Opportunity To Comment on Changes to the Nevada and California Greater Sage-Grouse Bi-State Distinct Population Segment Carson City Field Office Consolidated Resource Management Plan and the Tonopah Field Office Resource Management Plan Amendment, Nevada, 70253-70254 [2015-28876]
Download as PDF
70253
Federal Register / Vol. 80, No. 219 / Friday, November 13, 2015 / Notices
Dates & times
Locations
5 p.m. to 7 p.m. .......................
Elko Conference Center, 724 Moren Way, Elko, NV 89801 .................
The EIS will consider a No Action
alternative and consider reasonably
foreseeable mineral development
activities. The EIS does not support a
land-use plan or a land-use plan
amendment. It will provide a
comprehensive programmatic NEPA
analysis for the proposed action of the
Secretary of the Interior withdrawing
these public lands from operation of the
mining law for the conservation benefit
of the Greater Sage-grouse.
The BLM has initially identified the
following issues for analysis in this EIS:
Air quality/climate, American Indian
resources, cultural resources, wilderness
and wilderness characteristics, mineral
resources, public health and safety,
recreation, social and economic
conditions, soil resources, soundscapes,
special status species, vegetation
resources, visual resources, water
resources, and fish and wildlife habitat.
In addition, the BLM expects to
address economic effects of
withdrawing these public lands from
operation of the mining law, wildlife
habitat conservation; improvement,
restoration of ecosystem processes;
protection of cultural resources,
watershed and vegetative community
health, new listings of threatened and
endangered species and consideration of
other sensitive and special status
species.
Steve Ellis,
Deputy Director, Bureau of Land
Management.
[FR Doc. 2015–28877 Filed 11–12–15; 8:45 am]
BILLING CODE 4310–84–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
jstallworth on DSK7TPTVN1PROD with NOTICES
[LLNVC00000.L16100000.DR0000; 14–
08807; MO# 4500080864]
Opportunity To Comment on Changes
to the Nevada and California Greater
Sage-Grouse Bi-State Distinct
Population Segment Carson City Field
Office Consolidated Resource
Management Plan and the Tonopah
Field Office Resource Management
Plan Amendment, Nevada
Bureau of Land Management,
Interior.
ACTION: Notice.
AGENCY:
The Bureau of Land
Management (BLM) is soliciting
SUMMARY:
VerDate Sep<11>2014
15:03 Nov 12, 2015
BLM contact
Jkt 238001
comments on significant changes to the
Proposed Plan as set forth in the Greater
Sage-Grouse Bi-State Distinct
Population Segment (BSSG) Forest Plan
Amendment and Final Environmental
Impact Statement (EIS), announced on
February 13, 2015. Following
consideration of any comments on these
changes, the BLM intends to issue a
Record of Decision (ROD) amending the
Carson City Field Office Consolidated
Resource Management Plan and the
Tonopah Field Office Resource
Management Plan.
DATES: Written comments on the
changes to the Proposed Plan will be
accepted until December 14, 2015.
ADDRESSES: You may submit comments
related to the significant changes to the
Proposed Plan by any of the following
methods:
• Email: blm_nv_ccdowebmail@
blm.gov.
• Fax: 775–885–6147.
• Mail: BLM Carson City District,
Attn: Colleen Sievers, Project Manager,
5665 Morgan Mill Rd., Carson City, NV
89701.
FOR FURTHER INFORMATION CONTACT:
Colleen Sievers, Project Manager,
telephone: 775–885–6168; address: 5665
Morgan Mill Rd., Carson City, NV
89701; email: blm_nv_ccdowebmail@
blm.gov. Persons who use a
telecommunications device for the deaf
(TDD) may call the Federal Information
Relay Service (FIRS) at 1–800–877–8339
to contact the above individual during
normal business hours. The FIRS is
available 24 hours a day, 7 days a week,
to leave a message or question with the
above individual. You will receive a
reply during normal business hours.
SUPPLEMENTARY INFORMATION: The
United States Forest Service (USFS) was
the lead agency for preparing the BSSG
Forest Plan Amendment (Plan
Amendment) and Final EIS. As part of
that effort and based on the analysis in
the Final EIS, the BLM, a cooperating
agency, proposes to amend the Carson
City Field Office Consolidated Resource
Management Plan and the Tonopah
Field Office Resource Management Plan.
