Restrictions applicable to fugitive emissions. Restrictions applicable to flares. Exceptions ............................. Method of measurement ........ 10/1/87 6/12/89 54 FR 20574, 5/12/89 10/1/87 6/12/89 54 FR 20574, 5/12/89 10/1/87 6/12/89 54 FR 20574, 5/12/89 10/1/87 6/12/89 54 FR 20574, 5/12/89 1/1/13 10/1/87 10/22/14 6/12/89 79 FR 63045, 11/21/14 54 FR 20574, 5/12/89 33–15–04. Open Burning Restrictions 33–15–04–01 ......... VerDate Sep<11>2014 Refuse burning restrictions .... 17:24 Dec 07, 2015 Jkt 238001 PO 00000 1/1/07 Frm 00013 Fmt 4700 7/28/08 Sfmt 4700 76213 73 FR 30308, 5/27/08 E:\FR\FM\08DER1.SGM 08DER1 Comments 76214 Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Rules and Regulations State effective date Rule No. Rule title 33–15–04–02 ......... Permissible open burning ...... EPA effective date 1/1/07 7/28/08 Final rule citation/date Comments 73 FR 30308, 5/27/08 33–15–05. Emissions of Particulate Matter Restricted 33–15–05–01 ......... 33–15–05–02 ......... 33–15–05–03.2 ...... 33–15–05–03.3 ...... 33–15–05–04 ......... Restriction of emission of particulate matter from industrial processes. Maximum allowable emission of particulate matter from fuel burning equipment used for indirect heating. Refuse incinerators ................ Other waste incinerators ........ Methods of measurement ...... 1/1/13 10/22/14 79 FR 63045, 11/21/14 3/1/03 11/22/04 69 FR 61762, 10/21/04 4/1/09 3/1/03 3/1/03 12/5/11 11/22/04 11/22/04 76 FR 68317, 11/4/11 69 FR 61762, 10/21/04 69 FR 61762, 10/21/04 33–15–06. Emissions of Sulfur Compounds Restricted. 33–15–06–01 ......... 33–15–06–02 ......... 33–15–06–03 ......... 33–15–06–04 ......... 33–15–06–05 ......... Restriction of emissions of sulfur dioxide from use of fuel. Restriction of emissions of sulfur oxides from industrial processes. Methods of measurement ...... Continuous emission monitoring requirements. Reporting and recordkeeping requirements. 3/1/03 11/22/04 69 FR 61762, 10/21/04 6/1/92 12/20/93 58 FR 54041, 10/20/93 3/1/03 6/1/92 11/22/04 12/20/93 69 FR 61762, 10/21/04 58 FR 54041, 10/20/93 6/1/92 12/20/93 See 63 FR 45722 (8/27/98) for additional material. 58 FR 54041, 10/20/93 33–15–07. Control of Organic Compounds Emissions 33–15–07–01 ......... 33–15–07–02 ......... Requirements for construction of organic compounds facilities. Requirements for organic compounds gas disposal. 9/1/98 11/1/99 64 FR 47395, 8/31/99 6/1/92 10/20/95 60 FR 43396, 8/21/95 33–15–08. Control of Air Pollution from Vehicles and Other Internal Combustion Engines. 33–15–08–01 ......... 33–15–08–02 ......... Internal combustion engine emissions restricted. Removal and/or disabling of motor vehicle pollution control devices prohibited. 7/1/78 11/2/79 44 FR 63102, 11/2/79 7/1/78 11/2/79 44 FR 63102, 11/2/79 33–15–10. Control of Pesticides 33–15–10–01 ......... 33–15–10–02 ......... Pesticide use restricted ......... Restrictions on the disposal of surplus pesticides and empty pesticide containers. 1/1/89 6/1/90 9/10/90 8/25/92 55 FR 32403, 8/9/90 57 FR 28619, 6/26/92 33–15–11. Prevention of Air Pollution Emergency Episodes 33–15–11–01 ......... 33–15–11–02 ......... 33–15–11–03 ......... 33–15–11–04 ......... Lhorne on DSK9F6TC42PROD with RULES Table 6 ................... Table 7 ................... Air pollution emergency ......... Air pollution episode criteria .. Abatement strategies emission reduction plans. Preplanned abatement strategies plans. Air pollution episode criteria .. Abatement strategies emission reduction plans. 10/1/87 10/1/87 10/1/87 6/12/89 6/12/89 6/12/89 54 FR 20574, 5/12/89 54 FR 20574, 5/12/89 54 FR 20574, 5/12/89 1/1/89 9/10/90 55 FR 32403, 8/9/90 8/1/95 8/1/95 6/20/97 6/20/97 62 FR 19224, 4/21/97 62 FR 19224, 4/21/97 33–15–14. Designated Air Contaminant Sources Permit to Construct Minor Source Permit to Operate Title V Permit to Operate 33–15–14–01 ......... 33–15–14–01.1 ...... VerDate Sep<11>2014 Designated air contaminant sources. Definitions .............................. 17:24 Dec 07, 2015 Jkt 238001 PO 00000 4/1/11 6/2/14 79 FR 25021, 5/2/14 1/1/96 6/20/97 62 FR 19224, 4/21/97 Frm 00014 Fmt 4700 Sfmt 4700 E:\FR\FM\08DER1.SGM 08DER1 Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Rules and Regulations State effective date EPA effective date Rule No. Rule title 33–15–14–02 ......... Permit to construct ................. 4/1/11 6/2/14 79 FR 25021, 5/2/14 33–15–14–03 ......... Minor source permit to operate. Source exclusion from title V permit to operate requirements. 4/1/11 6/2/14 79 FR 25021, 5/2/14 6/1/01 3/31/03 68 FR 9565, 2/28/03 33–15–14–07 ......... Final rule citation/date 76215 Comments Excluding subsections 1, 12, 13, 3.c., 13.b.1., 5, 13.c., 13.i(5), 13.o., and 19 (one sentence) which were subsequently revised and approved. See 57 FR 28619 (6/26/92), regarding State’s commitment to meet requirements of EPA’s ‘‘Guideline on Air Quality Models (revised).’’ 33–15–15. Prevention of Significant Deterioration of Air Quality 33–15–15–01.1 ...... 33–15–15–01.2 ...... Purpose .................................. Scope ..................................... 2/1/05 1/1/13 8/20/07 8/29/13 72 FR 39564, 7/19/07 78 FR 45866, 7/30/13 33–15–15–02 ......... Reclassification ...................... 2/1/05 8/20/07 72 FR 39564, 7/19/07 33–15–17. Restriction of Fugitive Emissions 33–15–17–01 ......... 33–15–17–02 ......... 33–15–17–03 ......... 33–15–17–04 ......... General provisions—applicability and designation of affected facilities. Restriction of fugitive particulate emissions. Reasonable precautions for abating and preventing fugitive particulate emissions. Restriction of fugitive gaseous emissions. 6/1/01 3/31/03 68 FR 9565, 2/28/03 1/1/07 7/28/08 73 FR 30308, 5/27/08 7/1/78 11/2/79 44 FR 63102, 11/2/79 7/1/78 11/2/79 44 FR 63102, 11/2/79 33–15–18. Stack Heights 33–15–18–01 ......... 33–15–18–02 ......... 33–15–18–03 ......... General provisions ................. Good engineering practice demonstrations. Exemptions ............................ 10/1/87 10/1/87 1/13/89 1/13/89 53 FR 45763, 11/14/88 53 FR 45763, 11/14/88 10/1/87 1/13/89 53 FR 45763, 11/14/88 33–15–19. Visibility Protection 33–15–19–01 ......... 33–15–19–02 ......... 33–15–19–03 ......... General provisions ................. Review of new major stationary sources and major modifications. Visibility monitoring ................ 10/1/87 10/1/87 11/28/88 11/28/88 53 FR 37757, 9/28/88 53 FR 37757, 9/28/88 10/1/87 11/28/88 53 FR 37757, 9/28/88 33–15–20. Control of Emissions from Oil and Gas Well Production Facilities 33–15–20–01 ......... 