Notice of Permit Modification Received Under the Antarctic Conservation Act of 1978, 71846 [2015-29345]
Download as PDF
71846
Federal Register / Vol. 80, No. 221 / Tuesday, November 17, 2015 / Notices
NATIONAL SCIENCE FOUNDATION
Notice of Permit Modification Received
Under the Antarctic Conservation Act
of 1978
AGENCY:
National Science Foundation.
Notice of Permit Modification
Request Received and Permit Issued
under the Antarctic Conservation Act of
1978, Public Law 95–541.
ACTION:
The National Science
Foundation (NSF) is required to publish
a notice of requests to modify permits
issued to conduct activities regulated
and permits issued under the Antarctic
Conservation Act of 1978. NSF has
published regulations under the
Antarctic Conservation Act at Title 45
Part 670 of the Code of Federal
Regulations. This is the required notice
of a requested permit modification and
permit issued.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
Nature McGinn, ACA Permit Officer,
Division of Polar Programs, Rm. 755,
National Science Foundation, 4201
Wilson Boulevard, Arlington, VA 22230.
Or by email: ACApermits@nsf.gov.
The
Foundation issued a permit (ACA 2011–
002) to David Ainley on May 28, 2010.
The issued permit allows the applicant
to band, apply instruments, weigh,
collect blood and cloacal swabs, and
mark nests of Adelie penguins located at
Cape Crozier (ASPA 124), Cape Royds
(ASPA 121), Cape Bird, and Beaufort
Island (ASPA 105), as well as to enter
Cape Hallett (ASPA 106) in November
2014 to check for banded birds.
A recent modification to this permit,
dated November 14, 2014, permitted the
applicant to deploy temperature loggers
in penguin nests to test hypotheses on
nest quality.
Now the applicant proposes a permit
modification to extend the duration of
his permit for another year, so that it
expires on August 31, 2016. The
Environmental Officer has reviewed the
modification request and has
determined that the amendment is not
a material change to the permit, and it
will have a less than a minor or
transitory impact.
SUPPLEMENTARY INFORMATION:
November 12, 2015 to August 31,
2016.
The permit modification was issued
on November 12, 2015.
mstockstill on DSK4VPTVN1PROD with NOTICES
DATES:
Nadene G. Kennedy,
Polar Coordination Specialist, Division of
Polar Programs.
[FR Doc. 2015–29345 Filed 11–16–15; 8:45 am]
BILLING CODE 7555–01–P
VerDate Sep<11>2014
18:14 Nov 16, 2015
Jkt 238001
FOR FURTHER INFORMATION CONTACT:
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–271; NRC–2015–0029]
Entergy Nuclear Operations, Inc.;
Vermont Yankee Nuclear Power
Station
Nuclear Regulatory
Commission.
ACTION: License amendment application;
withdrawal by applicant.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) has granted the
request of Entergy Nuclear Operations,
Inc. (Entergy, the licensee), to withdraw
its application dated September 4, 2014,
for a proposed amendment to Renewed
Facility Operating License No. DPR–28,
for the Vermont Yankee Nuclear Power
Station (VY). The proposed amendment
would have replaced VY’s
decommissioning trust fund (DTF)
license conditions with the NRC’s
regulations governing decommissioning
trust funds.
DATES: November 17, 2015.
ADDRESSES: Please refer to Docket ID
NRC–2015–0029 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2015–0029. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if that document
is available in ADAMS) is provided the
first time that a document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
SUMMARY:
PO 00000
Frm 00077
Fmt 4703
Sfmt 4703
James Kim, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone: 301–415–4125; email:
James.Kim@nrc.gov.