Following the release of the Proposed
Plan and the conclusion of the protest
process, the BLM identified changes and
a clarification for the Proposed Plan as
explained below and determined,
pursuant to the applicable authorities
(43 CFR 1610.2(f)(5) and 43 CFR
1610.5–1(b)), that public comment on
those measures is necessary. The
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
Steve Clutter, 775–861–6629.
environmental consequences of the
proposed changes and clarification have
been analyzed as part of the Plan
Amendment and Final EIS. After
considering any comments on these
changes, the BLM expects to issue a
ROD amending the Carson City Field
Office Consolidated Resource
Management Plan and the Tonopah
Field Office Resource Management Plan.
The Environmental Protection Agency
(EPA) published the Notice of
Availability (NOA) for the BSSG Forest
Plan Amendment/Draft EIS in the
Federal Register on August 23, 2013 (78
FR 52524), which initiated a 90-day
comment period. An NOA for the BSSG
Forest Plan Amendment/Revised Draft
EIS was published by the EPA on July
11, 2014 (79 FR 40100), which initiated
a second 90-day comment period. The
EPA published the NOA for the BSSG
Forest Plan Amendment and Final EIS
in the Federal Register on February 13,
2015 (80 FR 8081), which initiated a 30day BLM protest period and 60-day
Governors consistency review period.
The Plan Amendment and Final EIS
identified the BLM Plan as the Proposed
Plan. The BLM received three protest
letters. In response to those protests and
based on additional policy discussions,
the BLM has determined that it will
clarify and make changes to the
Proposed Plan.
The clarification and changes include:
(1) Identifying disturbance levels within
BSSG habitat; (2) Adjusting buffers for
tall structures near active or pending
leks; (3) Adding a restriction for new
high-power transmission lines; and (4)
Changing on-the-ground management
for habitat connectivity. This notice
identifies those clarifications and
changes and initiates a 30-day public
comment period (43 CFR 1610.2(f)(5)
and 43 CFR 1610.5–1(b)).
Habitat Disturbance—Proposed Change
The BLM is changing the Proposed
Plan, as it was set forth in the Plan
Amendment and Final EIS, to set a total
anthropogenic disturbance of no more
than 3 percent of the total BSSG habitat
on Federal lands within the Bodie
Mountain/Grant, Desert Creek/Fales,
and White Mountains population
management unit boundaries (C–Wild–
S–04), and a total anthropogenic
disturbance of no more than 1.5 percent
of the total BSSG habitat on Federal
lands within the Pine Nut Mountains
population management unit (PMU)
E:\FR\FM\13NON1.SGM
13NON1
70254
Federal Register / Vol. 80, No. 219 / Friday, November 13, 2015 / Notices
boundaries (C–Wild–S–05), due to
higher presence of risk factors in the
PMU as analyzed under Final EIS
Alternative C. This change is being
made in response to issues raised during
the protest period and based on
additional policy discussions.
Concerns were raised by the public
that the BLM action was not adequate to
protect BSSG and its habitat.
Disturbance levels identified in the
Final EIS will require site-specific
project mitigation to insure no
unmitigated net loss of habitat. This
requires assessing habitat availability at
the landscape scale.
Tall Structure Buffer—Proposed
Change
As part of the protest process, the
BLM found that it needed to correct an
error in the Proposed Plan Amendment
and Final EIS. The BLM found that it
should have identified the buffer
distance for tall structures as 4 miles
from active or pending leks. This is
consistent with management
prescriptions proposed by the USFS.
Specifically, the BLM proposes to adopt
the action from Alternative C which
states that tall structures, which could
serve as predator perches, will not be
authorized within 4 miles of an active
or pending lek (C–LUSU–S–04). The 4mile lek buffer accords with other
prescriptions of surface disturbance in
sage-grouse habitat and is consistent
with best science available.
jstallworth on DSK7TPTVN1PROD with NOTICES
High-Voltage (≥120kV) Transmission
Line—Proposed Change
The BLM is designating exclusion
areas for new high-power (≥120kV)
transmission lines in BSSG habitat.
Specifically, new high-power (≥120kV)
transmission line corridors, rights-ofway, facilities, or construction areas in
habitat (outside of existing corridors)
will not be authorized (C–Min–S–09).
This change is being made in response
to issues raised during the protest
period and based on additional policy
discussions and was analyzed under
Alternative C in the EIS.