33–15–20–02 ......... 33–15–20–03 ......... Lhorne on DSK9F6TC42PROD with RULES 33–15–20–04 ......... General provisions ................. Registration and reporting requirements. Prevention of significant deterioration applicability and source information requirements. Requirements for control of production facility emissions. 6/1/92 6/1/92 10/20/95 10/20/95 60 FR 43396, 8/21/95 60 FR 43396, 8/21/95 6/1/92 10/20/95 60 FR 43396, 8/21/95 6/1/90 8/25/92 57 FR 28619, 6/26/92 33–15–23. Fees 33–15–23–01 ......... 33–15–23–02 ......... 33–15–23–03 ......... VerDate Sep<11>2014 Definitions .............................. Permit to construct fees ......... Minor source permit to operate fees. 17:24 Dec 07, 2015 Jkt 238001 PO 00000 8/1/95 8/1/95 4/1/09 Frm 00015 Fmt 4700 6/20/97 6/20/97 12/5/11 Sfmt 4700 62 FR 19224, 4/21/97 62 FR 19224, 4/21/97 76 FR 68317, 11/4/11 E:\FR\FM\08DER1.SGM 08DER1 See 40 CFR 52.1829(c) and (d). 76216 Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Rules and Regulations Rule No. State effective date Rule title EPA effective date Final rule citation/date Comments 33–15–25. Regional Haze Requirements 33–15–25–01 ......... 33–15–25–02 ......... 33–15–25–03 ......... 33–15–25–04 ......... Definitions .............................. Best available retrofit technology. Guidelines for best available retrofit technology determinations under the regional haze rule. Monitoring, recordkeeping, and reporting. 1/1/07 1/1/07 5/7/12 5/7/12 77 FR 20894, 4/6/12 77 FR 20894, 4/6/12 1/1/07 5/7/12 77 FR 20894, 4/6/12 1/1/07 5/7/12 77 FR 20894, 4/6/12 (d) EPA-approved source specific requirements. Rule No. State effective date Rule title EPA effective date Final rule citation/date Comments American Crystal Sugar at Drayton. Chapter 8, Section 8.3., Permit 730015. Continuous Emission Monitoring Requirements for Existing Stationary Sources, including Amendments to Permits to Operate and Department Order. 5/6/77 10/17/77 42 FR 55471, 10/17/77 Coal Creek Station Units 1 and 2. PTC10005 .............. Air pollution Control permit to construct for best available retrofit technology (BART). 2/23/10 5/7/12 77 FR 20894, 4/6/12 Excluding disapproved NOX BART emissions limits for Units 1 and 2 and corresponding monitoring, recordkeeping, and reporting requirements. Heskett Station Units 1 and 2. Chapter 8, Section 8.3., Permit F76001. PTC 10028 ............. Continuous Emission Monitoring Requirements for Existing Stationary Sources, including amendments to Permits to Operate and Department Order. Air Pollution Control Permit to Construct for Best Available Retrofit Technology (BART) Heskett Unit 2. 5/6/77 10/17/77 7/22/10 5/7/12 42 FR 55471, 10/17/77 77 FR 20894, 4/6/12 Leland Olds Units 1 and 2. Chapter 8, Section 9.3., Permit 730004. Lhorne on DSK9F6TC42PROD with RULES PTC10004 .............. Continuous Emission Monitoring Requirements for Existing Stationary Sources, including amendments to Permits to Operate and Department Order. Air pollution control permit to construct for best available retrofit technology (BART). 5/6/77 10/17/77 2/23/10 5/7/12 42 FR 55471, 10/17/77 77 FR 20894, 4/6/12 Milton R. Young Station Units 1 and 2. Chapter 8, Section 8.3.2. VerDate Sep<11>2014 Continuous Opacity Monitoring for M.R. Young Station Unit 1 Main Boiler. 17:24 Dec 07, 2015 Jkt 238001 PO 00000 3/1/13 Frm 00016 Fmt 4700 8/31/15 Sfmt 4700 80 FR 37157, 6/30/15 E:\FR\FM\08DER1.SGM 08DER1 Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Rules and Regulations State effective date Rule No. Rule title PTC10007 .............. Air pollution control permit to construct for best available retrofit technology (BART). EPA effective date 2/23/10 5/7/12 Final rule citation/date Comments 77 FR 20894, 4/6/12 Stanton Station Unit 1. Chapter 8, Section 8.3.1., Permit F76007. PTC 10006 ............. Compliance Schedule for Installation of Continuous Opacity Monitoring Instruments. Air Pollution Control Permit to Construct for Best Available Retrofit Technology (BART). 3/15/77 5/7/12 77 FR 20894, 4/6/12 2/23/10 5/7/12 77 FR 20894, 4/6/12 Tesoro Mandan Refinery. 77–311 APC .......... Chapter 8, Section 8.3.1. Compliance Schedule for Continuous Opacity Monitoring Instruments. Continuous Opacity Monitoring for Fluid Bed Catalytic Cracking Units: Tesoro Refining and Marketing Co., Mandan Refinery. 5/9/77 7/28/08 73 FR 30308, 5/27/08 2/27/07 7/28/08 73 FR 30308, 5/27/08 (e) EPA-approved nonregulatory provisions. Rule No. State effective date Rule title EPA effective date Final rule citation/date Chapter 1. Introduction. Sections 1.1. thru 1.7. Section 1.8 ............. Section 1.9 ............. Section 1.10 ........... Lhorne on DSK9F6TC42PROD with RULES Section 1.13 ........... Section 1.14 ........... VerDate Sep<11>2014 Section 1.1., Purpose; 1.2., Scope; 1.3., Classification of Regions; 1.4., Public Hearings; 1.5., Reports; 1.6., Provisions for Making Emissions Data Available to the Public; 1.7., Revisions, Individually Negotiated Compliance Schedules— Public Hearing (5/15/1973). Revisions: Public Hearing (11/ 20/1973). Revisions: Public Hearing (5/ 22/1974). Public Hearing: (11/17/1975) Adoption of regulations Pursuant to Request for Delegation of Authority to Implement and Enforce Federal NSPS, NESHAPS, and PSD Programs. Revisions, Public Hearing— Adoption of New and Revised Air Pollution Control Regulations and Revisions to the Implementation Plan. Revisions to the Implementation Plan. 14:14 Dec 07, 2015 Jkt 238001 PO 00000 1/24/72 6/30/72 37 FR 10842, 5/31/72 11/20/73 11/16/77 42 FR 55471, 10/17/77 5/22/74 11/16/77 42 FR 55471, 10/17/77 11/17/75 11/16/77 42 FR 55471, 10/17/77 11/2/79 8/12/80 45 FR 53475, 8/12/80 4/1/09 10/17/12 77 FR 57029, 9/17/12 Sfmt 4700 E:\FR\FM\08DER1.SGM Frm 00017 Fmt 4700 08DER1 Comments 76217 76218 Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Rules and Regulations Rule No. State effective date Rule title EPA effective date Final rule citation/date Chapter 2. Legal Authority. Sections 2.1. thru 2.10. Section 2.11 ........... Section 2.15 ........... 2.1., Introduction; 2.2., 420.11(a); 2.3., 420.11(b); 2.4., 420.11(c); 2.5., 420.11(d); 2.6., 420.11(e); 2.7., 420.11(f); 2.8., Future Legal Authority Needs; 2.9., Legal Authority to Control Indirect Sources of Air Pollution; 2.10., Legal Authority to Implement and Enforce Federal NSPS, NESHAPS, and PSD Programs. Legal Authority for Collection of Permit or Registration Processing Fees and Inspection Program Fees and Registration of Certain Air Contaminant Sources. Respecting Boards ................ 