Notice of Effectiveness of Exempt Wholesale Generator Status, 76004 [2015-30699]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
76004
Federal Register / Vol. 80, No. 234 / Monday, December 7, 2015 / Notices
the docket number field to access the
document. For assistance, please contact
FERC at FERCOnlineSupport@ferc.gov
or call toll-free, (886) 208–3676 or TYY,
(202) 502–8659.
Any questions regarding this
Application should be directed to
Daniel P. Werner, Delfin LNG LLC, 1100
Louisiana Street, Suite 3550, Houston,
Texas 77002; phone: 346–240–2574, or
J. Patrick Nevins, Hogan Lovells US
LLP, 555 Thirteenth Street NW.,
Washington, DC 20004; phone: 202–
637–6441.
Delfin LNG’s onshore facilities will
connect with the DWP facilities that are
subject to jurisdiction of the Maritime
Authority (MARAD) and the United
States Coast Guard (USCG).
Additionally, as part of Delfin LNG’s
DWP, Delfin LNG proposes to utilize a
segment of pipeline abandoned by High
Island Offshore System, LLC (HIOS) that
extends from the terminus of the UTOS
pipeline offshore. HIOS filed to abandon
certain pipeline facilities on November
19, 2015 in Docket No. CP16–20–000.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
VerDate Sep<11>2014
18:36 Dec 04, 2015
Jkt 238001
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and ill not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link.
Comment Date: December 22, 2015.
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
Dated: December 1, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30736 Filed 12–4–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
Willey Battery Utility,
LLC ...............................
Little Elk Wind Project,
LLC ...............................
Patriot Wind Farm, LLC ..
Chapman Ranch Wind I,
LLC ...............................
Silver State Solar Power
South, LLC ...................
RE Garland LLC ...............
RE Garland A LLC ...........
Latigo Wind Park, LLC ....
Parrey, LLC ......................
South Plains Wind Energy, LLC ......................
PHR Holdings LLC ..........
Golden West Power Partners, LLC ......................
EG15–108–000
EG15–109–000
EG15–110–000
EG15–111–000
EG15–112–000
EG15–113–000
EG15–114–000
EG15–116–000
EG15–117–000
EG15–118–000
EG15–119–000
EG15–120–000
Take notice that during the month of
October 2015, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a).
Dated: November 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30699 Filed 12–4–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Staff Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following meeting related to the
transmission planning activities of the
South Carolina Regional Planning
(SCRTP) Stakeholder Group.
South Carolina Regional Transmission
Planning Meeting, December 9, 2015
(10:00 a.m.–1:00 p.m.)
The above-referenced meeting will be
held at:
Hilton Garden Inn—Charleston Airport,
Cypress I Room, 5265 International
Blvd., North Charleston, SC 29418.
(843) 308–9330
The meeting is open to the public.
E:\FR\FM\07DEN1.SGM
07DEN1
Agencies
[Federal Register Volume 80, Number 234 (Monday, December 7, 2015)]
[Notices]
[Page 76004]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-30699]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator Status
Willey Battery Utility, LLC........................... EG15-108-000
Little Elk Wind Project, LLC.......................... EG15-109-000
Patriot Wind Farm, LLC................................ EG15-110-000
Chapman Ranch Wind I, LLC............................. EG15-111-000
Silver State Solar Power South, LLC................... EG15-112-000
RE Garland LLC........................................ EG15-113-000
RE Garland A LLC...................................... EG15-114-000
Latigo Wind Park, LLC................................. EG15-116-000
Parrey, LLC........................................... EG15-117-000
South Plains Wind Energy, LLC......................... EG15-118-000
PHR Holdings LLC...................................... EG15-119-000
Golden West Power Partners, LLC....................... EG15-120-000
Take notice that during the month of October 2015, the status of
the above-captioned entities as Exempt Wholesale Generators became
effective by operation of the Commission's regulations. 18 CFR
366.7(a).
Dated: November 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-30699 Filed 12-4-15; 8:45 am]
BILLING CODE 6717-01-P