FirstLight Hydro Generation Company; Notice of Availability of Environmental Assessment, 69209-69210 [2015-28428]
Download as PDF
Federal Register / Vol. 80, No. 216 / Monday, November 9, 2015 / Notices
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 2, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on November 18, 2015.
Dated: November 2, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–28392 Filed 11–6–15; 8:45 am]
[FR Doc. 2015–28397 Filed 11–6–15; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 13877–003]
City of Vernon, California; Notice of
Filing
srobinson on DSK5SPTVN1PROD with NOTICES
[Docket No. NJ16–1–000]
Mahoning Hydropower, LLC; Notice of
Surrender of Preliminary Permit
Take notice that on October 28, 2015,
City of Vernon, California submitted its
tariff filing: Filing 2016 Transmission
Revenue Requirement and Transmission
Revenue Balancing Account
Adjustment, to be effective 1/1/2016.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
Take notice that Mahoning
Hydropower, LLC, permittee for the
proposed Stonewall Jackson
Hydroelectric Project, has requested that
its preliminary permit be terminated.
The permit was issued on April 1,
2011,1 extended on March 20, 2014 for
an additional two years,2 and would
have expired on March 31, 2016. The
project would have been located at the
existing U.S. Army Corps of Engineers’
Stonewall Jackson Dam on the West
Fork River in Lewis County, West
Virginia.
The preliminary permit for Project
No. 13877 will remain in effect until the
close of business, December 2, 2015.
But, if the Commission is closed on this
day, then the permit remains in effect
until the close of business on the next
day in which the Commission is open.3
New applications for this site may not
be submitted until after the permit
surrender is effective.
VerDate Sep<11>2014
19:52 Nov 06, 2015
Jkt 238001
Dated: November 2, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–28393 Filed 11–6–15; 8:45 am]
BILLING CODE 6717–01–P
1 135
FERC ¶ 62,001 (2011).
FERC ¶ 62,194 (2014).
3 18 CFR 385.2007(a)(2) (2015).
2 146
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
69209
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2662–027]
FirstLight Hydro Generation Company;
Notice of Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission (Commission) regulations,
18 CFR part 380 (Order No. 486, 52 FR
47897), the Office of Energy Projects has
reviewed an application submitted by
FirstLight Hydro Generation Company
(licensee) to amend the license for the
Scotland Hydroelectric Project (FERC
No. 2662). The project is located on the
Shetucket River in Windham County,
Connecticut.
An Environmental Assessment (EA)
has been prepared as part of
Commission staff’s review of the
proposal. In the application, the
licensee proposes to install a variable
pitch Kaplan runner in order to comply
with run-of-river operations. The project
license currently authorizes the
installation of a 1.026 megawatt (MW)
low flow turbine, to comply with runof-river operational requirements that
would have increased the project’s
capacity from 2.0 MW to 3.026 MW.
This EA contains Commission staff’s
analysis of the probable environmental
impacts of the proposed amendment
and concludes that approval of the
proposal would not constitute a major
federal action significantly affecting the
quality of the human environment.
The EA is available for electronic
review and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426. The EA may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number (P–2662) in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at (866) 208–3372 or
for TTY, (202) 502–8659.
Any comments on the EA should be
filed by December 3, 2015 and should
be addressed to the Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Room 1–A,
Washington, DC 20426. Please reference
the project name and project number
(P–2662–027) on all comments.
Comments may be filed electronically
via the Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
E:\FR\FM\09NON1.SGM
09NON1
69210
Federal Register / Vol. 80, No. 216 / Monday, November 9, 2015 / Notices
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link.
For further information, contact Alicia
Burtner at (202) 502–8038 or by email
at Alicia.Burtner@ferc.gov.
Dated: November 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–28428 Filed 11–6–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL16–4–000]
CPV Shore, LLC; Notice of Institution
of Section 206 Proceeding and Refund
Effective Date
On November 3, 2015, the
Commission issued an order in Docket
No. EL16–4–000, pursuant to section
206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an
investigation into the justness and
reasonableness of CPV Shore, LLC’s
Reactive Power Tariff. CPV Shore, LLC,
153 FERC ¶ 61,139 (2015).
The refund effective date in Docket
No. EL16–4–000, established pursuant
to section 206(b) of the FPA, will be
January 1, 2016.
Dated: November 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–28422 Filed 11–6–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
srobinson on DSK5SPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC16–19–000.
Applicants: Calpine Granite Holdings,
LLC, Granite Ridge Energy, LLC.
Description: Calpine Granite
Holdings, LLC et al submits the
workpapers of Julie Solomon re the
application for approval under Section
203 of the Federal Power Act etc.
Filed Date: 10/28/15.
Accession Number: 20151028–0056.
Comments Due: 5 p.m. ET 12/28/15.
Docket Numbers: EC16–22–000.
Applicants: Roosevelt Wind Project,
LLC, Milo Wind Project, LLC.
Description: Application for
Authorization for Disposition of
VerDate Sep<11>2014
19:52 Nov 06, 2015
Jkt 238001
Jurisdictional Facilities and Requests for
Confidential Treatment and Expedited
Action of Roosevelt Wind Project, LLC,
and Milo Wind Project, LLC.
Filed Date: 10/30/15.
Accession Number: 20151030–5502.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: EC16–23–000.
