Lock Hydro Friends Fund III; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 75093 [2015-30401]
Download as PDF
Federal Register / Vol. 80, No. 230 / Tuesday, December 1, 2015 / Notices
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 23, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30425 Filed 11–30–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14673–000]
tkelley on DSK3SPTVN1PROD with NOTICES
Lock Hydro Friends Fund III; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 30, 2015, Lock Hydro
Friends Fund III, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of a hydropower project to be located at
the U.S. Army Corps of Engineers’
(Corps) Coffeeville Lock and Dam on the
Tombigbee River near the town of
Coffeeville in Clark and Choctaw
Counties, Alabama. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A 150-foot-long, 25foot-wide lock frame module containing
twelve generating units with a total
capacity of 27 megawatts; (2) a 150-footlong; 65-foot-wide tailrace; (3) a 50-footlong, 25-foot-wide switchyard; and (4) a
1-mile-long, 34.5kV transmission line.
The proposed project would have an
estimated average annual generation of
153,738 megawatt-hours, and operate as
directed by the Corps.
Applicant Contact: Mr. Wayne F.
Krouse, Hydro Green Energy, LLC, P.O.
Box 43796, Birmingham, AL 35243;
Phone: (877) 556–6566; Email: wayne@
hgenergy.com.
VerDate Sep<11>2014
23:35 Nov 30, 2015
Jkt 238001
FERC Contact: Christiane Casey,
christiane.casey@ferc.gov, (202) 502–
8577.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–14673–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14673) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: November 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–30401 Filed 11–30–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice Of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–527–003.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Compliance Filing per 9/24/15 Order in
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
75093
Docket No. ER15–527 to be effective 5/
15/2015.
Filed Date: 11/23/15.
Accession Number: 20151123–5190.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16–95–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2015–11–23_SA 2834 Amended ATC–
NSPW Design and Construction
Agreement to be effective 12/15/2015.
Filed Date: 11/23/15.
Accession Number: 20151123–5151.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16–128–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2015–11–23_SA 2855 Amended ATCManitowoc Relocation Agreement to be
effective 12/20/2015.
Filed Date: 11/23/15.
Accession Number: 20151123–5160.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16–375–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
3740, Queue No. X1–110 to be effective
11/23/2015.
Filed Date: 11/23/15.
Accession Number: 20151123–5113.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16–376–000.
Applicants: West Chicago Battery
Storage LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 1/23/2016.
Filed Date: 11/23/15.
Accession Number: 20151123–5116.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16–377–000.
Applicants: Joliet Battery Storage LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 1/23/2016.
Filed Date: 11/23/15.
Accession Number: 20151123–5119.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16–378–000.
Applicants: NorthWestern
Corporation.
Description: Compliance filing:
Revised Market-Based Rate Tariff to be
effective 10/1/2015.
Filed Date: 11/23/15.
Accession Number: 20151123–5148.
Comments Due: 5 p.m. ET 12/14/15.
Docket Numbers: ER16–379–000.
Applicants: Battery Utility of Ohio,
LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 1/23/2016.
E:\FR\FM\01DEN1.SGM
01DEN1
Agencies
[Federal Register Volume 80, Number 230 (Tuesday, December 1, 2015)]
[Notices]
[Page 75093]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-30401]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14673-000]
Lock Hydro Friends Fund III; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 30, 2015, Lock Hydro Friends Fund III, filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of a
hydropower project to be located at the U.S. Army Corps of Engineers'
(Corps) Coffeeville Lock and Dam on the Tombigbee River near the town
of Coffeeville in Clark and Choctaw Counties, Alabama. The sole purpose
of a preliminary permit, if issued, is to grant the permit holder
priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of the following: (1) A 150-
foot-long, 25-foot-wide lock frame module containing twelve generating
units with a total capacity of 27 megawatts; (2) a 150-foot-long; 65-
foot-wide tailrace; (3) a 50-foot-long, 25-foot-wide switchyard; and
(4) a 1-mile-long, 34.5kV transmission line. The proposed project would
have an estimated average annual generation of 153,738 megawatt-hours,
and operate as directed by the Corps.
Applicant Contact: Mr. Wayne F. Krouse, Hydro Green Energy, LLC,
P.O. Box 43796, Birmingham, AL 35243; Phone: (877) 556-6566; Email:
wayne@hgenergy.com.
FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202)
502-8577.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and five copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426. The first page of any filing should include docket number P-
14673-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14673) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: November 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-30401 Filed 11-30-15; 8:45 am]
BILLING CODE 6717-01-P