Millennium Pipeline Company, L.L.C.; Notice of Application, 76012-76013 [2015-30709]
Download as PDF
76012
Federal Register / Vol. 80, No. 234 / Monday, December 7, 2015 / Notices
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated December 1, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
mstockstill on DSK4VPTVN1PROD with NOTICES
Filings in Existing Proceedings
[FR Doc. 2015–30747 Filed 12–4–15; 8:45 am]
Docket Numbers: RP15–55–002.
Applicants: Columbia Gulf
Transmission, LLC.
Description: Compliance filing
Negotiated & Non-Conforming Service
Agmt—West Side Compliance Filing to
be effective 11/1/2014.
Filed Date: 12/1/15.
Accession Number: 20151201–5002.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: RP15–1277–001.
Applicants: Algonquin Gas
Transmission, LLC.
Description: Compliance filing Pro
Forma OBA—RP15–1277 Compliance
Filing to be effective 11/1/2015.
Filed Date: 11/25/15.
Accession Number: 20151125–5161.
Comments Due: 5 p.m. ET 12/7/15.
Docket Numbers: RP15–1278–001.
Applicants: Maritimes & Northeast
Pipeline, L.L.C.
Description: Compliance filing Pro
Forma OBA—RP15–1278 Compliance
Filing to be effective 11/1/2015.
Filed Date: 11/25/15.
Accession Number: 20151125–5169.
Comments Due: 5 p.m. ET 12/7/15.
Docket Numbers: RP15–1279–001.
Applicants: Texas Eastern
Transmission, LP.
Description: Compliance filing Pro
Forma OBA—RP15–1279 Compliance
Filing to be effective 11/1/2015.
Filed Date: 11/25/15.
Accession Number: 20151125–5171.
Comments Due: 5 p.m. ET 12/7/15.
Docket Numbers: RP15–1322–001.
Applicants: Sabine Pipe Line LLC.
Description: Compliance filing Sabine
Pipe Line November 30 Compliance to
be effective 12/31/9998.
Filed Date: 11/30/15.
Accession Number: 20151130–5271.
Comments Due: 5 p.m. ET 12/14/15.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
BILLING CODE 6717–01–P
VerDate Sep<11>2014
18:36 Dec 04, 2015
Jkt 238001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–17–000; PF–15–23–000]
Millennium Pipeline Company, L.L.C.;
Notice of Application
Take notice that on November 13,
2015, Millennium Pipeline Company,
L.L.C. (Millennium) One Blue Hill
Plaza, Pearl River, New York 10965,
filed in Docket No. CP16–17–000, an
application pursuant to section 7(c) of
the Natural Gas Act and Part 157 of the
Commission’s regulations, for a
certificate of public convenience and
necessity to construct and operate its
Valley Lateral Project to provide
approximately 130,000 dekatherms per
day (Dth/d) of firm transportation
service to CPV Valley, LLC to serve a
new natural gas combined-cycle electric
generator in the Town of Wawayanda,
New York (CPV Valley Energy Center).
Specifically, Millennium seeks to
construct an approximately 7.8-mile, 16inch diameter lateral pipeline from
Millennium’s existing mainline in
Orange County, New York to the CPV
Valley Energy Center, all as more fully
set forth in the application, which is on
file with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Gary
A. Kruse, One Blue Hill Plaza, Pearl
River, New York 10965, phone: (845)
620–1300, or email: kruse@
millenniumpipeline.com.
On April 30, 2015, the Commission
staff granted Millennium’s request to
utilize the Pre-Filing Process and
assigned Docket No. PF15–23–000 to
staff activities involved in the Valley
Lateral Project. Now, as of the
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
November 13, 2015 application, the PreFiling Process for this project has ended.
