Darren K. Vaughn, Scott M. Fodor, Trust; Notice of Transfer of Exemption, 71790 [2015-29267]
Download as PDF
71790
Federal Register / Vol. 80, No. 221 / Tuesday, November 17, 2015 / Notices
Cimarron in Gunnison County,
Colorado.
Applicant Contact: Gabe Stephens,
Black Canyon Resources, LLC, P.O. Box
1781, Gunnison, CO 81230, Phone No.
(970) 946–5096.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062, email: robert.bell@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) Replacing
the existing gate valves with an impulse
turbine with an installed capacity of 2
kW; (3) a 15-foot-long, 8-inch-diameter
discharge pipe reducing to 6-inch
diameter connecting to the existing 6inch-diameter irrigation pipeline; and
(4) appurtenant facilities. The proposed
project would have an estimated annual
generating capacity of 11.4 megawatthours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Description
Satisfies
(Y/N)
The conduit the facility uses a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric power and
uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................................
Y
Statutory provision
FPA 30(a)(3)(A), as amended
by HREA.
mstockstill on DSK4VPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(i), as amended
by HREA.
FPA 30(a)(3)(C)(ii), as amended by HREA.
FPA 30(a)(3)(C)(iii), as amended by HREA.
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
1 18
CFR 385.2001–2005 (2015).
VerDate Sep<11>2014
18:14 Nov 16, 2015
Jkt 238001
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD16–2–000) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email FERCOnline
Support@ferc.gov. For TTY, call (202)
502–8659.
PO 00000
Frm 00021
Fmt 4703
Sfmt 9990
Y
Y
Y
Dated: November 10, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–29264 Filed 11–16–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10309–001]
Darren K. Vaughn, Scott M. Fodor,
Trust; Notice of Transfer of Exemption
1. By letter filed November 3, 2015,
Darren K. Vaughn informed the
Commission that the exemption from
licensing for the Flying W Project No.
10309, originally issued July 21, 1987 1
has been transferred to Scott M. Fodor,
Trust. The name of the project has been
changed from Flying W to Scott M.
Fodor, Trust. The project is located on
an irrigation pipe near Emmett in Valley
County, Idaho. The transfer of an
exemption does not require Commission
approval.
2. Scott M. Fodor, Trust is now the
exemptee of the Scott M. Fodor, Trust
Project, No. 10309. All correspondence
should be forwarded to: Scott M. Fodor,
Trust, 10644 W. Coleman Road,
Barryton, MI 49305.
Dated: November 10, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–29267 Filed 11–16–15; 8:45 am]
BILLING CODE 6717–01–P
1 40 FERC ¶ 62,056 (1987), Order Granting
Exemption from Licensing (Conduit).
E:\FR\FM\17NON1.SGM
17NON1
Agencies
[Federal Register Volume 80, Number 221 (Tuesday, November 17, 2015)]
[Notices]
[Page 71790]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-29267]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10309-001]
Darren K. Vaughn, Scott M. Fodor, Trust; Notice of Transfer of
Exemption
1. By letter filed November 3, 2015, Darren K. Vaughn informed the
Commission that the exemption from licensing for the Flying W Project
No. 10309, originally issued July 21, 1987 \1\ has been transferred to
Scott M. Fodor, Trust. The name of the project has been changed from
Flying W to Scott M. Fodor, Trust. The project is located on an
irrigation pipe near Emmett in Valley County, Idaho. The transfer of an
exemption does not require Commission approval.
---------------------------------------------------------------------------
\1\ 40 FERC ] 62,056 (1987), Order Granting Exemption from
Licensing (Conduit).
---------------------------------------------------------------------------
2. Scott M. Fodor, Trust is now the exemptee of the Scott M. Fodor,
Trust Project, No. 10309. All correspondence should be forwarded to:
Scott M. Fodor, Trust, 10644 W. Coleman Road, Barryton, MI 49305.
Dated: November 10, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-29267 Filed 11-16-15; 8:45 am]
BILLING CODE 6717-01-P