1/24/72 5/31/72 37 FR 10842, 5/31/72 7/1/79 8/12/80 45 FR 53475, 8/12/80 3/1/13 8/28/13 78 FR 45867, 7/29/13 Chapter 3. Control Strategy. Section 3.1 ............. Section 3.2 ............. Section 3.2.1 .......... Section 3.3 ............. Section 3.4 ............. Section 3.5 ............. Section 3.6 ............. Section 3.7 ............. Introduction ............................ Control Strategy: Particulate Matter. Control Strategy: Particulate Matter (PM10). Control Strategy: Sulphur Oxides. Control Strategy: Carbon Monoxide, Hydrocarbons, Photochemical Oxidants, and Nitrogen Dioxide. Future Control Strategy Needs. Identification and Designation of Air Quality Maintenance Areas. Visibility—Long-Term Strategy 1/24/72 1/24/72 5/31/72 5/31/72 37 FR 10842, 5/31/72 37 FR 10842, 5/31/72 1/1/89 9/10/90 55 FR 32403, 8/0/90 1/24/72 5/31/72 37 FR 10842, 5/31/72 1/24/72 5/31/72 37 FR 10842, 5/31/72 1/24/72 5/31/72 37 FR 10842, 5/31/72 1/24/72 5/31/72 37 FR 10842, 5/31/72 .................... 12/4/89 54 FR 41094, 10/5/89 Chapter 4. Compliance Schedules. Chapter 4 ............... Compliance Schedules .......... 2/19/74 5/31/72 37 FR 10842, 5/31/72 Chapter 5. Prevention of Air Pollution Emergency Episodes. Chapter 5 ............... Section 5.2.1 .......... Prevention of Air Pollution Emergency Episodes. Replacement of TSP levels with PM10 levels. 1/24/72 5/31/72 37 FR 10842, 5/31/72 1/1/89 9/10/90 55 FR 32403, 8/9/90 Chapter 6. Air Quality Surveillance. Lhorne on DSK9F6TC42PROD with RULES Section 6.1 thru 6.7 Section Section Section Section Section 6.8 ............. 6.9 ............. 6.10 ........... 6.11 ........... 6.11.3 ........ VerDate Sep<11>2014 6.1., Introduction; 6.2., Ambient Air Quality Monitoring Network Design; 6.3., Ambient Air Quality Monitoring Network Description; 6.4., Station Designations; 6.5., Air Quality Monitoring Criteria; 6.6., Episode Monitoring; 6.7., Data Reporting. Annual Network Review ......... Public Notification .................. Visibility Monitoring ................ Particulate Matter (PM10) ....... Ozone .................................... 14:14 Dec 07, 2015 Jkt 238001 PO 00000 1/1/80 8/12/80 4/1/09 1/1/80 10/1/87 1/1/89 4/1/09 10/17/12 8/12/80 11/28/88 9/10/90 10/17/12 77 45 53 55 77 Sfmt 4700 E:\FR\FM\08DER1.SGM Frm 00018 Fmt 4700 45 FR 53475, 8/12/80 FR FR FR FR FR 57029, 53475, 37757, 32403, 57029, 9/17/12 8/12/89 9/28/88 8/9/90 9/17/12 08DER1 Comments Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Rules and Regulations State effective date Rule No. Rule title Section 6.13 ........... Visibility Monitoring: Theodore Roosevelt National Park. EPA effective date 1/9/96 Final rule citation/date 6/20/97 76219 Comments 62 FR 19224, 4/21/97 Chapter 7. Review of New Sources and Modifications. Sections 7.1 thru 7.6. Review of New Sources and Modifications. 1/24/72 5/31/72 37 FR 10842, 5/31/72 Chapter 7.7. Air Quality Modeling. Section 7.7 ............. Air Quality Modeling .............. 4/1/09 10/17/09 77 FR 57029, 9/17/09 Chapter 7.8. Interstate Transport. Section 7.8 ............. Section 7.8.1 .......... Interstate Transport of Air Pollution. Interstate Transport Relating to the 1997 8-hour Ozone and PM2.5 National Ambient Air Quality Standards. 4/1/09 7/6/10 4/1/09 75 FR 31290, 6/3/10 12/22/10 75 FR 71023, 11/22/10 Chapter 8. Source Surveillance. Chapter 8 ............... Source Surveillance ............... 1/24/72 5/31/72 37 FR 10842, 5/31/72 Chapter 9. Resources. Chapter 9 ............... Resources .............................. 4/1/09 10/17/12 77 FR 57029, 9/17/12 Chapter 10. Intergovernmental Cooperation. Chapter 10. ............ Intergovernmental Cooperation. 1/24/72 5/31/72 37 FR 10842, 5/31/72 Chapter 12. The Small Business Assistance Program. Chapter 12 ............. The Small Business Assistance Program. [FR Doc. 2015–30823 Filed 12–7–15; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA–R09–OAR–2015–0690; FRL–9937–29– Region 9] Approval of California Air Plan Revisions, South Coast Air Quality Management District and Yolo-Solano Air Quality Management District Environmental Protection Agency (EPA). ACTION: Direct final rule. AGENCY: The Environmental Protection Agency (EPA) is taking direct final action to approve revisions to the South Coast Air Quality Management District (SCAQMD) and Yolo-Solano Air Quality Management District (YSAQMD) portions of the California State Implementation Plan (SIP). These Lhorne on DSK9F6TC42PROD with RULES SUMMARY: VerDate Sep<11>2014 14:14 Dec 07, 2015 Jkt 238001 10/23/92 2/10/94 59 FR 1485, 1/11/94 revisions concern emissions of volatile organic compounds (VOCs) from motor vehicle and mobile equipment refinishing coating operations. We are approving local rules that regulate these emission sources under the Clean Air Act (CAA or the Act). DATES: This rule is effective on February 8, 2016 without further notice, unless the EPA receives adverse comments by January 7, 2016. If we receive such comments, we will publish a timely withdrawal in the Federal Register to notify the public that this direct final rule will not take effect. ADDRESSES: Submit comments, identified by docket number [EPA–R09– OAR–2015–0690, by one of the following methods: 1. Federal eRulemaking Portal: www.regulations.gov. Follow the online instructions. 2. Email: steckel.andrew@epa.gov. 3. Mail or deliver: Andrew Steckel (Air–4), U.S. Environmental Protection Agency Region IX, 75 Hawthorne Street, San Francisco, CA 94105–3901. PO 00000 Frm 00019 Fmt 4700 Sfmt 4700 Instructions: Once submitted, comments cannot be edited or withdrawn. The EPA may publish any comment received to its public docket. Do not submit electronically any information you consider to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. If you need to include CBI as part of your comment, please visit https://www.epa.gov/ dockets/comments.html for further instructions. Multimedia submissions (audio, video, etc.) must be accompanied by a written comment. The written comment is considered the official comment and should include discussion of all points you wish to make. For the full EPA public comment policy and general guidance on making effective comments, please visit https:// www2.epa.gov/dockets/commentingepa-dockets. Docket: Generally, documents in the docket for this action are available electronically at www.regulations.gov or in hard copy at EPA Region IX, 75 E:\FR\FM\08DER1.SGM 08DER1

