Drawbridge Operation Regulation; English Kills, New York City, NY, 75636 [2015-30587]
Download as PDF
75636
Federal Register / Vol. 80, No. 232 / Thursday, December 3, 2015 / Rules and Regulations
9A004 Space Launch Vehicles and
‘‘Spacecraft,’’ ‘‘Spacecraft Buses,’’
‘‘Spacecraft Payloads,’’ ‘‘Spacecraft’’ Onboard Systems or Equipment, and Terrestrial
Equipment, as Follows (see List of Items
Controlled).
License Requirements
*
*
*
*
*
License Requirements Note: 9A004.b
through .f are controlled under ECCN 9A515.
*
*
*
*
*
List of Items Controlled
Related Controls*** (3) See USML
Categories IV for the space launch vehicles
and XV for other spacecraft that are ‘‘subject
to the ITAR’’ (see 22 CFR parts 120 through
130).
*
*
*
*
*
12. In Supplement No. 1 to part 774,
Category 9, ECCN 9A010 is amended by:
■ a. Revising the Heading; and
■ b. Adding a Related Controls Note to
the List of Items Controlled Section, to
read as follows:
■
9A010 ‘‘Specially Designed’’ ‘‘Parts,’’
‘‘Components,’’ Systems and Structures, for
Launch Vehicles, Launch Vehicle Propulsion
Systems or ‘‘Spacecraft’’. (See Related
Controls paragraph.)
List of Items Controlled
Related Controls: (1) See USML Category
IV of the International Traffic in Arms
Regulations (ITAR) (22 CFR parts 120
through 130) and ECCN 9A604 for
paragraphs 9A010.a, .b and .d. (2) See USML
Category XV of the ITAR and ECCN 9A515
for paragraph 9A010.c. (3) See Supplement
No. 4 to part 774, Order of Review for
guidance on the process for determining
classification of items.
*
*
*
*
*
Dated: November 23, 2015.
Kevin J. Wolf,
Assistant Secretary for Export
Administration.
[FR Doc. 2015–30253 Filed 12–2–15; 8:45 am]
BILLING CODE 3510–33–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2015–1019]
Lhorne on DSK5TPTVN1PROD with RULES
Drawbridge Operation Regulation;
English Kills, New York City, NY
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Metropolitan
SUMMARY:
VerDate Sep<11>2014
15:09 Dec 02, 2015
Jkt 238001
Avenue Bridge across the English Kills,
mile 3.4, at New York City, New York.
This deviation is necessary to perform
operating machinery installation. This
deviation allows the bridge to remain in
the closed position for approximately 3
days.
ENVIRONMENTAL PROTECTION
AGENCY
This deviation is effective from
6 a.m. on December 7, 2015 to 5 p.m.
on December 10, 2015.
Approval and Promulgation of
Implementation Plans; New Mexico;
Albuquerque-Bernalillo County;
Infrastructure and Interstate Transport
State Implementation Plan for the 2008
Lead National Ambient Air Quality
Standards
DATES:
The docket for this
deviation, [USCG–2015–1019] is
available at https://www.regulations.gov.
ADDRESSES:
If
you have questions on this temporary
deviation, call or email Ms. Judy K.
Leung-Yee, Project Officer, First Coast
Guard District, telephone (212) 514–
4330, email judy.k.leung-yee@uscg.mil.
40 CFR Part 52
[EPA–R06–OAR–2012–0400; FRL–9939–47–
Region 6]
Environmental Protection
Agency (EPA).
ACTION: Final rule.
FOR FURTHER INFORMATION CONTACT:
AGENCY:
New York
City DOT requested this temporary
deviation from the normal operating
schedule to perform operating
machinery installation.
The Metropolitan Avenue Bridge,
mile 3.4, across the English Kills has a
vertical clearance in the closed position
of 10 feet at mean high water and 15 feet
at mean low water. The existing bridge
operating regulations are found at 33
CFR 117.801(e).
The waterway has one commercial
facility located upstream of the bridge.
Under this temporary deviation, the
Metropolitan Avenue Bridge may
remain in the closed position from 6
a.m. on December 7, 2015 through 5
p.m. on December 10, 2015.
