Download as PDF 69204 Federal Register / Vol. 80, No. 216 / Monday, November 9, 2015 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP16–11–000] srobinson on DSK5SPTVN1PROD with NOTICES Transwestern Pipeline Company, LLC; Notice of Prior Notice Request Under Blanket Authorization Take notice that on October 23, 2015, Transwestern Pipeline Company, LLC (Transwestern) filed in Docket No. CP16–11–000, a prior notice request pursuant to sections 157.205, 157.206, 157.208 and 157.210 subpart F blanket certificate of the Federal Energy Regulatory Commission’s (Commission) regulations under the Natural Gas Act (NGA) and Transwestern’s blanket authorizations issued in Docket Nos. CP82–534–000, CP88–133–000. Southwest seeks authorization to construct, own, operate, and maintain 14.67 miles of 16-inch pipeline, one meter station, and other ancillary facilities in Eddy and Lea Counties, New Mexico, to receive up to 200,000 Mcf per day of natural gas from a new cryogenic natural gas processing plant, as part of the Malaga Lateral Project (Project) in Eddy County, New Mexico, all as more fully set forth in the application which is on file with the Commission and open for public inspection. The cost of the Project is estimated to be $23 million. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions concerning this application may be directed to: Mr. Kelly Allen, Manager, Certificates and Reporting, Transwestern Pipeline Company, LLC, 1300 Main Street, Houston, Texas 77002, by phone at (713) 989–2606, or fax (713) 989–1205 or email at Kelly.Allen@ energytransfer.com. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the VerDate Sep<11>2014 19:52 Nov 06, 2015 Jkt 238001 time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 Dated: November 3, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–28420 Filed 11–6–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL16–9–000] Big Sandy Peaker Plant, LLC, Wolf Hills Energy, LLC, Crete Energy Venture, LLC, Lincoln Generating Facility, LLC, Rolling Hills Generating, L.L.C. v. PJM Interconnection, L.L.C.; Notice of Complaint Take notice that on November 3, 2015, pursuant to sections 206 and 306 of the Federal Power Act, 16 U.S.C. 824e and 825e (2012) and Rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206 (2015), Big Sandy Peaker Plant, LLC, Wolf Hills Energy, LLC, Crete Energy Venture, LLC, Lincoln Generating Facility, LLC, and Rolling Hills Generating, L.L.C., (collectively Complainants) filed a complaint against PJM Interconnection, L.L.C. (PJM or Respondent) alleging that PJM violated its Open Access Transmission Tariff and acted in contravention of the filed rate doctrine by finding that the generation units owned and operated by the Complainants were not eligible to provide Tier 1 Synchronized Reserve effective retroactively to October 1, 2013, and by invoicing the Complainants for adjustments to payments previously made by PJM to the Complainants for providing Tier 1 Synchronized Reserve during the period from October 1, 2013 to July 1, 2014, all as more fully explained in the complaint. The Complainant certifies that copies of the complaint were served on the contacts for the Respondent as listed on the Commission’s list of corporate officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must E:\FR\FM\09NON1.SGM 09NON1 Federal Register / Vol. 80, No. 216 / Monday, November 9, 2015 / Notices be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on December 3, 2015. Dated: November 3, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–28424 Filed 11–6–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission srobinson on DSK5SPTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC16–25–000. Applicants: Florida Power & Light Company. Description: Application for Authorization Under Section 203 of the Federal Power Act and Request for Expedited Action of Florida Power & Light Company. Filed Date: 11/2/15. Accession Number: 20151102–5263. Comments Due: 5 p.m. ET 11/23/15. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1484–012. Applicants: Shell Energy North America (US), L.P. Description: Notice of Non-Material Change in Status of Shell Energy North America (US), L.P. Filed Date: 11/2/15. VerDate Sep<11>2014 19:52 Nov 06, 2015 Jkt 238001 Accession Number: 20151102–5298. Comments Due: 5 p.m. ET 11/23/15. Docket Numbers: ER10–2806–002; ER10–2818–002; ER10–2847–002; ER14–963–002; ER13–2386–005. Applicants: TransAlta Energy Marketing (U.S.) Inc., TransAlta Energy Marketing Corporation, TransAlta Centralia Generation LLC, TransAlta Wyoming Wind LLC, Lakeswind Power Partners, LLC. Description: Notice of Change in Status of the TransAlta MBR Entities. Filed Date: 11/2/15. Accession Number: 20151102–5267. Comments Due: 5 p.m. ET 11/23/15. Docket Numbers: ER15–1453–000. Applicants: Entergy Arkansas, Inc., Entergy Gulf States Louisiana, L.L.C., Entergy Louisiana, LLC, Entergy Mississippi, Inc., Entergy New Orleans, Inc., Entergy Texas, Inc. Description: Supplement to April 1, 2015 Application of Entergy Services, Inc., on behalf of the Entergy Operating Companies with actual 2014 PBOP amounts to be included in the 2015 formula rate update. Filed Date: 10/30/15. Accession Number: 20151030–5253. Comments Due: 5 p.m. ET 11/20/15. Docket Numbers: ER16–243–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of Service Agreement No. 3105 (PJM–DP&L NITSA) to be effective 1/1/2016. Filed Date: 11/2/15. Accession Number: 20151102–5245. Comments Due: 5 p.m. ET 11/23/15. Docket Numbers: ER16–244–000. Applicants: Southwest Power Pool, Inc. Description: Section 205(d) Rate Filing: 3095 Missouri River Energy Services NITSA and NOA to be effective 10/1/2015. Filed Date: 11/2/15. Accession Number: 20151102–5248. Comments Due: 5 p.m. ET 11/23/15. Docket Numbers: ER16–245–000. Applicants: Southwest Power Pool, Inc. Description: Section 205(d) Rate Filing: 3126 WAPA NITSA and NOA to be effective 10/1/2015. Filed Date: 11/2/15. Accession Number: 20151102–5254. Comments Due: 5 p.m. ET 11/23/15. Docket Numbers: ER16–246–000. Applicants: Golden Spread Electric Cooperative, Inc. Description: Section 205(d) Rate Filing: WPC 2016 Amendment Filing to be effective 1/1/2016. Filed Date: 11/2/15. PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 69205 Accession Number: 20151102–5255. Comments Due: 5 p.m. ET 11/23/15. Docket Numbers: ER16–247–000. Applicants: Southwest Power Pool, Inc. Description: Section 205(d) Rate Filing: 3127 Montana-Dakota Utilities Co. NITSA and NOA to be effective 10/ 1/2015. Filed Date: 11/2/15. Accession Number: 20151102–5260. Comments Due: 5 p.m. ET 11/23/15. Docket Numbers: ER16–248–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Request for Waiver of Midcontinent Independent System Operator, Inc. Filed Date: 11/2/15. Accession Number: 20151102–5302. Comments Due: 5 p.m. ET 11/23/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 3, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–28418 Filed 11–6–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings–2 Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP16–91–000. Applicants: Southern Star Central Gas Pipeline, Inc. Description: Section 4(d) Rate Filing: Auction Procedures MBR Storage Filing to be effective 12/1/2015. E:\FR\FM\09NON1.SGM 09NON1

