Susan Raymond; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 73750-73751 [2015-29960]
Download as PDF
73750
Federal Register / Vol. 80, No. 227 / Wednesday, November 25, 2015 / Notices
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 19, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–29963 Filed 11–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD16–3–000]
Susan Raymond; Notice of Preliminary
Determination of a Qualifying Conduit
Hydropower Facility and Soliciting
Comments and Motions To Intervene
On November 12, 2015, Susan
Raymond filed a notice of intent to
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Powell
Mesa Micro-Hydropower Project would
have an installed capacity of 7.6
kilowatts (kW), and would be located at
the end of an existing 12-inch pipeline
used to control overflow from Susan
Raymond’s irrigation system. The
project would be located near the Town
of Hotchkiss, in Delta County, Colorado.
Applicant Contact: Susan Raymond,
34670 Powell Mesa Road, Hotchkiss, CO
81419, Phone No. (970) 250–3714.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A proposed
powerhouse, approximately 8 feet by 10
feet, at the end of the existing 12-inch
overflow pipeline; (2) two short
penstocks teeing off the existing 12inch-diameter overflow pipeline; (3) two
Turgo turbine/generator units with a
total installed capacity of 7.6 kW; (4) an
approximately 4 feet by 8 feet
underground tailrace, discharging to a
short, 8-inch-diameter pipeline that
discharges to the same pond as the
existing 12-inch overflow pipeline; and
(5) appurtenant facilities.
The proposed project would have a
total installed capacity of 7.6 kW.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ...
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water for
agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts .....................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i), as amended by HREA
tkelley on DSK3SPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA
FPA 30(a)(3)(C)(iii), as amended by
HREA.
Preliminary Determination: The
primary purpose of the overflow
pipeline is to assist the operation of
Susan Raymond’s irrigation system, not
for the generation of electricity.
Therefore, based upon the above
criteria, Commission staff preliminarily
determines that the proposal satisfies
the requirements for a qualifying
conduit hydropower facility, which is
not required to be licensed or exempted
from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
VerDate Sep<11>2014
19:15 Nov 24, 2015
Jkt 238001
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
1 18
PO 00000
CFR 385.2001–2005 (2015).
Frm 00053
Fmt 4703
Sfmt 4703
Y
Y
Y
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
E:\FR\FM\25NON1.SGM
25NON1
Federal Register / Vol. 80, No. 227 / Wednesday, November 25, 2015 / Notices
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD16–3) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: November 19, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–29960 Filed 11–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
tkelley on DSK3SPTVN1PROD with NOTICES
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP16–199–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing: City of
Sullivan to be effective 12/1/2015.
Filed Date: 11/17/15.
Accession Number: 20151117–5119.
Comments Due: 5 p.m. ET 11/30/15.
Docket Numbers: RP16–200–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing: Village
of Bethany to be effective 12/1/2015.
Filed Date: 11/17/15.
Accession Number: 20151117–5131.
Comments Due: 5 p.m. ET 11/30/15.
Docket Numbers: RP16–201–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing: City of
Pickneyville to be effective 12/1/2015.
Filed Date: 11/17/15.
Accession Number: 20151117–5140.
Comments Due: 5 p.m. ET 11/30/15.
Docket Numbers: RP16–202–000.
Applicants: Transcontinental Gas
Pipe Line Company.
Description: § 4(d) Rate Filing: NonConforming Agreement—Bayonne
VerDate Sep<11>2014
19:15 Nov 24, 2015
Jkt 238001
Delivery Lateral—NEC to be effective 4/
1/2014.
Filed Date: 11/17/15.
Accession Number: 20151117–5144.
Comments Due: 5 p.m. ET 11/30/15.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR § 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP15–23–009.
Applicants: Transwestern Pipeline
Company, LLC.
Description: Compliance filing RP15–
23 Settlement Compliance Filing to be
effective 12/1/2015.
Filed Date: 11/18/15.
Accession Number: 20151118–5029.
Comments Due: 5 p.m. ET 11/30/15.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
§ 385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 18, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–29964 Filed 11–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 8396–021]
Great Bear Hydropower, Inc.; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Surrender of
License.