From this time forward, this proceeding
will be conducted in Docket No. CP16–
17–000, as noted in the caption of this
Notice.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice, the
Commission staff will issue a Notice of
Schedule for Environmental Review. If
a Notice of Schedule for Environmental
Review is issued, it will indicate, among
other milestones, the anticipated date
for the Commission staff’s issuance of
the final environmental impact
statement (FEIS) for this proposal. The
issuance of a Notice of Schedule for
Environmental Review will serve to
notify federal and state agencies of the
timing for the completion of all
necessary reviews, and the subsequent
need to complete all federal
authorizations within 90 days of the
date of issuance of the Commission
staff’s FEIS.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
E:\FR\FM\07DEN1.SGM
07DEN1
Federal Register / Vol. 80, No. 234 / Monday, December 7, 2015 / Notices
2474–004; ER13–2461–003; ER13–2458–
002; ER12–895–008; ER12–676–007;
ER12–631–008; ER12–2444–007; ER12–
1880–009; ER12–1660–008; ER11–4678–
008; ER11–4677–008; ER11–4462–013;
ER11–4428–010; ER11–2365–007;
ER11–2192–008; ER10–2720–010;
ER10–2078–009; ER10–1995–007;
ER10–1994–007; ER10–1993–008;
ER10–1991–008; ER10–1990–008;
ER10–1989–007; ER10–1986–008;
ER10–1985–007; ER10–1984–008;
ER10–1983–008; ER10–1976–007;
ER10–1975–018; ER10–1974–017;
ER10–1973–007; ER10–1972–008;
ER10–1971–022; ER10–1970–008;
ER10–1968–008; ER10–1967–008;
ER10–1951–010.
Applicants: Mantua Creek Solar, LLC,
McCoy Solar, LLC, Meyersdale Storage,
LLC, Meyersdale Windpower LLC, Mill
Run Windpower, LLC, Minco Wind,
LLC, Minco Wind II, LLC, Minco Wind
III, LLC, Minco Wind Interconnection
Services, LLC, Mountain View Solar,
LLC, NEPM II, LLC, NextEra Energy
Duane Arnold, LLC, NextEra Energy
Montezuma II Wind, LLC, NextEra
Energy Point Beach, LLC, NextEra
Energy Power Marketing, LLC, NextEra
Energy Seabrook, LLC, NextEra Energy
Services Massachusetts, LLC, Northeast
Energy Associates, A Limited
Partnership, North Jersey Energy
Associates, A Limited Partnership,
North Sky River Energy, LLC, Northern
Colorado Wind Energy, LLC, Osceola
Windpower, LLC, Osceola Windpower
II, LLC, Palo Duro Wind Energy, LLC,
Palo Duro Wind Interconnection
Services, LLC, Paradise Solar Urban
Renewal, L.L.C., Peetz Table Wind
Energy, LLC, Pennsylvania Windfarms,
Inc., Perrin Ranch Wind, LLC, Pheasant
Run Wind, LLC, Red Mesa Wind, LLC,
Seiling Wind, LLC, Seiling Wind II,
Dated: November 30, 2015.
LLC, Seiling Wind Interconnection
Nathaniel J. Davis, Sr.,
Services, LLC, Silver State Solar Power
South, LLC, Shafter Solar, LLC, Sky
Deputy Secretary.
River LLC, Sky River Asset Holdings,
[FR Doc. 2015–30709 Filed 12–4–15; 8:45 am]
LLC, Somerset Windpower, LLC, Steele
BILLING CODE 6717–01–P
Flats Wind Project, LLC, Story Wind,
LLC, Tuscola Bay Wind, LLC, Tuscola
Wind II, LLC, Vasco Winds, LLC,
DEPARTMENT OF ENERGY
Waymart Wind Farm, L.P., Wessington
Federal Energy Regulatory
Wind Energy Center, LLC, White Oak
Commission
Energy LLC, Wilton Wind II, LLC,
Windpower Partners 1993, LLC.
Combined Notice of Filings #2
Description: Supplement to October
280, 2015 Notice of Change in Status of
Take notice that the Commission
the NextEra Energy Companies [Part 2 of
received the following electric rate
2].
filings:
Filed Date: 11/25/15.
Docket Numbers: ER15–58–003;
Accession Number: 20151125–5335.
