Pacificorp; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 76013-76014 [2015-30702]

Download as PDF Federal Register / Vol. 80, No. 234 / Monday, December 7, 2015 / Notices 2474–004; ER13–2461–003; ER13–2458– 002; ER12–895–008; ER12–676–007; ER12–631–008; ER12–2444–007; ER12– 1880–009; ER12–1660–008; ER11–4678– 008; ER11–4677–008; ER11–4462–013; ER11–4428–010; ER11–2365–007; ER11–2192–008; ER10–2720–010; ER10–2078–009; ER10–1995–007; ER10–1994–007; ER10–1993–008; ER10–1991–008; ER10–1990–008; ER10–1989–007; ER10–1986–008; ER10–1985–007; ER10–1984–008; ER10–1983–008; ER10–1976–007; ER10–1975–018; ER10–1974–017; ER10–1973–007; ER10–1972–008; ER10–1971–022; ER10–1970–008; ER10–1968–008; ER10–1967–008; ER10–1951–010. Applicants: Mantua Creek Solar, LLC, McCoy Solar, LLC, Meyersdale Storage, LLC, Meyersdale Windpower LLC, Mill Run Windpower, LLC, Minco Wind, LLC, Minco Wind II, LLC, Minco Wind III, LLC, Minco Wind Interconnection Services, LLC, Mountain View Solar, LLC, NEPM II, LLC, NextEra Energy Duane Arnold, LLC, NextEra Energy Montezuma II Wind, LLC, NextEra Energy Point Beach, LLC, NextEra Energy Power Marketing, LLC, NextEra Energy Seabrook, LLC, NextEra Energy Services Massachusetts, LLC, Northeast Energy Associates, A Limited Partnership, North Jersey Energy Associates, A Limited Partnership, North Sky River Energy, LLC, Northern Colorado Wind Energy, LLC, Osceola Windpower, LLC, Osceola Windpower II, LLC, Palo Duro Wind Energy, LLC, Palo Duro Wind Interconnection Services, LLC, Paradise Solar Urban Renewal, L.L.C., Peetz Table Wind Energy, LLC, Pennsylvania Windfarms, Inc., Perrin Ranch Wind, LLC, Pheasant Run Wind, LLC, Red Mesa Wind, LLC, Seiling Wind, LLC, Seiling Wind II, Dated: November 30, 2015. LLC, Seiling Wind Interconnection Nathaniel J. Davis, Sr., Services, LLC, Silver State Solar Power South, LLC, Shafter Solar, LLC, Sky Deputy Secretary. River LLC, Sky River Asset Holdings, [FR Doc. 2015–30709 Filed 12–4–15; 8:45 am] LLC, Somerset Windpower, LLC, Steele BILLING CODE 6717–01–P Flats Wind Project, LLC, Story Wind, LLC, Tuscola Bay Wind, LLC, Tuscola Wind II, LLC, Vasco Winds, LLC, DEPARTMENT OF ENERGY Waymart Wind Farm, L.P., Wessington Federal Energy Regulatory Wind Energy Center, LLC, White Oak Commission Energy LLC, Wilton Wind II, LLC, Windpower Partners 1993, LLC. Combined Notice of Filings #2 Description: Supplement to October 280, 2015 Notice of Change in Status of Take notice that the Commission the NextEra Energy Companies [Part 2 of received the following electric rate 2]. filings: Filed Date: 11/25/15. Docket Numbers: ER15–58–003; Accession Number: 20151125–5335. ER15–30–003; ER15–2602–001; ER15– Comments Due: 5 p.m. ET 12/16/15. 2243–001; ER15–2134–001; ER15–1375– Docket Numbers: ER15–2565–001. 001; ER15–1016–001; ER14–2710–005; Applicants: California Independent ER14–2709–005; ER14–2708–006; System Operator Corporation. ER14–21–004; ER14–1630–005; ER13– mstockstill on DSK4VPTVN1PROD with NOTICES the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on December 21, 2015. VerDate Sep<11>2014 18:36 Dec 04, 2015 Jkt 238001 PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 76013 Description: Compliance filing: 2015– 11–30 Compliance Filing-EIM Transition Period to be effective 11/1/ 2015. Filed Date: 11/30/15. Accession Number: 20151130–5248. Comments Due: 5 p.m. ET 12/21/15. Docket Numbers: ER16–424–000. Applicants: Dominion Energy Manchester Street, Inc. Description: Compliance filing: Compliance Filing—DEMS Removal of Affiliate Waiver to be effective 11/1/ 2015. Filed Date: 11/30/15. Accession Number: 20151130–5215. Comments Due: 5 p.m. ET 12/21/15. Docket Numbers: ER16–425–000. Applicants: New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: 205 filing tariff revision re: scarcity pricing to be effective 12/31/9998. Filed Date: 11/30/15. Accession Number: 20151130–5216. Comments Due: 5 p.m. ET 12/21/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 30, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–30706 Filed 12–4–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P–20–110] Pacificorp; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed E:\FR\FM\07DEN1.SGM 07DEN1 mstockstill on DSK4VPTVN1PROD with NOTICES 76014 Federal Register / Vol. 80, No. 234 / Monday, December 7, 2015 / Notices with the Commission and is available for public inspection. a. Application Type: Amendment of license. b. Project No.: 20–110. c. Date Filed: November 12, 2015. d. Applicant: PacifiCorp. e. Name of Project: Bear River Hydroelectric Project. f. Location: Bear River in Caribou and Franklin counties, Idaho. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Mark Stenberg, Managing Director, Hydro Resources, PacifiCorp, 825 NE Multnomah, Portland, Portland, OR 97232, mark.stenberg@pacificorp.com, 208–547–7305. i. FERC Contact: Anumzziatta Purchiaroni, (202) 502–6191, anumzziatta.purchiaroni@ferc.gov. j. Deadline for filing motions to intervene and protests: December 30, 2015. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–20–110. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The licensee is proposing to revise the project boundary to include land changes at the Soda, Grace, and Oneida developments. Changes to Soda Development include adding a gaging station and access road below the dam within the project boundary and adjusting the VerDate Sep<11>2014 18:36 Dec 04, 2015 Jkt 238001 project boundary to better fit shoreline buffers and conservation lands. Changes to Grace Development include minor revisions to the project boundary around the powerhouse to reflect the recently updated U.S. Bureau of Land Management (BLM) permit, identifying lands under the Federal Land Policy and Management Act of 1976, providing a more accurate description of project lands along the Grace flowline, adding conservation lands identified in the Grace/Last Chance Site plan, expanded the project boundary to the headwater to include all lands necessary for project operations, included two additional structures necessary for maintain the operating elevation of the reservoir, and identifying private lands under the reservoir. Changes to Oneida Development include adding an access road on BLM land, identifying two areas of private lands under the reservoir, correctly identifying lands owned by BLM or Bureau of Reclamation, and adding conservation lands managed under the revised Oneida Site Plan. l. Locations of the Application: A copy is also available for inspection and reproduction in the Commission’s Public Reference Room located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits in the docket number field (P–20) to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in PO 00000 Frm 00056 Fmt 4703 Sfmt 4703 accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. All comments, motions to intervene, or protests should relate to project boundary changes, which are the subject of the license amendment. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: November 30, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–30702 Filed 12–4–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER15–1196–003. Applicants: Nevada Power Company, Sierra Pacific Power Company. Description: Supplement to July 13, 2015 Compliance Filing of Nevada Power Company and Sierra Pacific Power Company. Filed Date: 11/30/15. Accession Number: 20151130–5460. Comments Due: 5 p.m. ET 12/21/15. Docket Numbers: ER15–2641–001. Applicants: ISO New England Inc. Description: Compliance filing: Notice of Effective Date for CTS, Compliance and Conforming Filing to be effective 12/15/2015. Filed Date: 12/1/15. Accession Number: 20151201–5105. Comments Due: 5 p.m. ET 12/22/15. Docket Numbers: ER16–426–000. E:\FR\FM\07DEN1.SGM 07DEN1

