Pacificorp; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 76013-76014 [2015-30702]
Download as PDF
Federal Register / Vol. 80, No. 234 / Monday, December 7, 2015 / Notices
2474–004; ER13–2461–003; ER13–2458–
002; ER12–895–008; ER12–676–007;
ER12–631–008; ER12–2444–007; ER12–
1880–009; ER12–1660–008; ER11–4678–
008; ER11–4677–008; ER11–4462–013;
ER11–4428–010; ER11–2365–007;
ER11–2192–008; ER10–2720–010;
ER10–2078–009; ER10–1995–007;
ER10–1994–007; ER10–1993–008;
ER10–1991–008; ER10–1990–008;
ER10–1989–007; ER10–1986–008;
ER10–1985–007; ER10–1984–008;
ER10–1983–008; ER10–1976–007;
ER10–1975–018; ER10–1974–017;
ER10–1973–007; ER10–1972–008;
ER10–1971–022; ER10–1970–008;
ER10–1968–008; ER10–1967–008;
ER10–1951–010.
Applicants: Mantua Creek Solar, LLC,
McCoy Solar, LLC, Meyersdale Storage,
LLC, Meyersdale Windpower LLC, Mill
Run Windpower, LLC, Minco Wind,
LLC, Minco Wind II, LLC, Minco Wind
III, LLC, Minco Wind Interconnection
Services, LLC, Mountain View Solar,
LLC, NEPM II, LLC, NextEra Energy
Duane Arnold, LLC, NextEra Energy
Montezuma II Wind, LLC, NextEra
Energy Point Beach, LLC, NextEra
Energy Power Marketing, LLC, NextEra
Energy Seabrook, LLC, NextEra Energy
Services Massachusetts, LLC, Northeast
Energy Associates, A Limited
Partnership, North Jersey Energy
Associates, A Limited Partnership,
North Sky River Energy, LLC, Northern
Colorado Wind Energy, LLC, Osceola
Windpower, LLC, Osceola Windpower
II, LLC, Palo Duro Wind Energy, LLC,
Palo Duro Wind Interconnection
Services, LLC, Paradise Solar Urban
Renewal, L.L.C., Peetz Table Wind
Energy, LLC, Pennsylvania Windfarms,
Inc., Perrin Ranch Wind, LLC, Pheasant
Run Wind, LLC, Red Mesa Wind, LLC,
Seiling Wind, LLC, Seiling Wind II,
Dated: November 30, 2015.
LLC, Seiling Wind Interconnection
Nathaniel J. Davis, Sr.,
Services, LLC, Silver State Solar Power
South, LLC, Shafter Solar, LLC, Sky
Deputy Secretary.
River LLC, Sky River Asset Holdings,
[FR Doc. 2015–30709 Filed 12–4–15; 8:45 am]
LLC, Somerset Windpower, LLC, Steele
BILLING CODE 6717–01–P
Flats Wind Project, LLC, Story Wind,
LLC, Tuscola Bay Wind, LLC, Tuscola
Wind II, LLC, Vasco Winds, LLC,
DEPARTMENT OF ENERGY
Waymart Wind Farm, L.P., Wessington
Federal Energy Regulatory
Wind Energy Center, LLC, White Oak
Commission
Energy LLC, Wilton Wind II, LLC,
Windpower Partners 1993, LLC.
Combined Notice of Filings #2
Description: Supplement to October
280, 2015 Notice of Change in Status of
Take notice that the Commission
the NextEra Energy Companies [Part 2 of
received the following electric rate
2].
filings:
Filed Date: 11/25/15.
Docket Numbers: ER15–58–003;
Accession Number: 20151125–5335.
ER15–30–003; ER15–2602–001; ER15–
Comments Due: 5 p.m. ET 12/16/15.
2243–001; ER15–2134–001; ER15–1375–
Docket Numbers: ER15–2565–001.
001; ER15–1016–001; ER14–2710–005;
Applicants: California Independent
ER14–2709–005; ER14–2708–006;
System Operator Corporation.
ER14–21–004; ER14–1630–005; ER13–
mstockstill on DSK4VPTVN1PROD with NOTICES
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on December 21, 2015.
VerDate Sep<11>2014
18:36 Dec 04, 2015
Jkt 238001
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
76013
Description: Compliance filing: 2015–
11–30 Compliance Filing-EIM
Transition Period to be effective 11/1/
2015.
Filed Date: 11/30/15.
Accession Number: 20151130–5248.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: ER16–424–000.
Applicants: Dominion Energy
Manchester Street, Inc.
Description: Compliance filing:
Compliance Filing—DEMS Removal of
Affiliate Waiver to be effective 11/1/
2015.
Filed Date: 11/30/15.
Accession Number: 20151130–5215.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: ER16–425–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing: 205
filing tariff revision re: scarcity pricing
to be effective 12/31/9998.
Filed Date: 11/30/15.
Accession Number: 20151130–5216.