Applicants: Prairie Rose Wind, LLC,
Prairie Rose Transmission, LLC.
Description: Application of Prairie
Rose Wind, LLC, et al. for Authorization
Under Section 203 of the Federal Power
Act, Request for Expedited
Consideration and Confidential
Treatment.
Filed Date: 10/30/15.
Accession Number: 20151030–5519.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: EC16–24–000.
Applicants: Chisholm View Wind
Project, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, Request for
Expedited Consideration and
Confidential Treatment of Chisholm
View Wind Project, LLC.
Filed Date: 10/30/15.
Accession Number: 20151030–5520.
Comments Due: 5 p.m. ET 11/20/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–193–006.
Applicants: ISO New England Inc.
Description: Compliance filing:
Amendments to ISO–NE Tariff and TOA
in Compliance with October 2, 2015
Order to be effective 5/18/2015.
Filed Date: 11/2/15.
Accession Number: 20151102–5124.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER13–196–005.
Applicants: ISO New England Inc.,
Eversource Energy Service Company (as
agent).
Description: Compliance filing:
Amendments to the TOA in Compliance
with October 2, 2015 Order to be
effective 5/18/2015.
Filed Date: 11/2/15.
Accession Number: 20151102–5126.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER13–1908–001.
Applicants: Virginia Electric and
Power Company.
Description: Notice of material change
in circumstances of Virginia Electric
and Power Company and its marketing
affiliates.
Filed Date: 10/30/15.
Accession Number: 20151030–5507.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: ER15–1825–002.
Applicants: California Independent
System Operator Corporation.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Description: Compliance filing: 2015–
11–02_RSI_Phase1A_Compliance Filing
to be effective 1/10/2016.
Filed Date: 11/2/15.
Accession Number: 20151102–5139.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16–229–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2646R1 Kansas Municipal Energy
Agency NITSA NOA to be effective 10/
1/2015.
Filed Date: 11/2/15.
Accession Number: 20151102–5108.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16–230–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1067R5 ETEC NITSA; Cancellation of
1065R4 Tex-La NITA and 1066R7 NTEC
NITSA to be effective 10/1/2015.
Filed Date: 11/2/15.
Accession Number: 20151102–5109.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16–231–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3082
Minnkota Power Cooperative, Inc.
NITSA and NOA to be effective 10/1/
2015.
Filed Date: 11/2/15.
Accession Number: 20151102–5123.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16–232–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3124
Basin Electric Power Cooperative
NITSA and NOA to be effective 10/1/
2015.
Filed Date: 11/2/15.
Accession Number: 20151102–5166.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16–233–000.
Applicants: Illinois Power Resources
Generating, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession for Reactive
Service Rate Schedule to be effective 1/
1/2016.
Filed Date: 11/2/15.
Accession Number: 20151102–5167.
Comments Due: 5 p.m. ET 11/23/15.
Take notice that the Commission
received the following land acquisition
reports:
Docket Numbers: LA15–3–000.
Applicants: Adelanto Solar, LLC,
Adelanto Solar II, LLC, Ashtabula Wind,
LLC, Ashtabula Wind II, LLC, Ashtabula
Wind III, LLC, Backbone Mountain
Windpower, LLC, Baldwin Wind, LLC,
Bayswater Peaking Facility, LLC,
Blackwell Wind, LLC, Breckinridge
E:\FR\FM\09NON1.SGM
09NON1
Agencies
[Federal Register Volume 80, Number 216 (Monday, November 9, 2015)]
[Notices]
[Pages 69209-69210]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-28428]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2662-027]
FirstLight Hydro Generation Company; Notice of Availability of
Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission (Commission) regulations,
18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy
Projects has reviewed an application submitted by FirstLight Hydro
Generation Company (licensee) to amend the license for the Scotland
Hydroelectric Project (FERC No. 2662). The project is located on the
Shetucket River in Windham County, Connecticut.
An Environmental Assessment (EA) has been prepared as part of
Commission staff's review of the proposal. In the application, the
licensee proposes to install a variable pitch Kaplan runner in order to
comply with run-of-river operations. The project license currently
authorizes the installation of a 1.026 megawatt (MW) low flow turbine,
to comply with run-of-river operational requirements that would have
increased the project's capacity from 2.0 MW to 3.026 MW. This EA
contains Commission staff's analysis of the probable environmental
impacts of the proposed amendment and concludes that approval of the
proposal would not constitute a major federal action significantly
affecting the quality of the human environment.
The EA is available for electronic review and reproduction at the
Commission's Public Reference Room, located at 888 First Street NE.,
Room 2A, Washington, DC 20426. The EA may also be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number (P-2662) in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3372 or for TTY,
(202) 502-8659.
Any comments on the EA should be filed by December 3, 2015 and
should be addressed to the Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room 1-A, Washington, DC 20426.
Please reference the project name and project number (P-2662-027) on
all comments. Comments may be filed electronically via the Internet in
lieu of paper. The Commission strongly encourages electronic filings.
See 18 CFR
[[Page 69210]]
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``eFiling'' link.
For further information, contact Alicia Burtner at (202) 502-8038
or by email at Alicia.Burtner@ferc.gov.
Dated: November 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-28428 Filed 11-6-15; 8:45 am]
BILLING CODE 6717-01-P