Combined Notice of Filings #1, 70780-70781 [2015-29144]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
70780
Federal Register / Vol. 80, No. 220 / Monday, November 16, 2015 / Notices
f. Location: Approximately 11 miles
northeast of the City of Klamath Falls,
Klamath County, Oregon. The proposed
project boundary would include about
730 acres of federal land managed by
the U.S. Bureau of Land Management.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. §§ 791(a)–825(r).
h. Applicant Contact: Joe Eberhardt,
EDF-Renewable Energy, 1000 SW
Broadway Ave., Ste. 1800, Portland, OR
97205; Phone: (503) 889–3838.
i. FERC Contact: Dianne Rodman,
dianne.rodman@ferc.gov; phone: (202)
502–6077.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: December 27, 2015.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–13318–003.
m. The application is not ready for
environmental analysis at this time.
n. The proposed project would be a
closed-loop system using groundwater
for initial fill and consist of the
following new facilities: (1) A 7,972–
foot-long earthen embankment forming
VerDate Sep<11>2014
19:47 Nov 13, 2015
Jkt 238001
a geomembrane-lined upper reservoir
with a surface area of 64.21 acres and
a storage capacity of 2,568 acre-feet at a
maximum surface elevation of 6,135 feet
above mean sea level (msl); (2) a 8,003foot-long earthen embankment forming
a geomembrane-lined lower reservoir
with a surface area of 60.14 acres and
a storage capacity of 3,206 acre-feet at a
maximum surface elevation of 4,457 feet
msl; (3) a 500-foot-long, rip-rap lined
trapezoidal spillway built into the crest
of each embankment; (4) a 0.5-percent
slope perforated polyvinyl chloride tube
of varying diameter and accompanying
optical fiber drainage system designed
to detect, collect, and monitor water
leakage from the reservoirs; (5) a 25inch-diameter bottom outlet with
manual valve for gravitational
dewatering of the lower reservoir; (6) an
upper intake consisting of a bell mouth,
38.6-foot-wide by 29.8-foot-long
inclined screen, head gate, and 13.8foot-diameter foundational steel pipe;
(7) a 36.5-foot-diameter, 9,655-foot-long
steel high-pressure penstock from the
upper reservoir to the powerhouse that
is predominantly above ground with a
14-foot-long buried segment; (8) three
9.8-foot-diameter, 1,430-foot-long steel
low-pressure penstocks from the lower
reservoir to the powerhouse that are
predominantly above ground with a 78foot-long buried segment; (9) a partiallyburied powerhouse with three 131.1megawatt (MW) reversible pumpturbine units with a total installed
capacity of 393.3 MW; (10) a 32.8 mile,
230-kilovolt above-ground transmission
line interconnecting to an existing nonproject substation; (11) approximately
10.7 miles of improved project access
road; (12) approximately 3.4 miles of
new permanent project access road; (13)
approximately 8.3 miles of temporary
project access road; and (14)
appurtenant facilities. The project
would generate about 1,187 gigawatthours annually.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
p. Procedural schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Notice of Acceptance—March
2016
Issue Scoping Document 1 for
comments—April 2016
Comments on Scoping Document 1—
June 2016
Issue Scoping Document 2—July 2016
Issue notice of ready for environmental
analysis—July 2016
Commission issues draft EIS—December
2017
Comments on draft EIS—February 2017
Commission issues final EIS—June 2017
Dated: November 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–29158 Filed 11–13–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC16–29–000.
Applicants: Holtwood, LLC, BIF III
Holtwood LLC.
Description: Joint Application of
Holtwood, LLC et al. for Authorization
under Section 203 of the FPA and
Request for Limited Waivers.
Filed Date: 11/6/15.
Accession Number: 20151106–5197.
Comments Due: 5 p.m. ET 11/27/15.
Docket Numbers: EC16–30–000.
Applicants: Talen Ironwood, LLC,
Talen Energy Marketing, LLC,
TransCanada Facility USA, Inc.,
TransCanada Power Marketing, Ltd.
