PJM Interconnection, L.L.C.; PJM Interconnection, L.L.C.; Potomac Electric Power Company; Notice Inviting Post-Technical Conference Comments, 73752-73753 [2015-29966]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
73752
Federal Register / Vol. 80, No. 227 / Wednesday, November 25, 2015 / Notices
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
VerDate Sep<11>2014
19:15 Nov 24, 2015
Jkt 238001
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: November 19, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–29969 Filed 11–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER15–1344–001, ER15–1344–
002, ER15–1387–001]
PJM Interconnection, L.L.C.; PJM
Interconnection, L.L.C.; Potomac
Electric Power Company; Notice
Inviting Post-Technical Conference
Comments
On November 12, 2015, Federal
Energy Regulatory Commission
(Commission) staff conducted a
technical conference to understand PJM
Interconnection, L.L.C’s (PJM)
application of its Order No. 1000compliant 1 transmission planning
process to local transmission facilities
in PJM’s Regional Transmission
Expansion Plan (RTEP). All interested
persons are invited to file post-technical
conference comments on the topics
discussed during the technical
conference, including:
• The process for planning for
individual Transmission Owner FERCfiled planning criteria in Form No.
715; 2
• the process and method PJM uses to
track criteria 3 violations that drive each
transmission project identified in the
Subregional Local Plans and RTEP;
• the difference, if any, between local
transmission maintenance and local
transmission planning;
1 Transmission Planning and Cost Allocation by
Transmission Owning and Operating Public
Utilities, Order No. 1000, FERC Stats. & Regs. ¶
31,323 (2011), order on reh’g, Order No. 1000–A,
139 FERC ¶ 61,132, order on reh’g, Order No. 1000–
B, 141 FERC ¶ 61,044 (2012), aff’d sub nom. S.C.
Pub. Serv. Auth. v. FERC, 762 F.3d 41 (D.C. Cir.
2014).
2 See PJM, Intra-PJM Tariffs, Operating
Agreement, Schedule 6 § 1.2 (e) (Conformity with
NERC Reliability Standards and Other Applicable
Reliability Criteria).
3 The criteria PJM uses in its regional
transmission planning process include PJM
planning procedures, North American Electric
Reliability Corporation Reliability Standards,
Regional Entity reliability principles and standards,
and the individual Transmission Owner planning
criteria as filed in FERC Form No. 715, and as
posted on the PJM Web site. See PJM, Intra-PJM
Tariffs, Operating Agreement, Schedule 6, § 1.2(e).
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
• which categories of transmission
projects included in the RTEP are
considered to be selected in the regional
transmission plan for purposes of cost
allocation;
• the process for reclassifying
Supplemental Projects as Regional
Projects or Subregional Projects selected
in the RTEP for purposes of cost
allocation, including requirements to
open proposal windows for these
projects;
• whether, pursuant to section 1.5.8
of its Operating Agreement, PJM should
have opened a proposal window for
baseline project b2582 under its current
tariff and whether other factors justify
the manner in which the project was
planned; and
• how the transmission planning
process used by each PJM transmission
owner for Supplemental Projects
complies with Order No. 890,4
specifically with respect to the
coordination, openness, transparency,
information exchange, comparability,
and dispute resolution transmission
planning principles as described by the
Commission and where these processes
are set forth in FERC-filed documents.
Commenters need not address every
question and may provide comments on
relevant issues other than those listed
above. These comments are due no later
than 5:00 p.m. Eastern Standard Time
(EST) on Thursday, December 10, 2015.
Reply comments are due on or before
5:00 p.m. EST January 7, 2016. The
written comments will be included in
the formal record of the proceeding,
which, together with the record
developed to date, will form the basis
for further Commission action.
For more information about this
Notice, please contact:
Nicole Buell, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426, (202) 502–
6846, nicole.buell@ferc.gov.
Katherine Scott, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426, (202) 502–
6495, katherine.scott@ferc.gov.
Ron LeComte, Office of the General
Counsel, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426, (202) 502–
8405, ron.lecomte@ferc.gov.
4 Preventing Undue Discrimination and
Preference in Transmission Service, Order No. 890,
FERC Stats. & Regs. ¶ 31,241, order on reh’g, Order
No. 890–A, FERC Stats. & Regs. ¶ 31,261 (2007),
order on reh’g, Order No. 890–B, 123 FERC ¶ 61,299
(2008), order on reh’g, Order No. 890–C, 126 FERC
¶ 61,228 (2009), order on clarification, Order No.
890–D, 129 FERC ¶ 61,126 (2009).
E:\FR\FM\25NON1.SGM
25NON1
Federal Register / Vol. 80, No. 227 / Wednesday, November 25, 2015 / Notices
Dated: November 19, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–29966 Filed 11–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
tkelley on DSK3SPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC16–35–000.
