Pacific Gas and Electric Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 72429-72430 [2015-29513]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 223 / Thursday, November 19, 2015 / Notices
Expedited Consideration and
Confidential Treatment.
Filed Date: 11/12/15.
Accession Number: 20151112–5378.
Comments Due: 5 p.m. ET 12/3/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2130–012.
Applicants: Forward Energy LLC.
Description: Supplement to June 30,
2015 Triennial Report for Central
Region of Forward Energy LLC.
Filed Date: 11/13/15.
Accession Number: 20151113–5082.
Comments Due: 5 p.m. ET 12/4/15.
Docket Numbers: ER10–2136–010.
Applicants: Invenergy Cannon Falls
LLC.
Description: Supplement to June 30,
2015 Triennial Report for Central
Region of Invenergy Cannon Falls LLC.
Filed Date: 11/13/15.
Accession Number: 20151113–5083.
Comments Due: 5 p.m. ET 12/4/15.
Docket Numbers: ER11–4044–013.
Applicants: Gratiot County Wind LLC.
Description: Supplement to June 30,
2015 Triennial Report for Central
Region of Gratiot County Wind LLC.
Filed Date: 11/13/15.
Accession Number: 20151113–5080.
Comments Due: 5 p.m. ET 12/4/15.
Docket Numbers: ER11–4046–012.
Applicants: Gratiot County Wind II
LLC.
Description: Supplement to June 30,
2015 Triennial Report for Central
Region of Gratiot County Wind II LLC.
Filed Date: 11/13/15.
Accession Number: 20151113–5079.
Comments Due: 5 p.m. ET 12/4/15.
Docket Numbers: ER12–164–011.
Applicants: Bishop Hill Energy III
LLC.
Description: Supplement to June 30,
2015 Triennial Report for Central
Region of Bishop Hill Energy III LLC.
Filed Date: 11/13/15.
Accession Number: 20151113–5077.
Comments Due: 5 p.m. ET 12/4/15.
Docket Numbers: ER12–645–013.
Applicants: California Ridge Wind
Energy LLC.
Description: Supplement to June 30,
2015 Triennial Report for Central
Region of California Ridge Wind Hill
Energy LLC.
Filed Date: 11/13/15.
Accession Number: 20151113–5078.
Comments Due: 5 p.m. ET 12/4/15.
Docket Numbers: ER15–2742–001.
Applicants: Panda Patriot LLC.
Description: Tariff Amendment:
Amended Market-Based Rate Tariff,
FERC Electric Tariff, Volume No. 1 to be
effective 11/13/2015.
VerDate Sep<11>2014
16:00 Nov 18, 2015
Jkt 238001
Filed Date: 11/12/15.
Accession Number: 20151112–5286.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16–89–001.
Applicants: Jether Energy Research,
LTD.
Description: Tariff Amendment:
Amended MBR Application to be
effective 12/14/2015.
Filed Date: 11/13/15.
Accession Number: 20151113–5081.
Comments Due: 5 p.m. ET 12/4/15.
Docket Numbers: ER16–315–000.
Applicants: PJM Interconnection,
L.L.C., West Penn Power Company,
Duquesne Light Company.
Description: § 205(d) Rate Filing: West
Penn & Duquesne submit
Interconnection Agreement No. 2532 to
be effective 1/11/2016.
Filed Date: 11/12/15.
Accession Number: 20151112–5285.
Comments Due: 5 p.m. ET 12/3/15.
Docket Numbers: ER16–316–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Ministerial Clean-Up due to
Overlapping Filings RE Capacity
Perfomance to be effective 4/1/2015.
Filed Date: 11/12/15.
Accession Number: 20151112–5296.
Comments Due: 5 p.m. ET 12/3/15.
Docket Numbers: ER16–317–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
Service Agreement No. 348—Nonconforming A–1 with Navopache to be
effective 1/1/2016.
Filed Date: 11/12/15.