Connectivity Habitat—Proposed Change
The BLM is clarifying language from
Alternative C to provide for
management of connectivity habitat.
The BSSG landscape is fragmented by
areas of agriculture and urbanization, as
well as areas of naturally occurring and
encroaching pinyon-juniper vegetation.
Sage-grouse habitats within and
between PMU are often separated by
stretches of unsuitable areas that may
inhibit sage-grouse movements across
the landscape. Alternative C provides a
limited amount of management
VerDate Sep<11>2014
15:03 Nov 12, 2015
Jkt 238001
direction to maintain or enhance
suitability of connective area.
Alternative C includes a goal about
habitat and movement and an objective
of improving degraded habitat,
including areas with conifer
encroachment (i.e., pinyon-juniper).
Actions and Best Management Practices
relating to connectivity apply primarily
to mineral uses. Alternative C states that
where valid existing rights exist, in
connective habitat areas, vegetation
characteristics suitable to sage-grouse
should be maintained to the extent
technically feasible (C–Min–S–01). In
addition, Alternative C provides
additional direction not specific to
connectivity which states, ‘‘Vegetation
treatments and post-disturbance
restoration should seed and/or
transplant sagebrush to restore large
patches of sagebrush cover and connect
existing patches’’ (C–Wild–S–02). Given
the fragmented nature of the bi-state
landscape and the level of apparent
isolation of subpopulations, additional
management direction for connective
habitat area is necessary to facilitate
sage-grouse movement, reduce isolation,
and increase genetic interchange
between subpopulations. This change is
being made in response to policy
discussions.
Please note that public comments and
information submitted including names,
street addresses, and email addresses of
persons who submit comments will be
available for public review and
disclosure at the above address during
regular business hours (7:30 a.m. to 4:30
p.m.), Monday through Friday, except
holidays.
Before including your address, phone
number, email address, or other
personal identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
While you can ask us in your comment
to withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Authority: 40 CFR 1506.6, 40 CFR 1506.10,
43 CFR 1610.2
John F. Ruhs,
Acting State Director, Nevada.
[FR Doc. 2015–28876 Filed 11–12–15; 8:45 am]
BILLING CODE 4310–HC–P
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLCA932000.L13400000.DQ0000.
LXSSB0020000.16X]
Notice of Availability of the Desert
Renewable Energy Conservation Plan
Proposed Land Use Plan Amendment
to the California Desert Conservation
Plan and the Bakersfield and Bishop
Resource Management Plans and Final
Environmental Impact Statement
Bureau of Land Management,
Interior.
ACTION: Notice.
AGENCY:
In accordance with the
National Environmental Policy Act of
1969, as amended, and the Federal Land
Policy and Management Act of 1976, as
amended (FLPMA), the Bureau of Land
Management (BLM) has prepared a
Proposed Land Use Plan Amendment
(LUPA) and Final Environmental Impact
Statement (EIS) for the Desert
Renewable Energy Conservation Plan
(DRECP). This LUPA would amend the
California Desert Conservation Area
(CDCA) Plan and the Bakersfield and
Bishop Resource Management Plans
(RMPs). By this notice, the BLM is
announcing the availability of the
Proposed LUPA and Final EIS.
DATES: BLM planning regulations state
that any person who meets the
conditions as described in the
regulations may protest the BLM’s
Proposed LUPA/Final EIS. A person
who meets the conditions and files a
protest must do so within 30 days of the
date that the Environmental Protection
Agency publishes its Notice of
Availability in the Federal Register.
ADDRESSES: Copies of the DRECP
Proposed LUPA and Final EIS have
been sent to affected Federal, State, and
local government agencies, affected
tribal governments, and to other
stakeholders. The Proposed LUPA and
Final EIS are available for review online
at www.drecp.org and www.blm.gov/ca/
drecp. See the SUPPLEMENTARY
INFORMATION section below for a list of
locations where copies of the Proposed
LUPA and Final EIS are available for
public inspection.
All protests must be in writing and
mailed to one of the following
addresses: Regular Mail: BLM Director
(210), Attention: Protest Coordinator,
P.O. Box 71383, Washington, DC 20024–
1383; Overnight Delivery: BLM Director
(210), Attention: Protest Coordinator, 20
M Street SE., Room 2134LM,
Washington, DC 20003.
