Big Sandy Peaker Plant, LLC, Wolf Hills Energy, LLC, Crete Energy Venture, LLC, Lincoln Generating Facility, LLC, Rolling Hills Generating, L.L.C. v. PJM Interconnection, L.L.C.; Notice of Complaint, 69204-69205 [2015-28424]
Download as PDF
69204
Federal Register / Vol. 80, No. 216 / Monday, November 9, 2015 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–11–000]
srobinson on DSK5SPTVN1PROD with NOTICES
Transwestern Pipeline Company, LLC;
Notice of Prior Notice Request Under
Blanket Authorization
Take notice that on October 23, 2015,
Transwestern Pipeline Company, LLC
(Transwestern) filed in Docket No.
CP16–11–000, a prior notice request
pursuant to sections 157.205, 157.206,
157.208 and 157.210 subpart F blanket
certificate of the Federal Energy
Regulatory Commission’s (Commission)
regulations under the Natural Gas Act
(NGA) and Transwestern’s blanket
authorizations issued in Docket Nos.
CP82–534–000, CP88–133–000.
Southwest seeks authorization to
construct, own, operate, and maintain
14.67 miles of 16-inch pipeline, one
meter station, and other ancillary
facilities in Eddy and Lea Counties,
New Mexico, to receive up to 200,000
Mcf per day of natural gas from a new
cryogenic natural gas processing plant,
as part of the Malaga Lateral Project
(Project) in Eddy County, New Mexico,
all as more fully set forth in the
application which is on file with the
Commission and open for public
inspection. The cost of the Project is
estimated to be $23 million. The filing
may also be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions concerning this
application may be directed to: Mr.
Kelly Allen, Manager, Certificates and
Reporting, Transwestern Pipeline
Company, LLC, 1300 Main Street,
Houston, Texas 77002, by phone at
(713) 989–2606, or fax (713) 989–1205
or email at Kelly.Allen@
energytransfer.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
VerDate Sep<11>2014
19:52 Nov 06, 2015
Jkt 238001
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit an original and 5 copies of the
protest or intervention to the Federal
Energy regulatory Commission, 888
First Street NE., Washington, DC 20426.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
Dated: November 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–28420 Filed 11–6–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL16–9–000]
Big Sandy Peaker Plant, LLC, Wolf
Hills Energy, LLC, Crete Energy
Venture, LLC, Lincoln Generating
Facility, LLC, Rolling Hills Generating,
L.L.C. v. PJM Interconnection, L.L.C.;
Notice of Complaint
Take notice that on November 3,
2015, pursuant to sections 206 and 306
of the Federal Power Act, 16 U.S.C. 824e
and 825e (2012) and Rule 206 of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 385.206
(2015), Big Sandy Peaker Plant, LLC,
Wolf Hills Energy, LLC, Crete Energy
Venture, LLC, Lincoln Generating
Facility, LLC, and Rolling Hills
Generating, L.L.C., (collectively
Complainants) filed a complaint against
PJM Interconnection, L.L.C. (PJM or
Respondent) alleging that PJM violated
its Open Access Transmission Tariff and
acted in contravention of the filed rate
doctrine by finding that the generation
units owned and operated by the
Complainants were not eligible to
provide Tier 1 Synchronized Reserve
effective retroactively to October 1,
2013, and by invoicing the
Complainants for adjustments to
payments previously made by PJM to
the Complainants for providing Tier 1
Synchronized Reserve during the period
from October 1, 2013 to July 1, 2014, all
as more fully explained in the
complaint.
The Complainant certifies that copies
of the complaint were served on the
contacts for the Respondent as listed on
the Commission’s list of corporate
officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
E:\FR\FM\09NON1.SGM
09NON1
Federal Register / Vol. 80, No. 216 / Monday, November 9, 2015 / Notices
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on December 3, 2015.
Dated: November 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–28424 Filed 11–6–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
srobinson on DSK5SPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC16–25–000.
Applicants: Florida Power & Light
Company.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act and Request for
Expedited Action of Florida Power &
Light Company.
Filed Date: 11/2/15.
Accession Number: 20151102–5263.
Comments Due: 5 p.m. ET 11/23/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1484–012.
Applicants: Shell Energy North
America (US), L.P.
Description: Notice of Non-Material
Change in Status of Shell Energy North
America (US), L.P.
Filed Date: 11/2/15.
VerDate Sep<11>2014
19:52 Nov 06, 2015
Jkt 238001
Accession Number: 20151102–5298.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER10–2806–002;
ER10–2818–002; ER10–2847–002;
ER14–963–002; ER13–2386–005.