Agencies

[Federal Register Volume 80, Number 235 (Tuesday, December 8, 2015)]
[Rules and Regulations]
[Pages 76211-76219]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-30823]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R08-OAR-2013-0047; FRL-9932-60-Region 8]


Air Plan Approval; ND; Update to Materials Incorporated by 
Reference

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule; administrative change.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) is updating the 
materials that are incorporated by reference (IBR) into the North 
Dakota State Implementation Plan (SIP). The regulations affected by 
this update have been previously submitted by the North Dakota 
Department of Health and approved by the EPA. In this action, the EPA 
is also notifying the public of corrections to typographical errors and 
minor formatting changes to the IBR tables. This update affects the SIP 
materials that are available for public inspection at the EPA Regional 
Office.

DATES: This action is effective December 8, 2015.

ADDRESSES: The EPA has established a docket for this action under 
Docket Identification Number EPA-R08-OAR-2013-0047. All documents in 
the docket are listed on the https://www.regulations.gov Web site. 
Although listed in the index, some information may not be publicly 
available, i.e., Confidential Business Information or other information 
the disclosure of which is restricted by statute. Certain other 
material, such as copyrighted material, is not placed on the Internet 
and will be publicly available only in the hard copy form. Publicly 
available docket materials are available either electronically through 
https://www.regulations.gov or in hard copy at EPA Region 8, Office of 
Partnership and Regulatory Assistance, Air Program, 1595 Wynkoop 
Street, Denver, Colorado 80202-1129. The EPA requests that you contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section to 
view the hard copy of the docket. An electronic copy of the State's SIP 
compilation is also available at https://www.epa.gov/region8/air/sip.html.

FOR FURTHER INFORMATION CONTACT: Kathy Ayala, Air Program, U.S. 
Environmental Protection Agency (EPA), Region 8, Mailcode 8P-AR, 1595 
Wynkoop Street, Denver, Colorado 80202-1129, (303) 312-6142, 
ayala.kathy@epa.gov.

SUPPLEMENTARY INFORMATION:

I. Background

    The SIP is a living document which a state revises as necessary to 
address its unique air pollution problems. Therefore, the EPA, from 
time to time, must take action on SIP revisions containing new and/or 
revised regulations as being part of the SIP. On May 22, 1997 (62 FR 
27968), the EPA revised the procedures for incorporating by reference 
federally-approved SIPs, as a result of consultation between the EPA 
and the Office of the Federal Register (OFR). The description of the 
revised SIP document, IBR procedures and ``Identification of Plan'' 
format are discussed in further detail in the May 22, 1997, Federal 
Register document. On April 21, 2009 (74 FR 18141) the EPA published an 
update to the IBR material for North Dakota as of March 1, 2009. 
Today's action is an update to the March 1, 2009 document.

[[Page 76212]]

II. EPA Action

    In this action, the EPA is announcing the update to the IBR 
material as of August 1, 2015. The EPA is also correcting typographical 
errors, including omissions and other minor errors in subsection 
52.1820, paragraphs (c), (d), and (e).

III. Good Cause Exemption

    EPA has determined that today's action falls under the ``good 
cause'' exemption in section 553(b)(3)(B) of the Administrative 
Procedure Act (APA) which, upon a finding of ``good cause'' authorizes 
agencies to dispense with public participation, and section 553(d)(3), 
which allows an agency to make a rule effective immediately (thereby 
avoiding the 30-day delayed effective date otherwise provided for in 
the APA). Today's action simply updates the codification of provisions 
which are already in effect as a matter of law.
    Under section 553 of the APA, an agency may find good cause where 
procedures are ``impractical, unnecessary, or contrary to the public 
interest.'' Public comment is ``unnecessary'' and ``contrary to the 
public interest'' since the codification only reflects existing law. 
Likewise, there is no purpose served by delaying the effective date of 
this action.

IV. Statutory and Executive Order Reviews

A. General Requirements

    Under Executive Order 12866 (58 FR 51735, October 4, 1993), this 
action is not a ``significant regulatory action'' and is therefore not 
subject to review by the Office of Management and Budget. This rule is 
not subject to Executive Order 13211, ``Actions Concerning Regulations 
That Significantly Affect Energy Supply, Distribution, or Use'' (66 FR 
28355, May 22, 2001) because it is not a significant regulatory action 
under Executive Order 12866. Because the agency has made a ``good 
cause'' finding that this action is not subject to notice-and-comment 
requirements under the Administrative Procedure Act or any other 
statute as indicated in the Supplementary Information section, it is 
not subject to the regulatory flexibility provisions of the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.), or to sections 202 and 205 of 
the Unfunded Mandates Reform Act of 1995 (UMRA) (Pub. L. 104-4). In 
addition, this action does not significantly or uniquely affect small 
governments or impose a significant intergovernmental mandate, as 
described in sections 203 and 204 of UMRA. This rule also does not have 
a substantial direct effect on one or more Indian tribes, on the 
relationship between the federal government and Indian tribes, or on 
the distribution of power and responsibilities between the federal 
government and Indian tribes, as specified by Executive Order 13175 (65 
FR 67249, November 9, 2000), nor will it have substantial direct 
effects on the states, on the relationship between the national 
government and the states, or on the distribution of power and 
responsibilities among the various levels of government, as specified 
in Executive Order 13132 (64 FR 43255, August 10, 1999). This rule also 
is not subject to Executive Order 13045 (62 FR 19885, April 23, 1997), 
because it is not economically significant. This rule does not involve 
technical standards; thus the requirements of section 12(d) of the 
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 
note) do not apply. The rule also does not involve special 
consideration of environmental justice related issues as required by 
Executive Order 12898 (59 FR 7629, February 16, 1994). This rule does 
not impose an information collection burden under the Paperwork 
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). EPA's compliance with 
these statutes and Executive Orders for the underlying rules are 
discussed in previous actions taken on the State's rules.
    In this rule, EPA is finalizing regulatory text that includes 
incorporation by reference. In accordance with requirements of 1 CFR 
51.5, EPA is finalizing the incorporation by reference of the North 
Dakota regulations described in the amendments to 40 CFR part 52 set 
forth below. EPA has made, and will continue to make, these documents 
generally available electronically through www.regulations.gov and/or 
in hard copy at the appropriate EPA office (see the ADDRESSES section 
of this preamble for more information).