Description: Joint Application of
Talen Ironwood, LLC et al. for
Authorization of Disposition of
Jurisdictional Facilities under Section
203 of the FPA and Requests for
Waivers.
Filed Date: 11/6/15.
Accession Number: 20151106–5198.
Comments Due: 5 p.m. ET 11/27/15.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG16–19–000.
Applicants: BIF III Holtwood LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of BIF III Holtwood
LLC.
E:\FR\FM\16NON1.SGM
16NON1
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 220 / Monday, November 16, 2015 / Notices
Filed Date: 11/6/15.
Accession Number: 20151106–5169.
Comments Due: 5 p.m. ET 11/27/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1790–012;
ER10–2596–005; ER10–276–003; ER11–
3325–004.
Applicants: BP Energy Company,
Fowler Ridge II Wind Farm LLC, Rolling
Thunder I Power Partners, LLC, Whiting
Clean Energy, Inc.
Description: Supplement to June 26,
2015 Updated Market Power Analysis
for Central Region of BP Energy
Company, et al.
Filed Date: 11/6/15.
Accession Number: 20151106–5186.
Comments Due: 5 p.m. ET 11/27/15.
Docket Numbers: ER16–287–000.
Applicants: BIF III Holtwood LLC.
Description: Baseline eTariff Filing:
BIF III Holtwood LLC MBR Application
to be effective 11/9/2015.
Filed Date: 11/6/15.
Accession Number: 20151106–5139.
Comments Due: 5 p.m. ET 11/27/15.
Docket Numbers: ER16–288–000.
Applicants: Entergy Services, Inc.
Description: § 205(d) Rate Filing:
Entergy Services, Inc., Amended Service
Agreements to be effective 11/8/2015.
Filed Date: 11/6/15.
Accession Number: 20151106–5141.
Comments Due: 5 p.m. ET 11/27/15.
Docket Numbers: ER16–289–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
COTP CIRS Appendix F Update to be
effective 1/6/2016.
Filed Date: 11/6/15.
Accession Number: 20151106–5142.
Comments Due: 5 p.m. ET 11/27/15.
Docket Numbers: ER16–290–000.
Applicants: Mesquite Solar 1, LLC.
Description: § 205(d) Rate Filing:
Mesquite Solar 1, LLC Assignment, CoTenancy and Shared Facilities
Agreement to be effective 11/20/2015.
Filed Date: 11/6/15.
Accession Number: 20151106–5143.
Comments Due: 5 p.m. ET 11/27/15.
Docket Numbers: ER16–291–000.
Applicants: Arizona Public Service
Company.
Description: Notice of Cancellation of
Rate Schedule No. 25 of Arizona Public
Service Company.
Filed Date: 11/6/15.
Accession Number: 20151106–5185.
Comments Due: 5 p.m. ET 11/27/15.
Docket Numbers: ER16–292–000.
Applicants: Northern Virginia Electric
Cooperative, Inc.
Description: Notice of Cancellation of
Rate Schedule No. 1 of Northern
Virginia Electric Cooperative, Inc.
VerDate Sep<11>2014
19:47 Nov 13, 2015
Jkt 238001
Filed Date: 11/6/15.
Accession Number: 20151106–5195.
Comments Due: 5 p.m. ET 11/27/15.
Take notice that the Commission
received the following land acquisition
reports:
Docket Numbers: LA15–3–000.
Applicants: Cimarron Windpower II,
LLC, CinCap V, LLC, Conetoe II Solar,
LLC, Duke Energy Beckjord, LLC, Duke
Energy Beckjord Storage, LLC, Duke
Energy Carolinas, LLC, Duke Energy
Commercial Enterprises, Inc., Duke
Energy Florida, LLC, Duke Energy
Indiana, Inc., Duke Energy Kentucky,
Inc., Duke Energy Ohio, Inc., Duke
Energy Piketon, LLC, Duke Energy
Progress, LLC, Duke Energy Renewable
Services, LLC, Happy Jack Windpower,
LLC, Ironwood Windpower, LLC, Kit
Carson Windpower, LLC, Laurel Hill
Wind Energy, LLC, North Allegheny
Wind, LLC, Silver Sage Windpower,
LLC, Three Buttes Windpower, LLC,
Top of the World Wind Energy, LLC,
Seville Solar One LLC, Seville Solar
Two, LLC, Tallbear Seville LLC.