Applicants: TransAlta Energy
Marketing (U.S.) Inc., TransAlta Energy
Marketing Corporation, TransAlta
Centralia Generation LLC, TransAlta
Wyoming Wind LLC, Lakeswind Power
Partners, LLC.
Description: Notice of Change in
Status of the TransAlta MBR Entities.
Filed Date: 11/2/15.
Accession Number: 20151102–5267.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER15–1453–000.
Applicants: Entergy Arkansas, Inc.,
Entergy Gulf States Louisiana, L.L.C.,
Entergy Louisiana, LLC, Entergy
Mississippi, Inc., Entergy New Orleans,
Inc., Entergy Texas, Inc.
Description: Supplement to April 1,
2015 Application of Entergy Services,
Inc., on behalf of the Entergy Operating
Companies with actual 2014 PBOP
amounts to be included in the 2015
formula rate update.
Filed Date: 10/30/15.
Accession Number: 20151030–5253.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: ER16–243–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of Service
Agreement No. 3105 (PJM–DP&L
NITSA) to be effective 1/1/2016.
Filed Date: 11/2/15.
Accession Number: 20151102–5245.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16–244–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) Rate
Filing: 3095 Missouri River Energy
Services NITSA and NOA to be effective
10/1/2015.
Filed Date: 11/2/15.
Accession Number: 20151102–5248.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16–245–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) Rate
Filing: 3126 WAPA NITSA and NOA to
be effective 10/1/2015.
Filed Date: 11/2/15.
Accession Number: 20151102–5254.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16–246–000.
Applicants: Golden Spread Electric
Cooperative, Inc.
Description: Section 205(d) Rate
Filing: WPC 2016 Amendment Filing to
be effective 1/1/2016.
Filed Date: 11/2/15.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
69205
Accession Number: 20151102–5255.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16–247–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) Rate
Filing: 3127 Montana-Dakota Utilities
Co. NITSA and NOA to be effective 10/
1/2015.
Filed Date: 11/2/15.
Accession Number: 20151102–5260.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16–248–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Request for Waiver of
Midcontinent Independent System
Operator, Inc.
Filed Date: 11/2/15.
Accession Number: 20151102–5302.
Comments Due: 5 p.m. ET 11/23/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–28418 Filed 11–6–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings–2
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP16–91–000.
Applicants: Southern Star Central Gas
Pipeline, Inc.
Description: Section 4(d) Rate Filing:
Auction Procedures MBR Storage Filing
to be effective 12/1/2015.
E:\FR\FM\09NON1.SGM
09NON1
Agencies
[Federal Register Volume 80, Number 216 (Monday, November 9, 2015)]
[Notices]
[Pages 69204-69205]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-28424]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL16-9-000]
Big Sandy Peaker Plant, LLC, Wolf Hills Energy, LLC, Crete Energy
Venture, LLC, Lincoln Generating Facility, LLC, Rolling Hills
Generating, L.L.C. v. PJM Interconnection, L.L.C.; Notice of Complaint
Take notice that on November 3, 2015, pursuant to sections 206 and
306 of the Federal Power Act, 16 U.S.C. 824e and 825e (2012) and Rule
206 of the Federal Energy Regulatory Commission's (Commission) Rules of
Practice and Procedure, 18 CFR 385.206 (2015), Big Sandy Peaker Plant,
LLC, Wolf Hills Energy, LLC, Crete Energy Venture, LLC, Lincoln
Generating Facility, LLC, and Rolling Hills Generating, L.L.C.,
(collectively Complainants) filed a complaint against PJM
Interconnection, L.L.C. (PJM or Respondent) alleging that PJM violated
its Open Access Transmission Tariff and acted in contravention of the
filed rate doctrine by finding that the generation units owned and
operated by the Complainants were not eligible to provide Tier 1
Synchronized Reserve effective retroactively to October 1, 2013, and by
invoicing the Complainants for adjustments to payments previously made
by PJM to the Complainants for providing Tier 1 Synchronized Reserve
during the period from October 1, 2013 to July 1, 2014, all as more
fully explained in the complaint.
The Complainant certifies that copies of the complaint were served
on the contacts for the Respondent as listed on the Commission's list
of corporate officials.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. The Respondent's
answer and all interventions, or protests must
[[Page 69205]]
be filed on or before the comment date. The Respondent's answer,
motions to intervene, and protests must be served on the Complainants.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
``eSubscription'' link on the Web site that enables subscribers to
receive email notification when a document is added to a subscribed
docket(s). For assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on December 3, 2015.
Dated: November 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-28424 Filed 11-6-15; 8:45 am]
BILLING CODE 6717-01-P