Delfin LNG LLC; Notice of Amendment to Application, 76003-76004 [2015-30736]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 234 / Monday, December 7, 2015 / Notices
County Wind, LLC, FPL Energy Cabazon
Wind, LLC, FPL Energy Cape, LLC, FPL
Energy Cowboy Wind, LLC, FPL Energy
Green Power Wind, LLC, FPL Energy
Hancock County Wind, LLC, FPL
Energy Illinois Wind, LLC, FPL Energy
Marcus Hook, L.P., FPL Energy MH50
L.P., FPL Energy Montezuma Wind,
LLC, FPL Energy Mower County, LLC,
FPL Energy New Mexico Wind, LLC,
FPL Energy North Dakota Wind, LLC,
FPL Energy North Dakota Wind II, LLC,
FPL Energy Oklahoma Wind, LLC, FPL
Energy Oliver Wind I, LLC, FPL Energy
Oliver Wind II, LLC, FPL Energy Sooner
Wind, LLC, FPL Energy South Dakota
Wind, LLC, FPL Energy Stateline II, Inc.,
FPL Energy Vansycle, L.L.C, FPL Energy
Wyman, LLC, FPL Energy Wyman IV,
LLC, Garden Wind, LLC, Genesis Solar,
LLC, Golden West Power Partners, LLC,
Gray County Wind Energy, LLC, Green
Mountain Storage, LLC, Hatch Solar
Energy Center I, LLC, Hawkeye Power
Partners, LLC, High Majestic Wind
Energy Center, LLC, High Majestic Wind
II, LLC, High Winds, LLC, Jamaica Bay
Peaking Facility, LLC, Lake Benton
Power Partners II, LLC, Langdon Wind,
LLC, Limon Wind, LLC, Limon Wind II,
LLC, Limon Wind III, LLC, Logan Wind
Energy LLC, Mammoth Plains Wind
Project, LLC.
Description: Supplement to October
28, 2015 Notice of Change in Status of
the NextEra Energy Companies [Part 1 of
2].
Filed Date: 11/25/15.
Accession Number: 20151125–5220.
Comments Due: 5 p.m. ET 12/16/15.
Docket Numbers: ER16–414–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revised Service Agreement No. 1135;
Queue K4 (ISA—Assignment
Agreement) to be effective 6/4/2004.
Filed Date: 11/30/15.
Accession Number: 20151130–5047.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: ER16–415–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revised Service Agreement No. 1791;
Queue R74 (WMPA—Assignment
Agreement) to be effective 10/30/2007.
Filed Date: 11/30/15.
Accession Number: 20151130–5057.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: ER16–416–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original Service Agreement No. 4312;
Queue No. AA2–058 to be effective
10/29/2015.
Filed Date: 11/30/15.
VerDate Sep<11>2014
18:36 Dec 04, 2015
Jkt 238001
Accession Number: 20151130–5083.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: ER16–417–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Distribution Service Agreement Mirasol
Development, LLC Ivanhoe Land 1A
Project to be effective 1/30/2016.
Filed Date: 11/30/15.
Accession Number: 20151130–5092.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: ER16–418–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Distribution Service Agreement Mirasol
Development, LLC Ivanhoe Land 1B
Project to be effective 1/30/2016.
Filed Date: 11/30/15.
Accession Number: 20151130–5093.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: ER16–419–000.
Applicants: Dominion Energy
Marketing, Inc.
Description: Compliance filing:
Compliance Filing—DEMI Removal of
Affiliate Waiver to be effective
11/1/2015.
Filed Date: 11/30/15.
Accession Number: 20151130–5124.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: ER16–420–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3103
Plains and Eastern Clean Line
Oklahoma & SPS Inter Agr to be
effective 11/6/2015.
Filed Date: 11/30/15.
Accession Number: 20151130–5152.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: ER16–421–000.
Applicants: Dominion Nuclear
Connecticut, Inc.
Description: Compliance filing:
Compliance Filing—DNCI Removal of
Affiliate Waiver to be effective
11/1/2015.
Filed Date: 11/30/15.
Accession Number: 20151130–5153.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: ER16–422–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original Service Agreement No. 4300;
Queue No. Z1–079 to be effective
10/30/2015.
Filed Date: 11/30/15.
Accession Number: 20151130–5163.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: ER16–423–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Second Revised Service Agreement No.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
76003
2775; Queue No. Y3–045/Y3–052/Y3–
107 to be effective 10/29/2015.
Filed Date: 11/30/15.
Accession Number: 20151130–5172.
Comments Due: 5 p.m. ET 12/21/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30705 Filed 12–4–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–490–001]
Delfin LNG LLC; Notice of Amendment
to Application
Take notice that on November 19,
2015 Delfin LNG LLC (Delfin LNG),
1100 Louisiana Street, Houston, Texas
77002, filed in Docket No. CP15–490–
001, an amendment to its May 8, 2015
application pursuant to section 7(c) of
the Natural Gas Act and Part 157 of the
Commission’s regulations requesting
authorization to reactivate, construct,
own, operate and maintain certain
pipeline and compression facilities that
comprise the onshore portion of Delfin
LNG’s proposed Deepwater Port (DWP),
an offshore liquefied natural gas facility
located off the coast of Louisiana in the
Gulf of Mexico. The Amendment
increases the amount of compression
and capacity previously proposed, all as
more fully set forth in the application
which is on file with the Commission
and open to public inspection. This
filing may be viewed on the web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
E:\FR\FM\07DEN1.SGM
07DEN1
mstockstill on DSK4VPTVN1PROD with NOTICES
76004
Federal Register / Vol. 80, No. 234 / Monday, December 7, 2015 / Notices
the docket number field to access the
document. For assistance, please contact
FERC at FERCOnlineSupport@ferc.gov
or call toll-free, (886) 208–3676 or TYY,
(202) 502–8659.