Applicants: Solar Star Colorado III,
LLC.
Description: Application for
Authorization Pursuant to FPA Section
203(a)(1)(A) and Requests for Expedited
Action and Waivers of Certain Filing
Requirements of Solar Star Colorado III,
LLC.
Filed Date: 11/19/15.
Accession Number: 20151119–5079.
Comments Due: 5 p.m. ET 12/10/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–162–014;
ER11–3876–017; ER11–2044–017;
ER15–2211–004; ER10–2611–015.
Applicants: Bishop Hill Energy II
LLC, Cordova Energy Company LLC,
MidAmerican Energy Company,
MidAmerican Energy Services, LLC,
Saranac Power Partners, L.P.
Description: Notice of Change in
Status of the Berkshire Hathaway
Eastern Parties.
Filed Date: 11/19/15.
Accession Number: 20151119–5074.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER13–75–010.
Applicants: Public Service Company
of Colorado.
Description: Compliance filing: 2015–
11–19_PSCo Order 1000 Comp filing to
be effective 1/1/2015.
Filed Date: 11/19/15.
Accession Number: 20151119–5073.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER13–79–008.
Applicants: Public Service Company
of New Mexico.
Description: Compliance filing: Order
No. 1000 OATT Fifth Regional
Compliance Filing to be effective 1/1/
2015.
Filed Date: 11/19/15.
Accession Number: 20151119–5067.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER13–82–008.
Applicants: Arizona Public Service
Company.
VerDate Sep<11>2014
19:15 Nov 24, 2015
Jkt 238001
Description: Compliance filing: Order
No. 1000 Compliance to be effective 1/
1/2015.
Filed Date: 11/19/15.
Accession Number: 20151119–5088.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER13–91–007.
Applicants: El Paso Electric Company.
Description: Compliance filing: OATT
Order No. 1000 Compliance Filing to
Comply with October 20, 2015 Order to
be effective 1/1/2015.
Filed Date: 11/19/15.
Accession Number: 20151119–5055.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER15–411–004.
Applicants: Arizona Public Service
Company.
Description: Compliance filing: Rate
Schedule No. 274—Planning
Participation Agreement to be effective
1/1/2015.
Filed Date: 11/19/15.
Accession Number: 20151119–5124.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER16–91–000.
Applicants: Blythe Solar 110, LLC.
Description: Amendment to October
15, 2015 Blythe Solar 110, LLC tariff
filing.
Filed Date: 11/18/15.
Accession Number: 20151118–5200.
Comments Due: 5 p.m. ET 11/30/15.
Docket Numbers: ER16–354–000.
Applicants: Southern California
Edison Company.
Description: Tariff Cancellation:
Notices of Cancellation GIA and
Distribution Service Agmt Chester
Adams to be effective 10/21/2015.
Filed Date: 11/19/15.
Accession Number: 20151119–5002.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER16–355–000.
Applicants: Colonial Eagle Solar, LLC.
Description: Baseline eTariff Filing:
MBR Application and Tariff to be
effective 11/20/2015.
Filed Date: 11/19/15.
Accession Number: 20151119–5035.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER16–356–000.
Applicants: The Connecticut Light
and Power Company.
Description: Tariff Cancellation:
Cancellation of CPV Towantic LLC
Engineering Design Permitting Siting
Agreement to be effective 4/13/2015.
Filed Date: 11/19/15.
Accession Number: 20151119–5045.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER16–357–000.
Applicants: Public Service Company
of New Hampshire.
Description: Tariff Cancellation:
Cancellation of Design and Engineering
Agreement for New Hampshire Electric
Coop to be effective 6/1/2015.
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
73753
Filed Date: 11/19/15.
Accession Number: 20151119–5054.
Comments Due: 5 p.m. ET 12/10/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 19, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–29962 Filed 11–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–2159–005;
ER10–2609–011; ER10–2606–011;ER10–
2602–012.
Applicants: Verso Maine Energy LLC,
NewPage Energy Services LLC,
Escanaba Paper Company, Consolidated
Water Power Company.
Description: Supplement to June 30,
2015 Updated Market Power Analysis
for the Central Region of Verso MBR
Entities.
Filed Date: 11/17/15.
Accession Number: 20151117–5169.
Comments Due: 5 p.m. ET 11/27/15.
Docket Numbers: ER14–1153–002;
ER11–2159–004; ER10–2609–010;
ER10–2606–010; ER10–2604–008;
ER10–2602–011; ER10–2543–003.
Applicants: Verso Androscoggin LLC,
Verso Androscoggin Power LLC, Verso
Maine Energy LLC, Luke Paper
Company, New Page Energy Services,
Inc., Consolidated Water Power
Company, Escanaba Paper Company.