B. Submission to Congress and the Comptroller General

    The Congressional Review Act (5 U.S.C. 801 et seq.), as added by 
the Small Business Regulatory Enforcement Fairness Act of 1996, 
generally provides that before a rule may take effect, the agency 
promulgating the rule must submit a rule report, which includes a copy 
of the rule, to each House of the Congress and to the Comptroller 
General of the United States. Section 808 allows the issuing agency to 
make a rule effective sooner than otherwise provided by the CRA if the 
agency makes a good cause finding that notice and public procedure is 
impracticable, unnecessary or contrary to the public interest. This 
action simply codifies provisions which are already in effect as a 
matter of law in federal and approved state programs. 5 U.S.C. 808(2). 
As stated previously, EPA has made such a good cause finding and 
established an effective date of December 8, 2015. EPA will submit a 
report containing this rule and other required information to the U.S. 
Senate, the U.S. House of Representatives, and the Comptroller General 
of the United States prior to publication of the rule in the Federal 
Register. This change to the identification of plan for North Dakota is 
not a ``major rule'' as defined by 5 U.S.C. 804(2).

C. Petitions for Judicial Review

    EPA has also determined that the provisions of section 307(b)(1) of 
the Clean Air Act pertaining to petitions for judicial review are not 
applicable to this action. Prior EPA rulemaking actions for each 
individual component of the North Dakota SIP compilation had previously 
afforded interested parties the opportunity to file a petition for 
judicial review in the United States Court of Appeals for the 
appropriate circuit within 60 days of such rulemaking action. Thus, EPA 
sees no need in this action to reopen the 60-day period for filing such 
petitions for judicial review for this ``Identification of plan'' 
reorganization action for North Dakota.

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Carbon monoxide, 
Incorporation by reference, Intergovernmental relations, Lead, Nitrogen 
dioxide, Ozone, Particulate matter, Reporting and recordkeeping 
requirements, Sulfur oxides, Volatile organic compounds.

    Dated: September 8, 2015.
Shaun L. McGrath,
Regional Administrator, Region 8.

PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

0
1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401 et seq.

Subpart JJ--North Dakota

0
2. In Sec.  52.1820 paragraphs (b), (c), (d) and (e) are revised to 
read as follows:


Sec.  52.1820  Identification of plan.

* * * * *
    (b) Incorporation by reference. (1) Material listed in paragraphs 
(c) and (d) of this section with an EPA approval

[[Page 76213]]

date prior to August 1, 2015, was approved for incorporation by 
reference by the Director of the Federal Register in accordance with 5 
U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists 
on the date of the approval, and notice of any change in the material 
will be published in the Federal Register. Entries in paragraphs (c) 
and (d) of this section with EPA approval dates after August 1, 2015, 
will be incorporated by reference in the next update to the SIP 
compilation.
    (2) EPA Region 8 certifies that the rules/regulations provided by 
EPA in the SIP compilation at the addresses in paragraph (b)(3) of this 
section are an exact duplicate of the officially promulgated state 
rules/regulations which have been approved as part of the SIP as of 
August 1, 2015.
    (3) Copies of the materials incorporated by reference may be 
inspected at the EPA Region 8 Office, Office of Partnerships and 
Regulatory Assistance (OPRA), Air Program, 1595 Wynkoop Street, Denver, 
Colorado 80202-1129.
    (c) EPA-approved regulations.

 
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                               State         EPA
             Rule No.                     Rule title         effective    effective            Final rule citation/date                  Comments
                                                                date         date
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                              33-15-01. General Provisions
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-01-01......................  Purpose................      10/1/87      6/12/89  54 FR 20574, 5/12/89
33-15-01-02......................  Scope..................      10/1/87      6/12/89  54 FR 20574, 5/12/89
33-15-01-03......................  Authority..............       9/1/97       5/3/04  69 FR 17302, 4/2/04
33-15-01-04......................  Definitions............       4/1/11       6/2/14  79 FR 25021, 5/2/14
33-15-01-05......................  Abbreviations..........       4/1/09      12/5/11  76 FR 68317, 11/4/11
33-15-01-06......................  Entry onto Premises--        10/1/87      6/12/89  54 FR 20574, 5/12/89
                                    Authority.
33-15-01-07......................  Variances..............     6/1/1990    8/25/1992  57 FR 28619, 6/26/92
33-15-01-08......................  Circumvention..........       6/1/90      8/25/92  57 FR 28619, 6/26/92
33-15-01-09......................  Severability...........      10/1/87      6/12/89  54 FR 20574, 5/12/89
33-15-01-10......................  Land use plans and           10/1/87      6/12/89  54 FR 20574, 5/12/89
                                    zoning regulations.
33-15-01-12......................  Measurement of                6/1/01      3/31/03  68 FR 9565, 2/28/03
                                    emissions of air
                                    contaminants.
33-15-01-13......................  Shutdown and                  4/1/09      12/5/11  76 FR 68317, 11/4/11
                                    malfunction of an
                                    installation--Requirem
                                    ent for notification.
33-15-01-14......................  Time schedule for            10/1/87      6/12/89  54 FR 20574, 5/12/89
                                    compliance.
33-15-01-15......................  Prohibition of air            6/1/01      3/31/03  68 FR 9565, 2/28/03
                                    pollution.
33-15-01-16......................  Confidentiality of           10/1/87      6/12/89  54 FR 20574, 5/12/89
                                    records.
33-15-01-17......................  Enforcement............       3/1/03     11/22/04  69 FR 61762, 10/21/04
33-15-01-18......................  Compliance                    3/1/03     11/22/04  69 FR 61762, 10/21/04
                                    Certifications.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                         33-15-02. Ambient Air Quality Standards
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-02-01......................  Scope..................      10/1/87      6/12/89  54 FR 20574, 5/12/89
33-15-02-02......................  Purpose................      10/1/87      6/12/89  54 FR 20574, 5/12/89
33-15-02-03......................  Air quality guidelines.      10/1/87      6/12/89  54 FR 20574, 5/12/89
33-15-02-04......................  Ambient air quality           4/1/11       6/2/14  79 FR 25021, 5/2/14
                                    standards.
33-15-02-05......................  Method of sampling and       12/1/94      12/9/96  61 FR 52865, 10/8/96
                                    analysis.
33-15-02-06......................  Reference conditions...      10/1/87      6/12/89  54 FR 20574, 5/12/89
33-15-02-07......................  Concentration of air          4/1/11       6/2/14  79 FR 25021, 5/2/14
                                    contaminants in the
                                    ambient air restricted.
Table 1..........................  Ambient Air Quality           4/1/11       6/2/14  77 FR 25021, 5/2/14
                                    Standards.
Table 2..........................  National Ambient Air          4/1/11       6/2/14  79 FR 25021, 5/2/14
                                    Quality Standards.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                              33-15-03. Restriction of Emission of Visible Air Contaminants
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-03-01......................  Restrictions applicable      10/1/87      6/12/89  54 FR 20574, 5/12/89
                                    to existing
                                    installations.
33-15-03-02......................  Restrictions applicable      10/1/87      6/12/89  54 FR 20574, 5/12/89
                                    to new installations
                                    and all incinerators.
33-15-03-03......................  Restrictions applicable      10/1/87      6/12/89  54 FR 20574, 5/12/89
                                    to fugitive emissions.
33-15-03-03.1....................  Restrictions applicable      10/1/87      6/12/89  54 FR 20574, 5/12/89
                                    to flares.
33-15-03-04......................  Exceptions.............       1/1/13     10/22/14  79 FR 63045, 11/21/14
33-15-03-05......................  Method of measurement..      10/1/87      6/12/89  54 FR 20574, 5/12/89
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                           33-15-04. Open Burning Restrictions
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-04-01......................  Refuse burning                1/1/07      7/28/08  73 FR 30308, 5/27/08
                                    restrictions.

