Tennessee Gas Pipeline Company, L.L.C.; Notice of Application, 70771 [2015-29148]

Download as PDF Federal Register / Vol. 80, No. 220 / Monday, November 16, 2015 / Notices or potentially significant impacts that may result from the proposed project. When completed, the Draft EIS will be circulated for review and comment, and BPA will hold at least one public comment meeting for the Draft EIS. BPA will consider and respond in the Final EIS to comments received on the Draft EIS. BPA’s subsequent decision will be documented in a Record of Decision. Maps and further information are available from BPA at the address above. Issued in Portland, Oregon on November 4, 2015. Elliot E. Mainzer, Administrator and Chief Executive Officer. [FR Doc. 2015–28936 Filed 11–13–15; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP16–12–000] tkelley on DSK3SPTVN1PROD with NOTICES Tennessee Gas Pipeline Company, L.L.C.; Notice of Application Take notice that on October 26, 2015, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application pursuant to section 7(c) of the Natural Gas Act (NGA) requesting authorization to construct and operate its Southwest Louisiana Supply Project to provide 295,000 dekatherms per day of incremental capacity to serve Mitsubishi Corporation and MMGS, Inc. Specifically, Tennessee proposes to construct (i) approximately 2.4 miles of 30-inch-diameter pipeline lateral in Madison Parish, Louisiana; (ii) approximately 1.4 miles of 30-inchdiameter pipeline lateral in Richland and Franklin Parishes, Louisiana; (iii) five meter stations to allow Tennessee to receive gas on its existing 800 Line from five interconnecting pipelines; (iv) one new compressor station in Franklin Parish, Louisiana; and (v) to replace a turbine engine at an existing compressor station in Rapides Parish, Louisiana. Tennessee estimates the cost of the Project to be $170,453,208, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC VerDate Sep<11>2014 19:47 Nov 13, 2015 Jkt 238001 at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application may be directed to Patrick Stewart, Senior Counsel, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002, by telephone at (713) 369–8765, by facsimile at (713) 420–1601, or by email at Patrick_Stewart@kindermorgan.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice, the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit five copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 70771 to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and five copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on November 30, 2015. Dated: November 9, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–29148 Filed 11–13–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP16–14–000] Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization Take notice that on November 2, 2015, Columbia Gas Transmission, LLC (Columbia), pursuant to its blanket certificate authorization granted in E:\FR\FM\16NON1.SGM 16NON1

Agencies

[Federal Register Volume 80, Number 220 (Monday, November 16, 2015)]
[Notices]
[Page 70771]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-29148]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-12-000]


Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Take notice that on October 26, 2015, Tennessee Gas Pipeline 
Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 
77002, filed an application pursuant to section 7(c) of the Natural Gas 
Act (NGA) requesting authorization to construct and operate its 
Southwest Louisiana Supply Project to provide 295,000 dekatherms per 
day of incremental capacity to serve Mitsubishi Corporation and MMGS, 
Inc. Specifically, Tennessee proposes to construct (i) approximately 
2.4 miles of 30-inch-diameter pipeline lateral in Madison Parish, 
Louisiana; (ii) approximately 1.4 miles of 30-inch-diameter pipeline 
lateral in Richland and Franklin Parishes, Louisiana; (iii) five meter 
stations to allow Tennessee to receive gas on its existing 800 Line 
from five interconnecting pipelines; (iv) one new compressor station in 
Franklin Parish, Louisiana; and (v) to replace a turbine engine at an 
existing compressor station in Rapides Parish, Louisiana. Tennessee 
estimates the cost of the Project to be $170,453,208, all as more fully 
set forth in the application which is on file with the Commission and 
open to public inspection. The filing is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or 
TYY, (202) 502-8659.
    Any questions concerning this application may be directed to 
Patrick Stewart, Senior Counsel, Tennessee Gas Pipeline Company, 
L.L.C., 1001 Louisiana Street, Houston, Texas 77002, by telephone at 
(713) 369-8765, by facsimile at (713) 420-1601, or by email at 
Patrick_Stewart@kindermorgan.com.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice, the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit five copies of filings made in the proceeding with the 
Commission and must mail a copy to the applicant and to every other 
party. Only parties to the proceeding can ask for court review of 
Commission orders in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and five copies of the protest or intervention to 
the Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on November 30, 2015.

    Dated: November 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-29148 Filed 11-13-15; 8:45 am]
BILLING CODE 6717-01-P