Combined Notice Of Filings #2, 75093-75094 [2015-30424]
Download as PDF
Federal Register / Vol. 80, No. 230 / Tuesday, December 1, 2015 / Notices
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 23, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30425 Filed 11–30–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14673–000]
tkelley on DSK3SPTVN1PROD with NOTICES
Lock Hydro Friends Fund III; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 30, 2015, Lock Hydro
Friends Fund III, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of a hydropower project to be located at
the U.S. Army Corps of Engineers’
(Corps) Coffeeville Lock and Dam on the
Tombigbee River near the town of
Coffeeville in Clark and Choctaw
Counties, Alabama. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A 150-foot-long, 25foot-wide lock frame module containing
twelve generating units with a total
capacity of 27 megawatts; (2) a 150-footlong; 65-foot-wide tailrace; (3) a 50-footlong, 25-foot-wide switchyard; and (4) a
1-mile-long, 34.5kV transmission line.
The proposed project would have an
estimated average annual generation of
153,738 megawatt-hours, and operate as
directed by the Corps.
Applicant Contact: Mr. Wayne F.
Krouse, Hydro Green Energy, LLC, P.O.
Box 43796, Birmingham, AL 35243;
Phone: (877) 556–6566; Email: wayne@
hgenergy.com.
VerDate Sep<11>2014
23:35 Nov 30, 2015
Jkt 238001
FERC Contact: Christiane Casey,
christiane.casey@ferc.gov, (202) 502–
8577.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–14673–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14673) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: November 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30401 Filed 11–30–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice Of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–527–003.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Compliance Filing per 9/24/15 Order in
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
75093
Docket No. ER15–527 to be effective 5/
15/2015.
Filed Date: 11/23/15.
Accession Number: 20151123–5190.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16–95–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2015–11–23_SA 2834 Amended ATC–
NSPW Design and Construction
Agreement to be effective 12/15/2015.
Filed Date: 11/23/15.
Accession Number: 20151123–5151.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16–128–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2015–11–23_SA 2855 Amended ATCManitowoc Relocation Agreement to be
effective 12/20/2015.
Filed Date: 11/23/15.
Accession Number: 20151123–5160.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16–375–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
3740, Queue No. X1–110 to be effective
11/23/2015.
Filed Date: 11/23/15.
Accession Number: 20151123–5113.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16–376–000.
Applicants: West Chicago Battery
Storage LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 1/23/2016.
Filed Date: 11/23/15.
Accession Number: 20151123–5116.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16–377–000.
Applicants: Joliet Battery Storage LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 1/23/2016.
Filed Date: 11/23/15.
Accession Number: 20151123–5119.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16–378–000.
Applicants: NorthWestern
Corporation.
Description: Compliance filing:
Revised Market-Based Rate Tariff to be
effective 10/1/2015.
Filed Date: 11/23/15.
Accession Number: 20151123–5148.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16–379–000.
Applicants: Battery Utility of Ohio,
LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 1/23/2016.
E:\FR\FM\01DEN1.SGM
01DEN1
75094
Federal Register / Vol. 80, No. 230 / Tuesday, December 1, 2015 / Notices
Filed Date: 11/23/15.
Accession Number: 20151123–5180.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16–380–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
290 Sixth Rev—NITSA with Oldcastle
Materials Cement Holdings to be
effective 1/1/2016.
Filed Date: 11/23/15.
Accession Number: 20151123–5197.
Comments Due: 5 p.m. ET 12/14/15.
Take notice that the Commission
received the following electric
reliability filings
Docket Numbers: RD16–2–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition of the North
American Electric Reliability
Corporation for Approval of Proposed
Reliability Standard PRC–005–6.
Filed Date: 11/13/15.
Accession Number: 20151113–5283.
Comments Due: 5 p.m. ET 12/8/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 23, 2015
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30424 Filed 11–30–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
tkelley on DSK3SPTVN1PROD with NOTICES
[Docket No. ER16–368–000]
Shelby County Energy Center, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding Shelby
VerDate Sep<11>2014
23:35 Nov 30, 2015
Jkt 238001
County Energy Center, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is December 14,
2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: November 23, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30429 Filed 11–30–15; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–4–000]
Tennessee Gas Pipeline Company,
L.L.C.; Notice Of Intent To Prepare An
Environmental Assessment For The
Proposed Orion Project And Request
For Comments On Environmental
Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Orion Project involving construction
and operation of facilities by Tennessee
Gas Pipeline Company, L.L.C. (TGP) in
Wayne and Pike Counties,
Pennsylvania. The Commission will use
this EA in its decision-making process
to determine whether the project is in
the public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
You can make a difference by providing
us with your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. To ensure that your
comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before December
23, 2015.
If you sent comments on this project
to the Commission before the opening of
this docket on October 9, 2015, you will
need to file those comments in Docket
No. CP16–4–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
E:\FR\FM\01DEN1.SGM
01DEN1
Agencies
[Federal Register Volume 80, Number 230 (Tuesday, December 1, 2015)]
[Notices]
[Pages 75093-75094]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-30424]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice Of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER15-527-003.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing: Compliance Filing per 9/24/15 Order
in Docket No. ER15-527 to be effective 5/15/2015.
Filed Date: 11/23/15.
Accession Number: 20151123-5190.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16-95-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2015-11-23_SA 2834 Amended ATC-NSPW
Design and Construction Agreement to be effective 12/15/2015.
Filed Date: 11/23/15.
Accession Number: 20151123-5151.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16-128-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2015-11-23_SA 2855 Amended ATC-
Manitowoc Relocation Agreement to be effective 12/20/2015.
Filed Date: 11/23/15.
Accession Number: 20151123-5160.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16-375-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of WMPA SA
No. 3740, Queue No. X1-110 to be effective 11/23/2015.
Filed Date: 11/23/15.
Accession Number: 20151123-5113.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16-376-000.
Applicants: West Chicago Battery Storage LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff to be effective 1/23/2016.
Filed Date: 11/23/15.
Accession Number: 20151123-5116.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16-377-000.
Applicants: Joliet Battery Storage LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff to be effective 1/23/2016.
Filed Date: 11/23/15.
Accession Number: 20151123-5119.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16-378-000.
Applicants: NorthWestern Corporation.
Description: Compliance filing: Revised Market-Based Rate Tariff to
be effective 10/1/2015.
Filed Date: 11/23/15.
Accession Number: 20151123-5148.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16-379-000.
Applicants: Battery Utility of Ohio, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff to be effective 1/23/2016.
[[Page 75094]]
Filed Date: 11/23/15.
Accession Number: 20151123-5180.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16-380-000.
Applicants: NorthWestern Corporation.
Description: Sec. 205(d) Rate Filing: SA 290 Sixth Rev--NITSA with
Oldcastle Materials Cement Holdings to be effective 1/1/2016.
Filed Date: 11/23/15.
Accession Number: 20151123-5197.
Comments Due: 5 p.m. ET 12/14/15.
Take notice that the Commission received the following electric
reliability filings
Docket Numbers: RD16-2-000.
Applicants: North American Electric Reliability Corporation.
Description: Petition of the North American Electric Reliability
Corporation for Approval of Proposed Reliability Standard PRC-005-6.
Filed Date: 11/13/15.
Accession Number: 20151113-5283.
Comments Due: 5 p.m. ET 12/8/15.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: November 23, 2015
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-30424 Filed 11-30-15; 8:45 am]
BILLING CODE 6717-01-P