[[Page 76214]]

 
33-15-04-02......................  Permissible open              1/1/07      7/28/08  73 FR 30308, 5/27/08
                                    burning.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                  33-15-05. Emissions of Particulate Matter Restricted
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-05-01......................  Restriction of emission       1/1/13     10/22/14  79 FR 63045, 11/21/14
                                    of particulate matter
                                    from industrial
                                    processes.
33-15-05-02......................  Maximum allowable             3/1/03     11/22/04  69 FR 61762, 10/21/04
                                    emission of
                                    particulate matter
                                    from fuel burning
                                    equipment used for
                                    indirect heating.
33-15-05-03.2....................  Refuse incinerators....       4/1/09      12/5/11  76 FR 68317, 11/4/11
33-15-05-03.3....................  Other waste                   3/1/03     11/22/04  69 FR 61762, 10/21/04
                                    incinerators.
33-15-05-04......................  Methods of measurement.       3/1/03     11/22/04  69 FR 61762, 10/21/04
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                   33-15-06. Emissions of Sulfur Compounds Restricted.
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-06-01......................  Restriction of                3/1/03     11/22/04  69 FR 61762, 10/21/04                      See 63 FR 45722 (8/27/
                                    emissions of sulfur                                                                           98) for additional
                                    dioxide from use of                                                                           material.
                                    fuel.
33-15-06-02......................  Restriction of                6/1/92     12/20/93  58 FR 54041, 10/20/93
                                    emissions of sulfur
                                    oxides from industrial
                                    processes.
33-15-06-03......................  Methods of measurement.       3/1/03     11/22/04  69 FR 61762, 10/21/04
33-15-06-04......................  Continuous emission           6/1/92     12/20/93  58 FR 54041, 10/20/93
                                    monitoring
                                    requirements.
33-15-06-05......................  Reporting and                 6/1/92     12/20/93  58 FR 54041, 10/20/93
                                    recordkeeping
                                    requirements.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                    33-15-07. Control of Organic Compounds Emissions
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-07-01......................  Requirements for              9/1/98      11/1/99  64 FR 47395, 8/31/99
                                    construction of
                                    organic compounds
                                    facilities.
33-15-07-02......................  Requirements for              6/1/92     10/20/95  60 FR 43396, 8/21/95
                                    organic compounds gas
                                    disposal.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                 33-15-08. Control of Air Pollution from Vehicles and Other Internal Combustion Engines.
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-08-01......................  Internal combustion           7/1/78      11/2/79  44 FR 63102, 11/2/79
                                    engine emissions
                                    restricted.
33-15-08-02......................  Removal and/or                7/1/78      11/2/79  44 FR 63102, 11/2/79
                                    disabling of motor
                                    vehicle pollution
                                    control devices
                                    prohibited.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                             33-15-10. Control of Pesticides
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-10-01......................  Pesticide use                 1/1/89      9/10/90  55 FR 32403, 8/9/90
                                    restricted.
33-15-10-02......................  Restrictions on the           6/1/90      8/25/92  57 FR 28619, 6/26/92
                                    disposal of surplus
                                    pesticides and empty
                                    pesticide containers.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                33-15-11. Prevention of Air Pollution Emergency Episodes
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-11-01......................  Air pollution emergency      10/1/87      6/12/89  54 FR 20574, 5/12/89
33-15-11-02......................  Air pollution episode        10/1/87      6/12/89  54 FR 20574, 5/12/89
                                    criteria.
33-15-11-03......................  Abatement strategies         10/1/87      6/12/89  54 FR 20574, 5/12/89
                                    emission reduction
                                    plans.
33-15-11-04......................  Preplanned abatement          1/1/89      9/10/90  55 FR 32403, 8/9/90
                                    strategies plans.
Table 6..........................  Air pollution episode         8/1/95      6/20/97  62 FR 19224, 4/21/97
                                    criteria.
Table 7..........................  Abatement strategies          8/1/95      6/20/97  62 FR 19224, 4/21/97
                                    emission reduction
                                    plans.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                33-15-14. Designated Air Contaminant Sources Permit to Construct Minor Source Permit to Operate Title V Permit to Operate
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-14-01......................  Designated air                4/1/11       6/2/14  79 FR 25021, 5/2/14
                                    contaminant sources.
33-15-14-01.1....................  Definitions............       1/1/96      6/20/97  62 FR 19224, 4/21/97

[[Page 76215]]

 
33-15-14-02......................  Permit to construct....       4/1/11       6/2/14  79 FR 25021, 5/2/14                        Excluding subsections
                                                                                                                                  1, 12, 13, 3.c.,
                                                                                                                                  13.b.1., 5, 13.c.,
                                                                                                                                  13.i(5), 13.o., and 19
                                                                                                                                  (one sentence) which
                                                                                                                                  were subsequently
                                                                                                                                  revised and approved.
                                                                                                                                  See 57 FR 28619 (6/26/
                                                                                                                                  92), regarding State's
                                                                                                                                  commitment to meet
                                                                                                                                  requirements of EPA's
                                                                                                                                  ``Guideline on Air
                                                                                                                                  Quality Models
                                                                                                                                  (revised).''
33-15-14-03......................  Minor source permit to        4/1/11       6/2/14  79 FR 25021, 5/2/14
                                    operate.
33-15-14-07......................  Source exclusion from         6/1/01      3/31/03  68 FR 9565, 2/28/03
                                    title V permit to
                                    operate requirements.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                            33-15-15. Prevention of Significant Deterioration of Air Quality
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-15-01.1....................  Purpose................       2/1/05      8/20/07  72 FR 39564, 7/19/07
33-15-15-01.2....................  Scope..................       1/1/13      8/29/13  78 FR 45866, 7/30/13                       See 40 CFR 52.1829(c)
                                                                                                                                  and (d).
33-15-15-02......................  Reclassification.......       2/1/05      8/20/07  72 FR 39564, 7/19/07
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                       33-15-17. Restriction of Fugitive Emissions
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-17-01......................  General provisions--          6/1/01      3/31/03  68 FR 9565, 2/28/03
                                    applicability and
                                    designation of
                                    affected facilities.
33-15-17-02......................  Restriction of fugitive       1/1/07      7/28/08  73 FR 30308, 5/27/08
                                    particulate emissions.
33-15-17-03......................  Reasonable precautions        7/1/78      11/2/79  44 FR 63102, 11/2/79
                                    for abating and
                                    preventing fugitive
                                    particulate emissions.
33-15-17-04......................  Restriction of fugitive       7/1/78      11/2/79  44 FR 63102, 11/2/79
                                    gaseous emissions.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                 33-15-18. Stack Heights
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-18-01......................  General provisions.....      10/1/87      1/13/89  53 FR 45763, 11/14/88
33-15-18-02......................  Good engineering             10/1/87      1/13/89  53 FR 45763, 11/14/88
                                    practice
                                    demonstrations.
33-15-18-03......................  Exemptions.............      10/1/87      1/13/89  53 FR 45763, 11/14/88
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                             33-15-19. Visibility Protection
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-19-01......................  General provisions.....      10/1/87     11/28/88  53 FR 37757, 9/28/88
33-15-19-02......................  Review of new major          10/1/87     11/28/88  53 FR 37757, 9/28/88
                                    stationary sources and
                                    major modifications.
33-15-19-03......................  Visibility monitoring..      10/1/87     11/28/88  53 FR 37757, 9/28/88
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                       33-15-20. Control of Emissions from Oil and Gas Well Production Facilities
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-20-01......................  General provisions.....       6/1/92     10/20/95  60 FR 43396, 8/21/95
33-15-20-02......................  Registration and              6/1/92     10/20/95  60 FR 43396, 8/21/95
                                    reporting requirements.
33-15-20-03......................  Prevention of                 6/1/92     10/20/95  60 FR 43396, 8/21/95
                                    significant
                                    deterioration
                                    applicability and
                                    source information
                                    requirements.
33-15-20-04......................  Requirements for              6/1/90      8/25/92  57 FR 28619, 6/26/92
                                    control of production
                                    facility emissions.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                     33-15-23. Fees
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-23-01......................  Definitions............       8/1/95      6/20/97  62 FR 19224, 4/21/97
33-15-23-02......................  Permit to construct           8/1/95      6/20/97  62 FR 19224, 4/21/97
                                    fees.
33-15-23-03......................  Minor source permit to        4/1/09      12/5/11  76 FR 68317, 11/4/11
                                    operate fees.
--------------------------------------------------------------------------------------------------------------------------------------------------------