Agencies

[Federal Register Volume 80, Number 216 (Monday, November 9, 2015)]
[Notices]
[Pages 69204-69205]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-28424]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL16-9-000]


Big Sandy Peaker Plant, LLC, Wolf Hills Energy, LLC, Crete Energy 
Venture, LLC, Lincoln Generating Facility, LLC, Rolling Hills 
Generating, L.L.C. v. PJM Interconnection, L.L.C.; Notice of Complaint

    Take notice that on November 3, 2015, pursuant to sections 206 and 
306 of the Federal Power Act, 16 U.S.C. 824e and 825e (2012) and Rule 
206 of the Federal Energy Regulatory Commission's (Commission) Rules of 
Practice and Procedure, 18 CFR 385.206 (2015), Big Sandy Peaker Plant, 
LLC, Wolf Hills Energy, LLC, Crete Energy Venture, LLC, Lincoln 
Generating Facility, LLC, and Rolling Hills Generating, L.L.C., 
(collectively Complainants) filed a complaint against PJM 
Interconnection, L.L.C. (PJM or Respondent) alleging that PJM violated 
its Open Access Transmission Tariff and acted in contravention of the 
filed rate doctrine by finding that the generation units owned and 
operated by the Complainants were not eligible to provide Tier 1 
Synchronized Reserve effective retroactively to October 1, 2013, and by 
invoicing the Complainants for adjustments to payments previously made 
by PJM to the Complainants for providing Tier 1 Synchronized Reserve 
during the period from October 1, 2013 to July 1, 2014, all as more 
fully explained in the complaint.
    The Complainant certifies that copies of the complaint were served 
on the contacts for the Respondent as listed on the Commission's list 
of corporate officials.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondent's 
answer and all interventions, or protests must

[[Page 69205]]

be filed on or before the comment date. The Respondent's answer, 
motions to intervene, and protests must be served on the Complainants.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
``eSubscription'' link on the Web site that enables subscribers to 
receive email notification when a document is added to a subscribed 
docket(s). For assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on December 3, 2015.

    Dated: November 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-28424 Filed 11-6-15; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.