Vessels able to pass through the
bridge in the closed positions may do so
at any time. The bridge will not be able
to open for emergencies and there is no
immediate alternate route for vessel to
pass.
The Coast Guard will also inform the
users of the waterways through our
Local and Broadcast Notice to Mariners
of the change in operating schedule for
the bridge so that vessels can arrange
their transits to minimize any impact
caused by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
EPA is approving a State
Implementation Plan (SIP) submission
from the Governor of New Mexico for
the City of Albuquerque-Bernalillo
County for the 2008 Lead (Pb) National
Ambient Air Quality Standards
(NAAQS). The submittal addresses how
the existing SIP provides for
implementation, maintenance, and
enforcement of the 2008 Pb NAAQS
(infrastructure SIP or i-SIP). This i-SIP
ensures that the State’s SIP for
Albuquerque-Bernalillo County is
adequate to meet the state’s
responsibilities under the Federal Clean
Air Act (CAA or Act), including the four
CAA requirements for interstate
transport of Pb emissions.
DATES: This final rule is effective on
January 4, 2016.
ADDRESSES: EPA has established a
docket for this action under Docket ID
No. EPA–R06–OAR–2012–0400. All
documents in the docket are listed on
the https://www.regulations.gov Web
site. Although listed in the index, some
information is not publicly available,
e.g., Confidential Business Information
or other information whose disclosure is
restricted by statute. Certain other
material, such as copyrighted material,
is not placed on the Internet and will be
publicly available only in hard copy
form. Publicly available docket
materials are available either
electronically through https://
www.regulations.gov or in hard copy at
EPA Region 6, 1445 Ross Avenue, Suite
700, Dallas, Texas 75202–2733.
FOR FURTHER INFORMATION CONTACT:
Tracie Donaldson, 214–665–6633,
donaldson.tracie@epa.gov.
SUPPLEMENTARY INFORMATION:
Throughout this document wherever
‘‘we’’, ‘‘us’’, or ‘‘our’’ is used, we mean
the EPA.
SUPPLEMENTARY INFORMATION:
Dated: November 18, 2015.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2015–30587 Filed 12–2–15; 8:45 am]
BILLING CODE 9110–04–P
PO 00000
Frm 00006
Fmt 4700
Sfmt 4700
SUMMARY:
I. Background
The background for this action is
discussed in detail in our September 11,
E:\FR\FM\03DER1.SGM
03DER1
Agencies
[Federal Register Volume 80, Number 232 (Thursday, December 3, 2015)]
[Rules and Regulations]
[Page 75636]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-30587]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2015-1019]
Drawbridge Operation Regulation; English Kills, New York City, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Metropolitan Avenue Bridge across
the English Kills, mile 3.4, at New York City, New York. This deviation
is necessary to perform operating machinery installation. This
deviation allows the bridge to remain in the closed position for
approximately 3 days.
DATES: This deviation is effective from 6 a.m. on December 7, 2015 to 5
p.m. on December 10, 2015.
ADDRESSES: The docket for this deviation, [USCG-2015-1019] is available
at https://www.regulations.gov.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Ms. Judy K. Leung-Yee, Project
Officer, First Coast Guard District, telephone (212) 514-4330, email
judy.k.leung-yee@uscg.mil.
SUPPLEMENTARY INFORMATION: New York City DOT requested this temporary
deviation from the normal operating schedule to perform operating
machinery installation.
The Metropolitan Avenue Bridge, mile 3.4, across the English Kills
has a vertical clearance in the closed position of 10 feet at mean high
water and 15 feet at mean low water. The existing bridge operating
regulations are found at 33 CFR 117.801(e).
The waterway has one commercial facility located upstream of the
bridge.
Under this temporary deviation, the Metropolitan Avenue Bridge may
remain in the closed position from 6 a.m. on December 7, 2015 through 5
p.m. on December 10, 2015.
Vessels able to pass through the bridge in the closed positions may
do so at any time. The bridge will not be able to open for emergencies
and there is no immediate alternate route for vessel to pass.
The Coast Guard will also inform the users of the waterways through
our Local and Broadcast Notice to Mariners of the change in operating
schedule for the bridge so that vessels can arrange their transits to
minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: November 18, 2015.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2015-30587 Filed 12-2-15; 8:45 am]
BILLING CODE 9110-04-P