[[Page 76216]]

 
                                                          33-15-25. Regional Haze Requirements
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-25-01......................  Definitions............       1/1/07       5/7/12  77 FR 20894, 4/6/12
33-15-25-02......................  Best available retrofit       1/1/07       5/7/12  77 FR 20894, 4/6/12
                                    technology.
33-15-25-03......................  Guidelines for best           1/1/07       5/7/12  77 FR 20894, 4/6/12
                                    available retrofit
                                    technology
                                    determinations under
                                    the regional haze rule.
33-15-25-04......................  Monitoring,                   1/1/07       5/7/12  77 FR 20894, 4/6/12
                                    recordkeeping, and
                                    reporting.
--------------------------------------------------------------------------------------------------------------------------------------------------------

    (d) EPA-approved source specific requirements.

--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                               State         EPA
             Rule No.                     Rule title         effective    effective           Final rule  citation/date                  Comments
                                                                date         date
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                           American Crystal Sugar at Drayton.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Chapter 8, Section 8.3., Permit    Continuous Emission           5/6/77     10/17/77  42 FR 55471, 10/17/77
 730015.                            Monitoring
                                    Requirements for
                                    Existing Stationary
                                    Sources, including
                                    Amendments to Permits
                                    to Operate and
                                    Department Order.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                            Coal Creek Station Units 1 and 2.
--------------------------------------------------------------------------------------------------------------------------------------------------------
PTC10005.........................  Air pollution Control        2/23/10       5/7/12  77 FR 20894, 4/6/12                        Excluding disapproved
                                    permit to construct                                                                           NOX BART emissions
                                    for best available                                                                            limits for Units 1 and
                                    retrofit technology                                                                           2 and corresponding
                                    (BART).                                                                                       monitoring,
                                                                                                                                  recordkeeping, and
                                                                                                                                  reporting
                                                                                                                                  requirements.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                             Heskett Station Units 1 and 2.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Chapter 8, Section 8.3., Permit    Continuous Emission           5/6/77     10/17/77  42 FR 55471, 10/17/77
 F76001.                            Monitoring
                                    Requirements for
                                    Existing Stationary
                                    Sources, including
                                    amendments to Permits
                                    to Operate and
                                    Department Order.
PTC 10028........................  Air Pollution Control        7/22/10       5/7/12  77 FR 20894, 4/6/12
                                    Permit to Construct
                                    for Best Available
                                    Retrofit Technology
                                    (BART) Heskett Unit 2.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                               Leland Olds Units 1 and 2.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Chapter 8, Section 9.3., Permit    Continuous Emission           5/6/77     10/17/77  42 FR 55471, 10/17/77
 730004.                            Monitoring
                                    Requirements for
                                    Existing Stationary
                                    Sources, including
                                    amendments to Permits
                                    to Operate and
                                    Department Order.
PTC10004.........................  Air pollution control        2/23/10       5/7/12  77 FR 20894, 4/6/12
                                    permit to construct
                                    for best available
                                    retrofit technology
                                    (BART).
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                         Milton R. Young Station Units 1 and 2.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Chapter 8, Section 8.3.2.........  Continuous Opacity            3/1/13      8/31/15  80 FR 37157, 6/30/15
                                    Monitoring for M.R.
                                    Young Station Unit 1
                                    Main Boiler.

[[Page 76217]]

 
PTC10007.........................  Air pollution control        2/23/10       5/7/12  77 FR 20894, 4/6/12
                                    permit to construct
                                    for best available
                                    retrofit technology
                                    (BART).
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                 Stanton Station Unit 1.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Chapter 8, Section 8.3.1., Permit  Compliance Schedule for      3/15/77       5/7/12  77 FR 20894, 4/6/12
 F76007.                            Installation of
                                    Continuous Opacity
                                    Monitoring Instruments.
PTC 10006........................  Air Pollution Control        2/23/10       5/7/12  77 FR 20894, 4/6/12
                                    Permit to Construct
                                    for Best Available
                                    Retrofit Technology
                                    (BART).
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                 Tesoro Mandan Refinery.
--------------------------------------------------------------------------------------------------------------------------------------------------------
77-311 APC.......................  Compliance Schedule for       5/9/77      7/28/08  73 FR 30308, 5/27/08
                                    Continuous Opacity
                                    Monitoring Instruments.
Chapter 8, Section 8.3.1.........  Continuous Opacity           2/27/07      7/28/08  73 FR 30308, 5/27/08
                                    Monitoring for Fluid
                                    Bed Catalytic Cracking
                                    Units: Tesoro Refining
                                    and Marketing Co.,
                                    Mandan Refinery.
--------------------------------------------------------------------------------------------------------------------------------------------------------

    (e) EPA-approved nonregulatory provisions.

