Combined Notice of Filings #3, 73749-73750 [2015-29963]
Download as PDF
Federal Register / Vol. 80, No. 227 / Wednesday, November 25, 2015 / Notices
environment from construction and
operation.
• Socioeconomics—Effects on
Environmental Justice communities.
• Reliability and Safety—Hazards
associated with natural gas pipelines
and aboveground facilities.
• Alternatives—Evaluation of other
locations for the new Weymouth
Compressor Station.
tkelley on DSK3SPTVN1PROD with NOTICES
Environmental Mailing List
The environmental mailing list
includes: Federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. We encourage
government representatives who receive
this notice to notify their constituents
about this proposed Project and
encourage them to comment on their
areas of concern. This list also includes
the affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
Project purposes, or who own homes
within certain distances of aboveground
facilities and proposed workspaces, and
anyone who submits comments on the
Project.
We will update the environmental
mailing list as the analysis proceeds to
ensure that we send the information
related to this environmental review to
individuals, organizations, and
government entities interested in and/or
potentially affected by the Project.
When we publish and distribute the
EA, copies will be sent to the
environmental mailing list for public
review and comment. If you would
prefer to receive a paper copy of the
document instead of the CD version or
would like to remove your name from
the mailing list, please return the
attached Information Request
(Appendix 3).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, now that the
Applicants have filed their application
with the Commission, you may want to
become an ‘‘intervenor,’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
VerDate Sep<11>2014
19:15 Nov 24, 2015
Jkt 238001
Web site. As indicated in the Notice of
Application for the Project issued on
November 5, 2015, the deadline for
motions to intervene in accordance with
the requirements of the Commission’s
Rules of Practice and Procedures (18
CFR 385.214 or 385.211) and the
Regulations under the Natural Gas Act
(18 CFR 157.10) close on November 27,
2015. However, those individuals who
were not previously noticed in this
proceeding may request to intervene out
of time, in accordance with 18 CFR
385.214(d).
Additional Information
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search’’ and enter the docket
number, excluding the last three digits
in the Docket Number field (i.e., CP16–
9). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/
esubscribenow.htm.
Any public meetings or site visits that
are conducted by our staff will be
posted on the Commission’s calendar
located at www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
November 19, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–29965 Filed 11–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #3
Take notice that the Commission
received the following electric rate
filings:
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
73749
Docket Numbers: ER13–77–008.
Applicants: Tucson Electric Power
Company.
Description: Compliance filing: OATT
Order No. 1000 Compliance Filing to be
effective 1/1/2015.
Filed Date: 11/19/15.
Accession Number: 20151119–5186.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER13–78–008.
Applicants: UNS Electric, Inc.
Description: Compliance filing: OATT
Order No. 1000 Compliance Filing to be
effective 1/1/2015.
Filed Date: 11/19/15.
Accession Number: 20151119–5207.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER13–96–007.
Applicants: Black Hills Power, Inc.
Description: Compliance filing: Order
No. 1000 OATT Regional Compliance
Filing to be effective 1/1/2015.
Filed Date: 11/19/15.
Accession Number: 20151119–5203.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER13–97–007.
Applicants: Black Hills/Colorado
Electric Utility Co.
Description: Compliance filing: Order
No. 1000 OATT Regional Compliance
Filing to be effective 1/1/2015.
Filed Date: 11/19/15.
Accession Number: 20151119–5204.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER13–120–007.
Applicants: Cheyenne Light, Fuel and
Power Company.
Description: Compliance filing: Order
No. 1000 OATT Regional Compliance
Filing to be effective 1/1/2015.
Filed Date: 11/19/15.
Accession Number: 20151119–5205.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER16–358–000.
Applicants: Nevada Power Company.
Description: Compliance filing: OATT
Order No. 1000 Revision to Attachment
K to be effective 1/1/2015.
Filed Date: 11/19/15.
Accession Number: 20151119–5193.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER16–359–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
Amendment to the NCPA
Interconnection Agreement (SA 292) to
be effective 1/19/2016.
Filed Date: 11/19/15.
Accession Number: 20151119–5212.