Comments Due: 5 p.m. ET 12/21/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30706 Filed 12–4–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[P–20–110]
Pacificorp; Notice of Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
E:\FR\FM\07DEN1.SGM
07DEN1
mstockstill on DSK4VPTVN1PROD with NOTICES
76014
Federal Register / Vol. 80, No. 234 / Monday, December 7, 2015 / Notices
with the Commission and is available
for public inspection.
a. Application Type: Amendment of
license.
b. Project No.: 20–110.
c. Date Filed: November 12, 2015.
d. Applicant: PacifiCorp.
e. Name of Project: Bear River
Hydroelectric Project.
f. Location: Bear River in Caribou and
Franklin counties, Idaho.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Mark
Stenberg, Managing Director, Hydro
Resources, PacifiCorp, 825 NE
Multnomah, Portland, Portland, OR
97232, mark.stenberg@pacificorp.com,
208–547–7305.
i. FERC Contact: Anumzziatta
Purchiaroni, (202) 502–6191,
anumzziatta.purchiaroni@ferc.gov.
j. Deadline for filing motions to
intervene and protests: December 30,
2015.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–20–110.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
licensee is proposing to revise the
project boundary to include land
changes at the Soda, Grace, and Oneida
developments.
Changes to Soda Development
include adding a gaging station and
access road below the dam within the
project boundary and adjusting the
VerDate Sep<11>2014
18:36 Dec 04, 2015
Jkt 238001
project boundary to better fit shoreline
buffers and conservation lands.
Changes to Grace Development
include minor revisions to the project
boundary around the powerhouse to
reflect the recently updated U.S. Bureau
of Land Management (BLM) permit,
identifying lands under the Federal
Land Policy and Management Act of
1976, providing a more accurate
description of project lands along the
Grace flowline, adding conservation
lands identified in the Grace/Last
Chance Site plan, expanded the project
boundary to the headwater to include
all lands necessary for project
operations, included two additional
structures necessary for maintain the
operating elevation of the reservoir, and
identifying private lands under the
reservoir.
Changes to Oneida Development
include adding an access road on BLM
land, identifying two areas of private
lands under the reservoir, correctly
identifying lands owned by BLM or
Bureau of Reclamation, and adding
conservation lands managed under the
revised Oneida Site Plan.
l. Locations of the Application: A
copy is also available for inspection and
reproduction in the Commission’s
Public Reference Room located at 888
First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502–8371.
This filing may also be viewed on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the
last three digits in the docket number
field (P–20) to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. All
comments, motions to intervene, or
protests should relate to project
boundary changes, which are the subject
of the license amendment. Any filing
made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: November 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30702 Filed 12–4–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–1196–003.
Applicants: Nevada Power Company,
Sierra Pacific Power Company.
Description: Supplement to July 13,
2015 Compliance Filing of Nevada
Power Company and Sierra Pacific
Power Company.
Filed Date: 11/30/15.
Accession Number: 20151130–5460.
Comments Due: 5 p.m. ET 12/21/15.
Docket Numbers: ER15–2641–001.
Applicants: ISO New England Inc.
Description: Compliance filing: Notice
of Effective Date for CTS, Compliance
and Conforming Filing to be effective
12/15/2015.
Filed Date: 12/1/15.
Accession Number: 20151201–5105.
Comments Due: 5 p.m. ET 12/22/15.
Docket Numbers: ER16–426–000.
E:\FR\FM\07DEN1.SGM
07DEN1
Agencies
[Federal Register Volume 80, Number 234 (Monday, December 7, 2015)]
[Notices]
[Pages 76013-76014]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-30702]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[P-20-110]
Pacificorp; Notice of Application Accepted for Filing and
Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed
[[Page 76014]]
with the Commission and is available for public inspection.
a. Application Type: Amendment of license.
b. Project No.: 20-110.
c. Date Filed: November 12, 2015.
d. Applicant: PacifiCorp.
e. Name of Project: Bear River Hydroelectric Project.
f. Location: Bear River in Caribou and Franklin counties, Idaho.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Mark Stenberg, Managing Director, Hydro
Resources, PacifiCorp, 825 NE Multnomah, Portland, Portland, OR 97232,
mark.stenberg@pacificorp.com, 208-547-7305.
i. FERC Contact: Anumzziatta Purchiaroni, (202) 502-6191,
anumzziatta.purchiaroni@ferc.gov.
j. Deadline for filing motions to intervene and protests: December
30, 2015.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests, comments, or recommendations using the
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-20-110.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: The licensee is proposing to revise the
project boundary to include land changes at the Soda, Grace, and Oneida
developments.
Changes to Soda Development include adding a gaging station and
access road below the dam within the project boundary and adjusting the
project boundary to better fit shoreline buffers and conservation
lands.
Changes to Grace Development include minor revisions to the project
boundary around the powerhouse to reflect the recently updated U.S.
Bureau of Land Management (BLM) permit, identifying lands under the
Federal Land Policy and Management Act of 1976, providing a more
accurate description of project lands along the Grace flowline, adding
conservation lands identified in the Grace/Last Chance Site plan,
expanded the project boundary to the headwater to include all lands
necessary for project operations, included two additional structures
necessary for maintain the operating elevation of the reservoir, and
identifying private lands under the reservoir.
Changes to Oneida Development include adding an access road on BLM
land, identifying two areas of private lands under the reservoir,
correctly identifying lands owned by BLM or Bureau of Reclamation, and
adding conservation lands managed under the revised Oneida Site Plan.
l. Locations of the Application: A copy is also available for
inspection and reproduction in the Commission's Public Reference Room
located at 888 First Street NE., Room 2A, Washington, DC 20426, or by
calling (202) 502-8371. This filing may also be viewed on the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the last three digits in the docket
number field (P-20) to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above. Agencies may obtain copies of the application directly from
the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. All comments, motions to intervene, or protests
should relate to project boundary changes, which are the subject of the
license amendment. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: November 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-30702 Filed 12-4-15; 8:45 am]
BILLING CODE 6717-01-P