FOR FURTHER INFORMATION CONTACT:
Vicki Campbell, Program Manager,
SUMMARY:
E:\FR\FM\13NON1.SGM
13NON1
Agencies
[Federal Register Volume 80, Number 219 (Friday, November 13, 2015)]
[Notices]
[Pages 70253-70254]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-28876]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLNVC00000.L16100000.DR0000; 14-08807; MO# 4500080864]
Opportunity To Comment on Changes to the Nevada and California
Greater Sage-Grouse Bi-State Distinct Population Segment Carson City
Field Office Consolidated Resource Management Plan and the Tonopah
Field Office Resource Management Plan Amendment, Nevada
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Bureau of Land Management (BLM) is soliciting comments on
significant changes to the Proposed Plan as set forth in the Greater
Sage-Grouse Bi-State Distinct Population Segment (BSSG) Forest Plan
Amendment and Final Environmental Impact Statement (EIS), announced on
February 13, 2015. Following consideration of any comments on these
changes, the BLM intends to issue a Record of Decision (ROD) amending
the Carson City Field Office Consolidated Resource Management Plan and
the Tonopah Field Office Resource Management Plan.
DATES: Written comments on the changes to the Proposed Plan will be
accepted until December 14, 2015.
ADDRESSES: You may submit comments related to the significant changes
to the Proposed Plan by any of the following methods:
Email: blm_nv_ccdowebmail@blm.gov.
Fax: 775-885-6147.
Mail: BLM Carson City District, Attn: Colleen Sievers,
Project Manager, 5665 Morgan Mill Rd., Carson City, NV 89701.
FOR FURTHER INFORMATION CONTACT: Colleen Sievers, Project Manager,
telephone: 775-885-6168; address: 5665 Morgan Mill Rd., Carson City, NV
89701; email: blm_nv_ccdowebmail@blm.gov. Persons who use a
telecommunications device for the deaf (TDD) may call the Federal
Information Relay Service (FIRS) at 1-800-877-8339 to contact the above
individual during normal business hours. The FIRS is available 24 hours
a day, 7 days a week, to leave a message or question with the above
individual. You will receive a reply during normal business hours.
SUPPLEMENTARY INFORMATION: The United States Forest Service (USFS) was
the lead agency for preparing the BSSG Forest Plan Amendment (Plan
Amendment) and Final EIS. As part of that effort and based on the
analysis in the Final EIS, the BLM, a cooperating agency, proposes to
amend the Carson City Field Office Consolidated Resource Management
Plan and the Tonopah Field Office Resource Management Plan. Following
the release of the Proposed Plan and the conclusion of the protest
process, the BLM identified changes and a clarification for the
Proposed Plan as explained below and determined, pursuant to the
applicable authorities (43 CFR 1610.2(f)(5) and 43 CFR 1610.5-1(b)),
that public comment on those measures is necessary. The environmental
consequences of the proposed changes and clarification have been
analyzed as part of the Plan Amendment and Final EIS. After considering
any comments on these changes, the BLM expects to issue a ROD amending
the Carson City Field Office Consolidated Resource Management Plan and
the Tonopah Field Office Resource Management Plan.
The Environmental Protection Agency (EPA) published the Notice of
Availability (NOA) for the BSSG Forest Plan Amendment/Draft EIS in the
Federal Register on August 23, 2013 (78 FR 52524), which initiated a
90-day comment period. An NOA for the BSSG Forest Plan Amendment/
Revised Draft EIS was published by the EPA on July 11, 2014 (79 FR
40100), which initiated a second 90-day comment period. The EPA
published the NOA for the BSSG Forest Plan Amendment and Final EIS in
the Federal Register on February 13, 2015 (80 FR 8081), which initiated
a 30-day BLM protest period and 60-day Governors consistency review
period. The Plan Amendment and Final EIS identified the BLM Plan as the
Proposed Plan. The BLM received three protest letters. In response to
those protests and based on additional policy discussions, the BLM has
determined that it will clarify and make changes to the Proposed Plan.
The clarification and changes include: (1) Identifying disturbance
levels within BSSG habitat; (2) Adjusting buffers for tall structures
near active or pending leks; (3) Adding a restriction for new high-
power transmission lines; and (4) Changing on-the-ground management for
habitat connectivity. This notice identifies those clarifications and
changes and initiates a 30-day public comment period (43 CFR
1610.2(f)(5) and 43 CFR 1610.5-1(b)).