Accession Number: 20151112–5297.
Comments Due: 5 p.m. ET 12/3/15.
Docket Numbers: ER16–318–000.
Applicants: AES Huntington Beach,
L.L.C., California Independent System
Operator Corporation.
Description: § 205(d) Rate Filing: Rate
Change to be effective 1/1/2016.
Filed Date: 11/12/15.
Accession Number: 20151112–5372.
Comments Due: 5 p.m. ET 12/3/15.
Take notice that the Commission
received the following PURPA
210(m)(3) filings:
Docket Numbers: QM15–3–000.
Applicants: Arkansas Electric
Cooperative Corp.
Description: Response to July 14, 2015
Deficiency Letter [Question No. 4] of
Arkansas Electric Cooperative
Corporation.
Filed Date: 11/12/15.
Accession Number: 20151112–5375.
Comments Due: 5 p.m. ET 12/10/15.
The filings are accessible in the
Commission’s eLibrary system by
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
72429
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 13, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–29510 Filed 11–18–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 77–275]
Pacific Gas and Electric Company;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Application
for Temporary Variance of Minimum
Flow Requirement.
b. Project No.: 77–275.
c. Date Filed: November 10, 2015.
d. Applicant: Pacific Gas and Electric
Company (licensee).
e. Name of Project: Potter Valley
Project.
f. Location: Eel River and East Fork
Russian River in Lake and Mendocino
Counties, California.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Elizabeth
Rossi, License Coordinator, Pacific Gas
and Electric Company, Mail Code:
N13E, P.O. Box 770000, San Francisco,
CA 94177, (415) 973–2032.
i. FERC Contact: Mr. John Aedo, (415)
369–3335, or john.aedo@ferc.gov.
j. Deadline for filing comments,
motions to intervene, protests, and
recommendations is November 27,
2015. The Commission strongly
encourages electronic filing. Please file
E:\FR\FM\19NON1.SGM
19NON1
mstockstill on DSK4VPTVN1PROD with NOTICES
72430
Federal Register / Vol. 80, No. 223 / Thursday, November 19, 2015 / Notices
motions to intervene, protests,
comments, or recommendations using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Please include the project number (P–
77–275) on any comments, motions to
intervene, protests, or recommendations
filed.
k. Description of Request: The
licensee requests an extension of a
previous temporary variance of the
minimum flow requirements in the Eel
River and East Branch Russian River.
On June 18, 2015, the Commission
issued an order approving a temporary
variance of the minimum flow
requirements in the Eel River below
Scott Dam (gage E–2), the Eel River
below Cape Horn Dam (gage E–11), and
East Branch Russian River (gage E–16).
Specifically, the order granted the
licensee’s request to operate under a dry
water year scenario through December
1, 2015, in order to preserve limited
water resources during the current
drought. In its November 10, 2015
request, the licensee states that the
project reservoir (Lake Pillsbury) is
projected to drain by mid-January.
Consequently, the licensee requests
Commission approval to operate as low
as the critically dry year minimum flow
requirements in the Eel River below
Scott Dam (20 cubic feet per second (cfs)
release) and the East Branch Russian
River (5 cfs release) and the
exceptionally low minimum flow
requirements in the Eel River below
Cape Horn Dam (9 cfs release) in order
to preserve water storage. In addition,
the licensee requests Commission
approval for a modified minimum flow
compliance criteria of a 24-hour
average, rather that an instantaneous
requirement. The licensee requests the
temporary variance through January 31,
2016, or when storage in Lake Pillsbury
reaches 27,000 acre-feet, whichever
comes first.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
VerDate Sep<11>2014
16:00 Nov 18, 2015
Jkt 238001
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: November 13, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–29513 Filed 11–18–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–1345–002.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2015–
11–12_SMEPA Compliance Amendment
to be effective 6/1/2015.
Filed Date: 11/12/15.
Accession Number: 20151112–5253.
Comments Due: 5 p.m. ET 12/3/15.