Comments Due: 5 p.m. ET 12/10/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
E:\FR\FM\25NON1.SGM
25NON1
73750
Federal Register / Vol. 80, No. 227 / Wednesday, November 25, 2015 / Notices
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 19, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–29963 Filed 11–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD16–3–000]
Susan Raymond; Notice of Preliminary
Determination of a Qualifying Conduit
Hydropower Facility and Soliciting
Comments and Motions To Intervene
On November 12, 2015, Susan
Raymond filed a notice of intent to
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Powell
Mesa Micro-Hydropower Project would
have an installed capacity of 7.6
kilowatts (kW), and would be located at
the end of an existing 12-inch pipeline
used to control overflow from Susan
Raymond’s irrigation system. The
project would be located near the Town
of Hotchkiss, in Delta County, Colorado.
Applicant Contact: Susan Raymond,
34670 Powell Mesa Road, Hotchkiss, CO
81419, Phone No. (970) 250–3714.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A proposed
powerhouse, approximately 8 feet by 10
feet, at the end of the existing 12-inch
overflow pipeline; (2) two short
penstocks teeing off the existing 12inch-diameter overflow pipeline; (3) two
Turgo turbine/generator units with a
total installed capacity of 7.6 kW; (4) an
approximately 4 feet by 8 feet
underground tailrace, discharging to a
short, 8-inch-diameter pipeline that
discharges to the same pond as the
existing 12-inch overflow pipeline; and
(5) appurtenant facilities.
The proposed project would have a
total installed capacity of 7.6 kW.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ...
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water for
agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts .....................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i), as amended by HREA
tkelley on DSK3SPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA
FPA 30(a)(3)(C)(iii), as amended by
HREA.
Preliminary Determination: The
primary purpose of the overflow
pipeline is to assist the operation of
Susan Raymond’s irrigation system, not
for the generation of electricity.
Therefore, based upon the above
criteria, Commission staff preliminarily
determines that the proposal satisfies
the requirements for a qualifying
conduit hydropower facility, which is
not required to be licensed or exempted
from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
VerDate Sep<11>2014
19:15 Nov 24, 2015
Jkt 238001
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
1 18
PO 00000
CFR 385.2001–2005 (2015).
Frm 00053
Fmt 4703
Sfmt 4703
Y
Y
Y
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
E:\FR\FM\25NON1.SGM
25NON1
Agencies
[Federal Register Volume 80, Number 227 (Wednesday, November 25, 2015)]
[Notices]
[Pages 73749-73750]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-29963]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #3
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER13-77-008.
Applicants: Tucson Electric Power Company.
Description: Compliance filing: OATT Order No. 1000 Compliance
Filing to be effective 1/1/2015.
Filed Date: 11/19/15.
Accession Number: 20151119-5186.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER13-78-008.
Applicants: UNS Electric, Inc.
Description: Compliance filing: OATT Order No. 1000 Compliance
Filing to be effective 1/1/2015.
Filed Date: 11/19/15.
Accession Number: 20151119-5207.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER13-96-007.
Applicants: Black Hills Power, Inc.
Description: Compliance filing: Order No. 1000 OATT Regional
Compliance Filing to be effective 1/1/2015.
Filed Date: 11/19/15.
Accession Number: 20151119-5203.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER13-97-007.
Applicants: Black Hills/Colorado Electric Utility Co.
Description: Compliance filing: Order No. 1000 OATT Regional
Compliance Filing to be effective 1/1/2015.
Filed Date: 11/19/15.
Accession Number: 20151119-5204.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER13-120-007.
Applicants: Cheyenne Light, Fuel and Power Company.
Description: Compliance filing: Order No. 1000 OATT Regional
Compliance Filing to be effective 1/1/2015.
Filed Date: 11/19/15.
Accession Number: 20151119-5205.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER16-358-000.
Applicants: Nevada Power Company.
Description: Compliance filing: OATT Order No. 1000 Revision to
Attachment K to be effective 1/1/2015.
Filed Date: 11/19/15.
Accession Number: 20151119-5193.
Comments Due: 5 p.m. ET 12/10/15.
Docket Numbers: ER16-359-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: Amendment to the NCPA
Interconnection Agreement (SA 292) to be effective 1/19/2016.
Filed Date: 11/19/15.
Accession Number: 20151119-5212.
Comments Due: 5 p.m. ET 12/10/15.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings
[[Page 73750]]
must file in accordance with Rules 211 and 214 of the Commission's
Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date. Protests may be considered, but
intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: November 19, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-29963 Filed 11-24-15; 8:45 am]