Description: Quarterly Land
Acquisition Report of the Duke Energy
MBR Affiliates.
Filed Date: 11/6/15.
Accession Number: 20151106–5154.
Comments Due: 5 p.m. ET 11/27/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–29144 Filed 11–13–15; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
70781
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OAR–2015–0216; FRL–9937–13–
OAR]
Release of Draft Control Techniques
Guidelines for the Oil and Natural Gas
Industry
Environmental Protection
Agency (EPA).
ACTION: Extension of comment period.
AGENCY:
On September 18, 2015, the
Environmental Protection Agency (EPA)
announced the availability of a draft
Control Techniques Guidelines (CTG)
document titled, ‘‘Release of Draft
Control Techniques Guidelines for the
Oil and Natural Gas Industry.’’ The EPA
is extending the comment period on the
notice of availability of the draft CTG
document that was scheduled to close
on November 17, 2015. The EPA has
received several letters from trade and
business organizations, states and tribes
requesting additional time to review and
comment on the notice of availability of
the draft CTG document.
DATES: The public comment period for
notice of availability of the CTG
document published in the Federal
Register on September 18, 2015 (80 FR
56577), is being extended. Written
comments must be received on or before
December 4, 2015.
ADDRESSES: The EPA has established a
docket for the draft CTG document
(available at https://
www.regulations.gov). For the notice of
availability titled, ‘‘Release of Draft
Control Techniques Guidelines for the
Oil and Natural Gas Industry,’’ the
Docket ID No. is EPA–HQ–OAR–2015–
0216. Information on this document is
posted at https://www.epa.gov/
airquality/oilandgas/actions.html.
Submit your comments, identified by
the appropriate Docket ID, to the
Federal eRulemaking Portal: https://
www.regulations.gov. Follow the online
instructions for submitting comments.
Once submitted, comments cannot be
edited or withdrawn. The EPA may
publish any comment received to its
public docket. Do not submit
electronically any information you
consider to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
If you need to include CBI as part of
your comment, please visit https://
www.epa.gov/dockets/comments.html
for instructions. Multimedia
submissions (audio, video, etc.) must be
accompanied by a written comment.
The written comment is considered the
official comment and should include
SUMMARY:
E:\FR\FM\16NON1.SGM
16NON1
Agencies
[Federal Register Volume 80, Number 220 (Monday, November 16, 2015)]
[Notices]
[Pages 70780-70781]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-29144]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC16-29-000.
Applicants: Holtwood, LLC, BIF III Holtwood LLC.
Description: Joint Application of Holtwood, LLC et al. for
Authorization under Section 203 of the FPA and Request for Limited
Waivers.
Filed Date: 11/6/15.
Accession Number: 20151106-5197.
Comments Due: 5 p.m. ET 11/27/15.
Docket Numbers: EC16-30-000.
Applicants: Talen Ironwood, LLC, Talen Energy Marketing, LLC,
TransCanada Facility USA, Inc., TransCanada Power Marketing, Ltd.
Description: Joint Application of Talen Ironwood, LLC et al. for
Authorization of Disposition of Jurisdictional Facilities under Section
203 of the FPA and Requests for Waivers.
Filed Date: 11/6/15.
Accession Number: 20151106-5198.
Comments Due: 5 p.m. ET 11/27/15.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG16-19-000.
Applicants: BIF III Holtwood LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of BIF III Holtwood LLC.
[[Page 70781]]
Filed Date: 11/6/15.
Accession Number: 20151106-5169.
