Energy Resources USA Inc., Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene, 75081 [2015-30403]

Download as PDF Federal Register / Vol. 80, No. 230 / Tuesday, December 1, 2015 / Notices 2016.1 The project would have been located on the Quinebaug River in the town of Southbridge, Worcester County, Massachusetts. The preliminary permit for Project No. 14518 will remain in effect until the close of business, December 18, 2015. But, if the Commission is closed on this day, then the permit remains in effect until the close of business on the next day in which the Commission is open.2 New applications for this site may not be submitted until after the permit surrender is effective. Dated: November 18, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–30394 Filed 11–30–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14689–000] tkelley on DSK3SPTVN1PROD with NOTICES Energy Resources USA Inc., Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On June 26, 2015, Arkansas Electric Cooperative Corporation, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project to be located at the U.S. Army Corps of Engineers’ (Corps) Col. Charles D. Maynard Lock and Dam on the Arkansas River near the town of Pine Bluff in Jefferson County, Arkansas. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 100-foot-long overflow bank extension connecting to the existing dam; (2) a 770-foot-long, 300-foot-wide intake channel with a 85foot-long retaining wall; (3) a 220-footlong, 90-foot-wide powerhouse containing four generating units with a total capacity of 18 megawatts; (4) a 1000-foot-long, 220-foot-wide tailrace with a 85-foot-long retaining wall; (5) a 4.16/69 kilo-Volt (kV) substation; and (6) a 3-mile-long, 69 kV transmission line. The proposed project would have an estimated average annual generation of 123,700 megawatt-hours, and operate as directed by the Corps. Applicant Contact: Mr. Ander Gonzalez, Energy Resources USA Inc., 2655 Le Jeune Road, Suite 804, Coral Gables, Florida 33134; Phone: +34 93 252 38 40; Email: agonzalez@ energyresources.es FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202) 502– 8577. Competing Application: This application competes with Project No. 14665–000 filed March 3, 2015. Competing applications had to be filed on or before July 20, 2015. Deadline for filing comments and motions to intervene: 60 days from the issuance of this notice. Comments and motions to intervene may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc. gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14689) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: November 24, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–30403 Filed 11–30–15; 8:45 am] BILLING CODE 6717–01–P 1 144 2 18 FERC ¶ 62,066 (2013). CFR 385.2007(a)(2) (2015). VerDate Sep<11>2014 23:35 Nov 30, 2015 Jkt 238001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 75081 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14672–000] Lock Hydro Friends Fund III; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 30, 2015, Lock Hydro Friends Fund III, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project to be located at the U.S. Army Corps of Engineers’ (Corps) Selden Lock and Dam on the Black Warrior River near the town of Sawyerville in Green and Hale Counties, Alabama. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 150-foot-long, 25foot-wide lock frame module containing ten generating units with a total capacity of 15 megawatts; (2) a 150-footlong; 65-foot-wide tailrace; (3) a 50-footlong, 25-foot-wide switchyard; and (4) a 2.3-mile-long, 34.5kV transmission line. The proposed project would have an estimated average annual generation of 78,840 megawatt-hours, and operate as directed by the Corps. Applicant Contact: Mr. Wayne F. Krouse, Hydro Green Energy, LLC, P.O. Box 43796, Birmingham, AL 35243; Phone: (877) 556–6566; Email: wayne@ hgenergy.com. FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202) 502– 8577. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the E:\FR\FM\01DEN1.SGM 01DEN1

Agencies

[Federal Register Volume 80, Number 230 (Tuesday, December 1, 2015)]
[Notices]
[Page 75081]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-30403]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14689-000]


Energy Resources USA Inc., Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments and Motions To 
Intervene

    On June 26, 2015, Arkansas Electric Cooperative Corporation, filed 
an application for a preliminary permit, pursuant to section 4(f) of 
the Federal Power Act (FPA), proposing to study the feasibility of a 
hydropower project to be located at the U.S. Army Corps of Engineers' 
(Corps) Col. Charles D. Maynard Lock and Dam on the Arkansas River near 
the town of Pine Bluff in Jefferson County, Arkansas. The sole purpose 
of a preliminary permit, if issued, is to grant the permit holder 
priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed project would consist of the following: (1) A 100-
foot-long overflow bank extension connecting to the existing dam; (2) a 
770-foot-long, 300-foot-wide intake channel with a 85-foot-long 
retaining wall; (3) a 220-foot-long, 90-foot-wide powerhouse containing 
four generating units with a total capacity of 18 megawatts; (4) a 
1000-foot-long, 220-foot-wide tailrace with a 85-foot-long retaining 
wall; (5) a 4.16/69 kilo-Volt (kV) substation; and (6) a 3-mile-long, 
69 kV transmission line. The proposed project would have an estimated 
average annual generation of 123,700 megawatt-hours, and operate as 
directed by the Corps.
    Applicant Contact: Mr. Ander Gonzalez, Energy Resources USA Inc., 
2655 Le Jeune Road, Suite 804, Coral Gables, Florida 33134; Phone: +34 
93 252 38 40; Email: agonzalez@energyresources.es
    FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202) 
502-8577.
    Competing Application: This application competes with Project No. 
14665-000 filed March 3, 2015. Competing applications had to be filed 
on or before July 20, 2015.
    Deadline for filing comments and motions to intervene: 60 days from 
the issuance of this notice. Comments and motions to intervene may be 
filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) 
and the instructions on the Commission's Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 
6,000 characters, without prior registration, using the eComment system 
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, 
(202) 502-8659. Although the Commission strongly encourages electronic 
filing, documents may also be paper-filed. To paper-file, mail an 
original and five copies to: Kimberly D. Bose, Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14689) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: November 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-30403 Filed 11-30-15; 8:45 am]