Any questions regarding this
Application should be directed to
Daniel P. Werner, Delfin LNG LLC, 1100
Louisiana Street, Suite 3550, Houston,
Texas 77002; phone: 346–240–2574, or
J. Patrick Nevins, Hogan Lovells US
LLP, 555 Thirteenth Street NW.,
Washington, DC 20004; phone: 202–
637–6441.
Delfin LNG’s onshore facilities will
connect with the DWP facilities that are
subject to jurisdiction of the Maritime
Authority (MARAD) and the United
States Coast Guard (USCG).
Additionally, as part of Delfin LNG’s
DWP, Delfin LNG proposes to utilize a
segment of pipeline abandoned by High
Island Offshore System, LLC (HIOS) that
extends from the terminus of the UTOS
pipeline offshore. HIOS filed to abandon
certain pipeline facilities on November
19, 2015 in Docket No. CP16–20–000.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
VerDate Sep<11>2014
18:36 Dec 04, 2015
Jkt 238001
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and ill not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link.
Comment Date: December 22, 2015.
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
Dated: December 1, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30736 Filed 12–4–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
Willey Battery Utility,
LLC ...............................
Little Elk Wind Project,
LLC ...............................
Patriot Wind Farm, LLC ..
Chapman Ranch Wind I,
LLC ...............................
Silver State Solar Power
South, LLC ...................
RE Garland LLC ...............
RE Garland A LLC ...........
Latigo Wind Park, LLC ....
Parrey, LLC ......................
South Plains Wind Energy, LLC ......................
PHR Holdings LLC ..........
Golden West Power Partners, LLC ......................
EG15–108–000
EG15–109–000
EG15–110–000
EG15–111–000
EG15–112–000
EG15–113–000
EG15–114–000
EG15–116–000
EG15–117–000
EG15–118–000
EG15–119–000
EG15–120–000
Take notice that during the month of
October 2015, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a).
Dated: November 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30699 Filed 12–4–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Staff Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following meeting related to the
transmission planning activities of the
South Carolina Regional Planning
(SCRTP) Stakeholder Group.
South Carolina Regional Transmission
Planning Meeting, December 9, 2015
(10:00 a.m.–1:00 p.m.)
The above-referenced meeting will be
held at:
Hilton Garden Inn—Charleston Airport,
Cypress I Room, 5265 International
Blvd., North Charleston, SC 29418.
(843) 308–9330
The meeting is open to the public.
E:\FR\FM\07DEN1.SGM
07DEN1
Agencies
[Federal Register Volume 80, Number 234 (Monday, December 7, 2015)]
[Notices]
[Pages 76003-76004]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-30736]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP15-490-001]
Delfin LNG LLC; Notice of Amendment to Application
Take notice that on November 19, 2015 Delfin LNG LLC (Delfin LNG),
1100 Louisiana Street, Houston, Texas 77002, filed in Docket No. CP15-
490-001, an amendment to its May 8, 2015 application pursuant to
section 7(c) of the Natural Gas Act and Part 157 of the Commission's
regulations requesting authorization to reactivate, construct, own,
operate and maintain certain pipeline and compression facilities that
comprise the onshore portion of Delfin LNG's proposed Deepwater Port
(DWP), an offshore liquefied natural gas facility located off the coast
of Louisiana in the Gulf of Mexico. The Amendment increases the amount
of compression and capacity previously proposed, all as more fully set
forth in the application which is on file with the Commission and open
to public inspection. This filing may be viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in
[[Page 76004]]
the docket number field to access the document. For assistance, please
contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886)
208-3676 or TYY, (202) 502-8659.
Any questions regarding this Application should be directed to
Daniel P. Werner, Delfin LNG LLC, 1100 Louisiana Street, Suite 3550,
Houston, Texas 77002; phone: 346-240-2574, or J. Patrick Nevins, Hogan
Lovells US LLP, 555 Thirteenth Street NW., Washington, DC 20004; phone:
202-637-6441.
Delfin LNG's onshore facilities will connect with the DWP
facilities that are subject to jurisdiction of the Maritime Authority
(MARAD) and the United States Coast Guard (USCG). Additionally, as part
of Delfin LNG's DWP, Delfin LNG proposes to utilize a segment of
pipeline abandoned by High Island Offshore System, LLC (HIOS) that
extends from the terminus of the UTOS pipeline offshore. HIOS filed to
abandon certain pipeline facilities on November 19, 2015 in Docket No.
CP16-20-000.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 7 copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenter's will not be required to serve copies of filed
documents on all other parties. However, the non-party commentary, will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and ill not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link.
Comment Date: December 22, 2015.
Dated: December 1, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-30736 Filed 12-4-15; 8:45 am]