Comments Due: 5 p.m. ET 11/27/15.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1790-012; ER10-2596-005; ER10-276-003; ER11-
3325-004.
Applicants: BP Energy Company, Fowler Ridge II Wind Farm LLC,
Rolling Thunder I Power Partners, LLC, Whiting Clean Energy, Inc.
Description: Supplement to June 26, 2015 Updated Market Power
Analysis for Central Region of BP Energy Company, et al.
Filed Date: 11/6/15.
Accession Number: 20151106-5186.
Comments Due: 5 p.m. ET 11/27/15.
Docket Numbers: ER16-287-000.
Applicants: BIF III Holtwood LLC.
Description: Baseline eTariff Filing: BIF III Holtwood LLC MBR
Application to be effective 11/9/2015.
Filed Date: 11/6/15.
Accession Number: 20151106-5139.
Comments Due: 5 p.m. ET 11/27/15.
Docket Numbers: ER16-288-000.
Applicants: Entergy Services, Inc.
Description: Sec. 205(d) Rate Filing: Entergy Services, Inc.,
Amended Service Agreements to be effective 11/8/2015.
Filed Date: 11/6/15.
Accession Number: 20151106-5141.
Comments Due: 5 p.m. ET 11/27/15.
Docket Numbers: ER16-289-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: COTP CIRS Appendix F Update
to be effective 1/6/2016.
Filed Date: 11/6/15.
Accession Number: 20151106-5142.
Comments Due: 5 p.m. ET 11/27/15.
Docket Numbers: ER16-290-000.
Applicants: Mesquite Solar 1, LLC.
Description: Sec. 205(d) Rate Filing: Mesquite Solar 1, LLC
Assignment, Co-Tenancy and Shared Facilities Agreement to be effective
11/20/2015.
Filed Date: 11/6/15.
Accession Number: 20151106-5143.
Comments Due: 5 p.m. ET 11/27/15.
Docket Numbers: ER16-291-000.
Applicants: Arizona Public Service Company.
Description: Notice of Cancellation of Rate Schedule No. 25 of
Arizona Public Service Company.
Filed Date: 11/6/15.
Accession Number: 20151106-5185.
Comments Due: 5 p.m. ET 11/27/15.
Docket Numbers: ER16-292-000.
Applicants: Northern Virginia Electric Cooperative, Inc.
Description: Notice of Cancellation of Rate Schedule No. 1 of
Northern Virginia Electric Cooperative, Inc.
Filed Date: 11/6/15.
Accession Number: 20151106-5195.
Comments Due: 5 p.m. ET 11/27/15.
Take notice that the Commission received the following land
acquisition reports:
Docket Numbers: LA15-3-000.
Applicants: Cimarron Windpower II, LLC, CinCap V, LLC, Conetoe II
Solar, LLC, Duke Energy Beckjord, LLC, Duke Energy Beckjord Storage,
LLC, Duke Energy Carolinas, LLC, Duke Energy Commercial Enterprises,
Inc., Duke Energy Florida, LLC, Duke Energy Indiana, Inc., Duke Energy
Kentucky, Inc., Duke Energy Ohio, Inc., Duke Energy Piketon, LLC, Duke
Energy Progress, LLC, Duke Energy Renewable Services, LLC, Happy Jack
Windpower, LLC, Ironwood Windpower, LLC, Kit Carson Windpower, LLC,
Laurel Hill Wind Energy, LLC, North Allegheny Wind, LLC, Silver Sage
Windpower, LLC, Three Buttes Windpower, LLC, Top of the World Wind
Energy, LLC, Seville Solar One LLC, Seville Solar Two, LLC, Tallbear
Seville LLC.
Description: Quarterly Land Acquisition Report of the Duke Energy
MBR Affiliates.
Filed Date: 11/6/15.
Accession Number: 20151106-5154.
Comments Due: 5 p.m. ET 11/27/15.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: November 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-29144 Filed 11-13-15; 8:45 am]
BILLING CODE 6717-01-P