 
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                               State         EPA
             Rule No.                     Rule title         effective    effective            Final rule citation/date                  Comments
                                                                date         date
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                Chapter 1. Introduction.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Sections 1.1. thru 1.7...........  Section 1.1., Purpose;       1/24/72      6/30/72  37 FR 10842, 5/31/72                       .......................
                                    1.2., Scope; 1.3.,
                                    Classification of
                                    Regions; 1.4., Public
                                    Hearings; 1.5.,
                                    Reports; 1.6.,
                                    Provisions for Making
                                    Emissions Data
                                    Available to the
                                    Public; 1.7.,
                                    Revisions,
                                    Individually
                                    Negotiated Compliance
                                    Schedules--Public
                                    Hearing (5/15/1973).
Section 1.8......................  Revisions: Public           11/20/73     11/16/77  42 FR 55471, 10/17/77
                                    Hearing (11/20/1973).
Section 1.9......................  Revisions: Public            5/22/74     11/16/77  42 FR 55471, 10/17/77
                                    Hearing (5/22/1974).
Section 1.10.....................  Public Hearing: (11/17/     11/17/75     11/16/77  42 FR 55471, 10/17/77
                                    1975) Adoption of
                                    regulations Pursuant
                                    to Request for
                                    Delegation of
                                    Authority to Implement
                                    and Enforce Federal
                                    NSPS, NESHAPS, and PSD
                                    Programs.
Section 1.13.....................  Revisions, Public            11/2/79      8/12/80  45 FR 53475, 8/12/80
                                    Hearing--Adoption of
                                    New and Revised Air
                                    Pollution Control
                                    Regulations and
                                    Revisions to the
                                    Implementation Plan.
Section 1.14.....................  Revisions to the              4/1/09     10/17/12  77 FR 57029, 9/17/12
                                    Implementation Plan.
--------------------------------------------------------------------------------------------------------------------------------------------------------

[[Page 76218]]

 
                                                               Chapter 2. Legal Authority.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Sections 2.1. thru 2.10..........  2.1., Introduction;          1/24/72      5/31/72  37 FR 10842, 5/31/72
                                    2.2., 420.11(a); 2.3.,
                                    420.11(b); 2.4.,
                                    420.11(c); 2.5.,
                                    420.11(d); 2.6.,
                                    420.11(e); 2.7.,
                                    420.11(f); 2.8.,
                                    Future Legal Authority
                                    Needs; 2.9., Legal
                                    Authority to Control
                                    Indirect Sources of
                                    Air Pollution; 2.10.,
                                    Legal Authority to
                                    Implement and Enforce
                                    Federal NSPS, NESHAPS,
                                    and PSD Programs.
Section 2.11.....................  Legal Authority for           7/1/79      8/12/80  45 FR 53475, 8/12/80
                                    Collection of Permit
                                    or Registration
                                    Processing Fees and
                                    Inspection Program
                                    Fees and Registration
                                    of Certain Air
                                    Contaminant Sources.
Section 2.15.....................  Respecting Boards......       3/1/13      8/28/13  78 FR 45867, 7/29/13
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                              Chapter 3. Control Strategy.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Section 3.1......................  Introduction...........      1/24/72      5/31/72  37 FR 10842, 5/31/72
Section 3.2......................  Control Strategy:            1/24/72      5/31/72  37 FR 10842, 5/31/72
                                    Particulate Matter.
Section 3.2.1....................  Control Strategy:             1/1/89      9/10/90  55 FR 32403, 8/0/90
                                    Particulate Matter
                                    (PM10).
Section 3.3......................  Control Strategy:            1/24/72      5/31/72  37 FR 10842, 5/31/72
                                    Sulphur Oxides.
Section 3.4......................  Control Strategy:            1/24/72      5/31/72  37 FR 10842, 5/31/72
                                    Carbon Monoxide,
                                    Hydrocarbons,
                                    Photochemical
                                    Oxidants, and Nitrogen
                                    Dioxide.
Section 3.5......................  Future Control Strategy      1/24/72      5/31/72  37 FR 10842, 5/31/72
                                    Needs.
Section 3.6......................  Identification and           1/24/72      5/31/72  37 FR 10842, 5/31/72
                                    Designation of Air
                                    Quality Maintenance
                                    Areas.
Section 3.7......................  Visibility--Long-Term    ...........      12/4/89  54 FR 41094, 10/5/89
                                    Strategy.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                            Chapter 4. Compliance Schedules.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Chapter 4........................  Compliance Schedules...      2/19/74      5/31/72  37 FR 10842, 5/31/72
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                               Chapter 5. Prevention of Air Pollution Emergency Episodes.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Chapter 5........................  Prevention of Air            1/24/72      5/31/72  37 FR 10842, 5/31/72
                                    Pollution Emergency
                                    Episodes.
Section 5.2.1....................  Replacement of TSP            1/1/89      9/10/90  55 FR 32403, 8/9/90
                                    levels with PM10
                                    levels.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                          Chapter 6. Air Quality Surveillance.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Section 6.1 thru 6.7.............  6.1., Introduction;           1/1/80      8/12/80  45 FR 53475, 8/12/80
                                    6.2., Ambient Air
                                    Quality Monitoring
                                    Network Design; 6.3.,
                                    Ambient Air Quality
                                    Monitoring Network
                                    Description; 6.4.,
                                    Station Designations;
                                    6.5., Air Quality
                                    Monitoring Criteria;
                                    6.6., Episode
                                    Monitoring; 6.7., Data
                                    Reporting.
Section 6.8......................  Annual Network Review..       4/1/09     10/17/12  77 FR 57029, 9/17/12
Section 6.9......................  Public Notification....       1/1/80      8/12/80  45 FR 53475, 8/12/89
Section 6.10.....................  Visibility Monitoring..      10/1/87     11/28/88  53 FR 37757, 9/28/88
Section 6.11.....................  Particulate Matter            1/1/89      9/10/90  55 FR 32403, 8/9/90
                                    (PM10).
Section 6.11.3...................  Ozone..................       4/1/09     10/17/12  77 FR 57029, 9/17/12

[[Page 76219]]

 
Section 6.13.....................  Visibility Monitoring:        1/9/96      6/20/97  62 FR 19224, 4/21/97
                                    Theodore Roosevelt
                                    National Park.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                   Chapter 7. Review of New Sources and Modifications.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Sections 7.1 thru 7.6............  Review of New Sources        1/24/72      5/31/72  37 FR 10842, 5/31/72
                                    and Modifications.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                           Chapter 7.7. Air Quality Modeling.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Section 7.7......................  Air Quality Modeling...       4/1/09     10/17/09  77 FR 57029, 9/17/09
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                           Chapter 7.8. Interstate Transport.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Section 7.8......................  Interstate Transport of       4/1/09       7/6/10  75 FR 31290, 6/3/10
                                    Air Pollution.
Section 7.8.1....................  Interstate Transport          4/1/09     12/22/10  75 FR 71023, 11/22/10
                                    Relating to the 1997 8-
                                    hour Ozone and PM2.5
                                    National Ambient Air
                                    Quality Standards.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                             Chapter 8. Source Surveillance.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Chapter 8........................  Source Surveillance....      1/24/72      5/31/72  37 FR 10842, 5/31/72
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                  Chapter 9. Resources.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Chapter 9........................  Resources..............       4/1/09     10/17/12  77 FR 57029, 9/17/12
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                       Chapter 10. Intergovernmental Cooperation.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Chapter 10.......................  Intergovernmental            1/24/72      5/31/72  37 FR 10842, 5/31/72
                                    Cooperation.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                   Chapter 12. The Small Business Assistance Program.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Chapter 12.......................  The Small Business          10/23/92      2/10/94  59 FR 1485, 1/11/94
                                    Assistance Program.
--------------------------------------------------------------------------------------------------------------------------------------------------------

[FR Doc. 2015-30823 Filed 12-7-15; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.