Description: Second Supplement to
February 6, 2015 Notice of Non-Material
E:\FR\FM\25NON1.SGM
25NON1
Agencies
[Federal Register Volume 80, Number 227 (Wednesday, November 25, 2015)]
[Notices]
[Pages 73752-73753]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-29966]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER15-1344-001, ER15-1344-002, ER15-1387-001]
PJM Interconnection, L.L.C.; PJM Interconnection, L.L.C.; Potomac
Electric Power Company; Notice Inviting Post-Technical Conference
Comments
On November 12, 2015, Federal Energy Regulatory Commission
(Commission) staff conducted a technical conference to understand PJM
Interconnection, L.L.C's (PJM) application of its Order No. 1000-
compliant \1\ transmission planning process to local transmission
facilities in PJM's Regional Transmission Expansion Plan (RTEP). All
interested persons are invited to file post-technical conference
comments on the topics discussed during the technical conference,
including:
---------------------------------------------------------------------------
\1\ Transmission Planning and Cost Allocation by Transmission
Owning and Operating Public Utilities, Order No. 1000, FERC Stats. &
Regs. ] 31,323 (2011), order on reh'g, Order No. 1000-A, 139 FERC ]
61,132, order on reh'g, Order No. 1000-B, 141 FERC ] 61,044 (2012),
aff'd sub nom. S.C. Pub. Serv. Auth. v. FERC, 762 F.3d 41 (D.C. Cir.
2014).
---------------------------------------------------------------------------
The process for planning for individual Transmission Owner
FERC-filed planning criteria in Form No. 715; \2\
---------------------------------------------------------------------------
\2\ See PJM, Intra-PJM Tariffs, Operating Agreement, Schedule 6
Sec. 1.2 (e) (Conformity with NERC Reliability Standards and Other
Applicable Reliability Criteria).
---------------------------------------------------------------------------
the process and method PJM uses to track criteria \3\
violations that drive each transmission project identified in the
Subregional Local Plans and RTEP;
---------------------------------------------------------------------------
\3\ The criteria PJM uses in its regional transmission planning
process include PJM planning procedures, North American Electric
Reliability Corporation Reliability Standards, Regional Entity
reliability principles and standards, and the individual
Transmission Owner planning criteria as filed in FERC Form No. 715,
and as posted on the PJM Web site. See PJM, Intra-PJM Tariffs,
Operating Agreement, Schedule 6, Sec. 1.2(e).
---------------------------------------------------------------------------
the difference, if any, between local transmission
maintenance and local transmission planning;
which categories of transmission projects included in the
RTEP are considered to be selected in the regional transmission plan
for purposes of cost allocation;
the process for reclassifying Supplemental Projects as
Regional Projects or Subregional Projects selected in the RTEP for
purposes of cost allocation, including requirements to open proposal
windows for these projects;
whether, pursuant to section 1.5.8 of its Operating
Agreement, PJM should have opened a proposal window for baseline
project b2582 under its current tariff and whether other factors
justify the manner in which the project was planned; and
how the transmission planning process used by each PJM
transmission owner for Supplemental Projects complies with Order No.
890,\4\ specifically with respect to the coordination, openness,
transparency, information exchange, comparability, and dispute
resolution transmission planning principles as described by the
Commission and where these processes are set forth in FERC-filed
documents.
---------------------------------------------------------------------------
\4\ Preventing Undue Discrimination and Preference in
Transmission Service, Order No. 890, FERC Stats. & Regs. ] 31,241,
order on reh'g, Order No. 890-A, FERC Stats. & Regs. ] 31,261
(2007), order on reh'g, Order No. 890-B, 123 FERC ] 61,299 (2008),
order on reh'g, Order No. 890-C, 126 FERC ] 61,228 (2009), order on
clarification, Order No. 890-D, 129 FERC ] 61,126 (2009).
---------------------------------------------------------------------------
Commenters need not address every question and may provide comments
on relevant issues other than those listed above. These comments are
due no later than 5:00 p.m. Eastern Standard Time (EST) on Thursday,
December 10, 2015. Reply comments are due on or before 5:00 p.m. EST
January 7, 2016. The written comments will be included in the formal
record of the proceeding, which, together with the record developed to
date, will form the basis for further Commission action.
For more information about this Notice, please contact:
Nicole Buell, Office of Energy Market Regulation, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426,
(202) 502-6846, nicole.buell@ferc.gov.
Katherine Scott, Office of Energy Market Regulation, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426,
(202) 502-6495, katherine.scott@ferc.gov.
Ron LeComte, Office of the General Counsel, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426, (202) 502-8405,
ron.lecomte@ferc.gov.
[[Page 73753]]
Dated: November 19, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-29966 Filed 11-24-15; 8:45 am]
BILLING CODE 6717-01-P