Habitat Disturbance--Proposed Change
The BLM is changing the Proposed Plan, as it was set forth in the
Plan Amendment and Final EIS, to set a total anthropogenic disturbance
of no more than 3 percent of the total BSSG habitat on Federal lands
within the Bodie Mountain/Grant, Desert Creek/Fales, and White
Mountains population management unit boundaries (C-Wild-S-04), and a
total anthropogenic disturbance of no more than 1.5 percent of the
total BSSG habitat on Federal lands within the Pine Nut Mountains
population management unit (PMU)
[[Page 70254]]
boundaries (C-Wild-S-05), due to higher presence of risk factors in the
PMU as analyzed under Final EIS Alternative C. This change is being
made in response to issues raised during the protest period and based
on additional policy discussions.
Concerns were raised by the public that the BLM action was not
adequate to protect BSSG and its habitat. Disturbance levels identified
in the Final EIS will require site-specific project mitigation to
insure no unmitigated net loss of habitat. This requires assessing
habitat availability at the landscape scale.
Tall Structure Buffer--Proposed Change
As part of the protest process, the BLM found that it needed to
correct an error in the Proposed Plan Amendment and Final EIS. The BLM
found that it should have identified the buffer distance for tall
structures as 4 miles from active or pending leks. This is consistent
with management prescriptions proposed by the USFS. Specifically, the
BLM proposes to adopt the action from Alternative C which states that
tall structures, which could serve as predator perches, will not be
authorized within 4 miles of an active or pending lek (C-LUSU-S-04).
The 4-mile lek buffer accords with other prescriptions of surface
disturbance in sage-grouse habitat and is consistent with best science
available.
High-Voltage (>=120kV) Transmission Line--Proposed Change
The BLM is designating exclusion areas for new high-power (>=120kV)
transmission lines in BSSG habitat. Specifically, new high-power
(>=120kV) transmission line corridors, rights-of-way, facilities, or
construction areas in habitat (outside of existing corridors) will not
be authorized (C-Min-S-09). This change is being made in response to
issues raised during the protest period and based on additional policy
discussions and was analyzed under Alternative C in the EIS.
Connectivity Habitat--Proposed Change
The BLM is clarifying language from Alternative C to provide for
management of connectivity habitat. The BSSG landscape is fragmented by
areas of agriculture and urbanization, as well as areas of naturally
occurring and encroaching pinyon-juniper vegetation. Sage-grouse
habitats within and between PMU are often separated by stretches of
unsuitable areas that may inhibit sage-grouse movements across the
landscape. Alternative C provides a limited amount of management
direction to maintain or enhance suitability of connective area.
Alternative C includes a goal about habitat and movement and an
objective of improving degraded habitat, including areas with conifer
encroachment (i.e., pinyon-juniper). Actions and Best Management
Practices relating to connectivity apply primarily to mineral uses.
Alternative C states that where valid existing rights exist, in
connective habitat areas, vegetation characteristics suitable to sage-
grouse should be maintained to the extent technically feasible (C-Min-
S-01). In addition, Alternative C provides additional direction not
specific to connectivity which states, ``Vegetation treatments and
post-disturbance restoration should seed and/or transplant sagebrush to
restore large patches of sagebrush cover and connect existing patches''
(C-Wild-S-02). Given the fragmented nature of the bi-state landscape
and the level of apparent isolation of subpopulations, additional
management direction for connective habitat area is necessary to
facilitate sage-grouse movement, reduce isolation, and increase genetic
interchange between subpopulations. This change is being made in
response to policy discussions.
Please note that public comments and information submitted
including names, street addresses, and email addresses of persons who
submit comments will be available for public review and disclosure at
the above address during regular business hours (7:30 a.m. to 4:30
p.m.), Monday through Friday, except holidays.
Before including your address, phone number, email address, or
other personal identifying information in your comment, you should be
aware that your entire comment--including your personal identifying
information--may be made publicly available at any time. While you can
ask us in your comment to withhold your personal identifying
information from public review, we cannot guarantee that we will be
able to do so.
Authority: 40 CFR 1506.6, 40 CFR 1506.10, 43 CFR 1610.2
John F. Ruhs,
Acting State Director, Nevada.
[FR Doc. 2015-28876 Filed 11-12-15; 8:45 am]
BILLING CODE 4310-HC-P