SUPPLEMENTARY INFORMATION: The NRC
has granted the request of Entergy
Nuclear Operations, Inc. (Entergy, the
licensee), to withdraw its application
dated September 4, 2014 (ADAMS
Accession No. ML14254A405), for a
proposed amendment to Renewed
Facility Operating License No. DPR–28,
for VY, located in Windam County,
Vermont. The proposed amendment
would have replaced VY’s DTF license
conditions with the DTF provisions in
paragraph 50.75(h) of Title 10 of the
Code of Federal Regulations (CFR).
The NRC published a Biweekly Notice
in the Federal Register on February 17,
2015 (80 FR 8359), that gave notice that
this proposed amendment was under
consideration by the NRC. However, by
letter dated September 22, 2015
(ADAMS Accession No. ML15267A074),
the licensee requested to withdraw the
proposed amendment.
Dated at Rockville, Maryland, this 10th day
of November 2015.
For the Nuclear Regulatory Commission.
Meena K. Khanna,
Chief, Plant Licensing Branch IV–2 and
Decommissioning Transition Branch,
Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. 2015–29300 Filed 11–16–15; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2015–0001]
Sunshine Act Meeting Notice
November 16, 23, 30, December
7, 14, 21, 2015.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and closed.
DATE:
Week of November 16, 2015
Tuesday, November 17, 2015
9:00 a.m. Briefing on the Status of
Lessons Learned from the
Fukushima Dai-Ichi Accident
(Public Meeting)
(Contact: Gregory Bowman: 301–415–
2939)
This meeting will be webcast live at
the Web address—https://www.nrc.gov/.
Thursday, November 19, 2015
9:00 a.m. Hearing on Combined
Licenses for South Texas Project,
E:\FR\FM\17NON1.SGM
17NON1
Agencies
[Federal Register Volume 80, Number 221 (Tuesday, November 17, 2015)]
[Notices]
[Page 71846]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-29345]
[[Page 71846]]
-----------------------------------------------------------------------
NATIONAL SCIENCE FOUNDATION
Notice of Permit Modification Received Under the Antarctic
Conservation Act of 1978
AGENCY: National Science Foundation.
ACTION: Notice of Permit Modification Request Received and Permit
Issued under the Antarctic Conservation Act of 1978, Public Law 95-541.
-----------------------------------------------------------------------
SUMMARY: The National Science Foundation (NSF) is required to publish a
notice of requests to modify permits issued to conduct activities
regulated and permits issued under the Antarctic Conservation Act of
1978. NSF has published regulations under the Antarctic Conservation
Act at Title 45 Part 670 of the Code of Federal Regulations. This is
the required notice of a requested permit modification and permit
issued.
FOR FURTHER INFORMATION CONTACT: Nature McGinn, ACA Permit Officer,
Division of Polar Programs, Rm. 755, National Science Foundation, 4201
Wilson Boulevard, Arlington, VA 22230. Or by email: ACApermits@nsf.gov.
SUPPLEMENTARY INFORMATION: The Foundation issued a permit (ACA 2011-
002) to David Ainley on May 28, 2010. The issued permit allows the
applicant to band, apply instruments, weigh, collect blood and cloacal
swabs, and mark nests of Adelie penguins located at Cape Crozier (ASPA
124), Cape Royds (ASPA 121), Cape Bird, and Beaufort Island (ASPA 105),
as well as to enter Cape Hallett (ASPA 106) in November 2014 to check
for banded birds.
A recent modification to this permit, dated November 14, 2014,
permitted the applicant to deploy temperature loggers in penguin nests
to test hypotheses on nest quality.
Now the applicant proposes a permit modification to extend the
duration of his permit for another year, so that it expires on August
31, 2016. The Environmental Officer has reviewed the modification
request and has determined that the amendment is not a material change
to the permit, and it will have a less than a minor or transitory
impact.
DATES: November 12, 2015 to August 31, 2016.
The permit modification was issued on November 12, 2015.
Nadene G. Kennedy,
Polar Coordination Specialist, Division of Polar Programs.
[FR Doc. 2015-29345 Filed 11-16-15; 8:45 am]
BILLING CODE 7555-01-P