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
73751
b. Project No.: 8396–021.
c. Date Filed: October 26, 2015.
d. Applicant: Great Bear Hydropower,
Inc.
e. Name of Project: Columbia Dam
Hydroelectric Project.
f. Location: On the Paulins Kill, in
Knowlton Township, Warren County,
New Jersey.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Terry
McDonnell, President, Great Bear
Hydropower, Inc., 15 Brigham Hill Rd.,
Norwich, Vermont 05055, Phone: (802)
345–5616, Email: t.p.mcd@comcast.net.
i. FERC Contact: Mr. Ashish Desai,
(202) 502–8370, Ashish.Desai@ferc.gov.
j. Deadline for filing comments,
motions to intervene and protests, is 30
days from the issuance date of this
notice. The Commission strongly
encourages electronic filing. Please file
motions to intervene, protests,
comments, and recommendations, using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–8396–021.
k. Description of Request: The
applicant proposes to surrender the
license and remove all project works
inside the powerhouse and disconnect
the electrical connection to the utility
company. There would be no work
involving ground disturbance and the
equipment required to control the level
of the lake would remain in place, along
with all public safety features. The
applicant has consulted with the
relevant stakeholders and federal, state,
and local agencies, all of which support
the decommissioning of the project.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
E:\FR\FM\25NON1.SGM
25NON1
Agencies
[Federal Register Volume 80, Number 227 (Wednesday, November 25, 2015)]
[Notices]
[Pages 73750-73751]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-29960]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD16-3-000]
Susan Raymond; Notice of Preliminary Determination of a
Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On November 12, 2015, Susan Raymond filed a notice of intent to
construct a qualifying conduit hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as amended by section 4 of the
Hydropower Regulatory Efficiency Act of 2013 (HREA). The proposed
Powell Mesa Micro-Hydropower Project would have an installed capacity
of 7.6 kilowatts (kW), and would be located at the end of an existing
12-inch pipeline used to control overflow from Susan Raymond's
irrigation system. The project would be located near the Town of
Hotchkiss, in Delta County, Colorado.
Applicant Contact: Susan Raymond, 34670 Powell Mesa Road,
Hotchkiss, CO 81419, Phone No. (970) 250-3714.
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A proposed powerhouse, approximately 8
feet by 10 feet, at the end of the existing 12-inch overflow pipeline;
(2) two short penstocks teeing off the existing 12-inch-diameter
overflow pipeline; (3) two Turgo turbine/generator units with a total
installed capacity of 7.6 kW; (4) an approximately 4 feet by 8 feet
underground tailrace, discharging to a short, 8-inch-diameter pipeline
that discharges to the same pond as the existing 12-inch overflow
pipeline; and (5) appurtenant facilities.
The proposed project would have a total installed capacity of 7.6
kW.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Satisfies
Statutory provision Description (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by The conduit the facility Y
HREA. uses is a tunnel,
canal, pipeline,
aqueduct, flume, ditch,
or similar manmade
water conveyance that
is operated for the
distribution of water
for agricultural,
municipal, or
industrial consumption
and not primarily for
the generation of
electricity.
FPA 30(a)(3)(C)(i), as amended The facility is Y
by HREA. constructed, operated,
or maintained for the
generation of electric
power and uses for such
generation only the
hydroelectric potential
of a non-federally
owned conduit.
FPA 30(a)(3)(C)(ii), as amended The facility has an Y
by HREA. installed capacity that
does not exceed 5
megawatts.
FPA 30(a)(3)(C)(iii), as amended On or before August 9, Y
by HREA. 2013, the facility is
not licensed, or
exempted from the
licensing requirements
of Part I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: The primary purpose of the overflow
pipeline is to assist the operation of Susan Raymond's irrigation
system, not for the generation of electricity. Therefore, based upon
the above criteria, Commission staff preliminarily determines that the
proposal satisfies the requirements for a qualifying conduit hydropower
facility, which is not required to be licensed or exempted from
licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied
[[Page 73751]]
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR 4.34(b)
and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (i.e., CD16-3) in the
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call
(202) 502-8659.
Dated: November 19, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-29960 Filed 11-24-15; 8:45 am]
BILLING CODE 6717-01-P