Docket Numbers: ER15–2239–001.
Applicants: NextEra Energy
Transmission West, LLC.
Description: Tariff Amendment:
NextEra Energy Transmission West, LLC
Response to Deficiency Letter to be
effective 10/20/2015.
Filed Date: 11/10/15.
Accession Number: 20151110–5163.
Comments Due: 5 p.m. ET 12/1/15.
Docket Numbers: ER15–2679–000.
Applicants: Latigo Wind Park, LLC.
Description: Latigo Wind Park, LLC
submits tariff filing per 35.12: Latigo
Wind Park, LLC MBR Tariff to be
effective 11/15/2015 Replaces
20150921–5134).
Filed Date: 10/22/15.
Accession Number: 20151022–5049.
Comments Due: 5 p.m. ET 12/3/15.
Docket Numbers: ER16–36–001.
Applicants: Public Service Company
of Colorado.
Description: Tariff Amendment:
2015–11–12_PSC–WAPA-Con Fac
Agrmt-359–0.0.1-Amend to be effective
12/8/2015.
Filed Date: 11/12/15.
Accession Number: 20151112–5199.
Comments Due: 5 p.m. ET 12/3/15.
Docket Numbers: ER16–305–000.
E:\FR\FM\19NON1.SGM
19NON1
Agencies
[Federal Register Volume 80, Number 223 (Thursday, November 19, 2015)]
[Notices]
[Pages 72429-72430]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-29513]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 77-275]
Pacific Gas and Electric Company; Notice of Application Accepted
for Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Application for Temporary Variance of
Minimum Flow Requirement.
b. Project No.: 77-275.
c. Date Filed: November 10, 2015.
d. Applicant: Pacific Gas and Electric Company (licensee).
e. Name of Project: Potter Valley Project.
f. Location: Eel River and East Fork Russian River in Lake and
Mendocino Counties, California.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Elizabeth Rossi, License Coordinator,
Pacific Gas and Electric Company, Mail Code: N13E, P.O. Box 770000, San
Francisco, CA 94177, (415) 973-2032.
i. FERC Contact: Mr. John Aedo, (415) 369-3335, or
john.aedo@ferc.gov.
j. Deadline for filing comments, motions to intervene, protests,
and recommendations is November 27, 2015. The Commission strongly
encourages electronic filing. Please file
[[Page 72430]]
motions to intervene, protests, comments, or recommendations using the
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. Please include the project number (P-77-275) on
any comments, motions to intervene, protests, or recommendations filed.
k. Description of Request: The licensee requests an extension of a
previous temporary variance of the minimum flow requirements in the Eel
River and East Branch Russian River. On June 18, 2015, the Commission
issued an order approving a temporary variance of the minimum flow
requirements in the Eel River below Scott Dam (gage E-2), the Eel River
below Cape Horn Dam (gage E-11), and East Branch Russian River (gage E-
16). Specifically, the order granted the licensee's request to operate
under a dry water year scenario through December 1, 2015, in order to
preserve limited water resources during the current drought. In its
November 10, 2015 request, the licensee states that the project
reservoir (Lake Pillsbury) is projected to drain by mid-January.
Consequently, the licensee requests Commission approval to operate as
low as the critically dry year minimum flow requirements in the Eel
River below Scott Dam (20 cubic feet per second (cfs) release) and the
East Branch Russian River (5 cfs release) and the exceptionally low
minimum flow requirements in the Eel River below Cape Horn Dam (9 cfs
release) in order to preserve water storage. In addition, the licensee
requests Commission approval for a modified minimum flow compliance
criteria of a 24-hour average, rather that an instantaneous
requirement. The licensee requests the temporary variance through
January 31, 2016, or when storage in Lake Pillsbury reaches 27,000
acre-feet, whichever comes first.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the license surrender.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: November 13, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-29513 Filed 11-18-15; 8:45 am]
BILLING CODE 6717-01-P