ER15–30–003; ER15–2602–001; ER15–
Comments Due: 5 p.m. ET 12/16/15.
2243–001; ER15–2134–001; ER15–1375–
Docket Numbers: ER15–2565–001.
001; ER15–1016–001; ER14–2710–005;
Applicants: California Independent
ER14–2709–005; ER14–2708–006;
System Operator Corporation.
ER14–21–004; ER14–1630–005; ER13–
mstockstill on DSK4VPTVN1PROD with NOTICES
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on December 21, 2015.
VerDate Sep<11>2014
18:36 Dec 04, 2015
Jkt 238001
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
76013
Description: Compliance filing: 2015–
11–30 Compliance Filing-EIM
Transition Period to be effective 11/1/
2015.
Filed Date: 11/30/15.
Accession Number: 20151130–5248.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: ER16–424–000.
Applicants: Dominion Energy
Manchester Street, Inc.
Description: Compliance filing:
Compliance Filing—DEMS Removal of
Affiliate Waiver to be effective 11/1/
2015.
Filed Date: 11/30/15.
Accession Number: 20151130–5215.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: ER16–425–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing: 205
filing tariff revision re: scarcity pricing
to be effective 12/31/9998.
Filed Date: 11/30/15.
Accession Number: 20151130–5216.
Comments Due: 5 p.m. ET 12/21/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30706 Filed 12–4–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[P–20–110]
Pacificorp; Notice of Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
E:\FR\FM\07DEN1.SGM
07DEN1
Agencies
[Federal Register Volume 80, Number 234 (Monday, December 7, 2015)]
[Notices]
[Pages 76012-76013]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-30709]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP16-17-000; PF-15-23-000]
Millennium Pipeline Company, L.L.C.; Notice of Application
Take notice that on November 13, 2015, Millennium Pipeline Company,
L.L.C. (Millennium) One Blue Hill Plaza, Pearl River, New York 10965,
filed in Docket No. CP16-17-000, an application pursuant to section
7(c) of the Natural Gas Act and Part 157 of the Commission's
regulations, for a certificate of public convenience and necessity to
construct and operate its Valley Lateral Project to provide
approximately 130,000 dekatherms per day (Dth/d) of firm transportation
service to CPV Valley, LLC to serve a new natural gas combined-cycle
electric generator in the Town of Wawayanda, New York (CPV Valley
Energy Center). Specifically, Millennium seeks to construct an
approximately 7.8-mile, 16-inch diameter lateral pipeline from
Millennium's existing mainline in Orange County, New York to the CPV
Valley Energy Center, all as more fully set forth in the application,
which is on file with the Commission and open to public inspection. The
filing may also be viewed on the web at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-
free, (866) 208-3676 or TTY, (202) 502-8659.
Any questions regarding this application should be directed to Gary
A. Kruse, One Blue Hill Plaza, Pearl River, New York 10965, phone:
(845) 620-1300, or email: kruse@millenniumpipeline.com.
On April 30, 2015, the Commission staff granted Millennium's
request to utilize the Pre-Filing Process and assigned Docket No. PF15-
23-000 to staff activities involved in the Valley Lateral Project. Now,
as of the November 13, 2015 application, the Pre-Filing Process for
this project has ended. From this time forward, this proceeding will be
conducted in Docket No. CP16-17-000, as noted in the caption of this
Notice.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice, the Commission staff will issue a Notice
of Schedule for Environmental Review. If a Notice of Schedule for
Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) for this proposal. The
issuance of a Notice of Schedule for Environmental Review will serve to
notify federal and state agencies of the timing for the completion of
all necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 7 copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to
[[Page 76013]]
the party or parties directly involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
There is an ``eSubscription'' link on the Web site that enables
subscribers to receive email notification when a document is added to a
subscribed docket(s). For assistance with any FERC Online service,
please email FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll
free). For TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on December 21, 2015.
Dated: November 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-30709 Filed 12-4-15; 8:45 am]
BILLING CODE 6717-01-P