Agencies

[Federal Register Volume 80, Number 234 (Monday, December 7, 2015)]
[Notices]
[Pages 76013-76014]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-30702]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[P-20-110]


Pacificorp; Notice of Application Accepted for Filing and 
Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed

[[Page 76014]]

with the Commission and is available for public inspection.
    a. Application Type: Amendment of license.
    b. Project No.: 20-110.
    c. Date Filed: November 12, 2015.
    d. Applicant: PacifiCorp.
    e. Name of Project: Bear River Hydroelectric Project.
    f. Location: Bear River in Caribou and Franklin counties, Idaho.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Mr. Mark Stenberg, Managing Director, Hydro 
Resources, PacifiCorp, 825 NE Multnomah, Portland, Portland, OR 97232, 
mark.stenberg@pacificorp.com, 208-547-7305.
    i. FERC Contact: Anumzziatta Purchiaroni, (202) 502-6191, 
anumzziatta.purchiaroni@ferc.gov.
    j. Deadline for filing motions to intervene and protests: December 
30, 2015.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, or recommendations using the 
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-20-110.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: The licensee is proposing to revise the 
project boundary to include land changes at the Soda, Grace, and Oneida 
developments.
    Changes to Soda Development include adding a gaging station and 
access road below the dam within the project boundary and adjusting the 
project boundary to better fit shoreline buffers and conservation 
lands.
    Changes to Grace Development include minor revisions to the project 
boundary around the powerhouse to reflect the recently updated U.S. 
Bureau of Land Management (BLM) permit, identifying lands under the 
Federal Land Policy and Management Act of 1976, providing a more 
accurate description of project lands along the Grace flowline, adding 
conservation lands identified in the Grace/Last Chance Site plan, 
expanded the project boundary to the headwater to include all lands 
necessary for project operations, included two additional structures 
necessary for maintain the operating elevation of the reservoir, and 
identifying private lands under the reservoir.
    Changes to Oneida Development include adding an access road on BLM 
land, identifying two areas of private lands under the reservoir, 
correctly identifying lands owned by BLM or Bureau of Reclamation, and 
adding conservation lands managed under the revised Oneida Site Plan.
    l. Locations of the Application: A copy is also available for 
inspection and reproduction in the Commission's Public Reference Room 
located at 888 First Street NE., Room 2A, Washington, DC 20426, or by 
calling (202) 502-8371. This filing may also be viewed on the 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number excluding the last three digits in the docket 
number field (P-20) to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above. Agencies may obtain copies of the application directly from 
the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. All comments, motions to intervene, or protests 
should relate to project boundary changes, which are the subject of the 
license amendment. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: November 30, 2015.
Nathaniel J. Davis, Sr.,
 Deputy Secretary.
[FR Doc. 2015-30702 Filed 12-4-15; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.