Combined Notice of Filings #2, 69210-69211 [2015-28396]
Download as PDF
69210
Federal Register / Vol. 80, No. 216 / Monday, November 9, 2015 / Notices
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link.
For further information, contact Alicia
Burtner at (202) 502–8038 or by email
at Alicia.Burtner@ferc.gov.
Dated: November 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–28428 Filed 11–6–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL16–4–000]
CPV Shore, LLC; Notice of Institution
of Section 206 Proceeding and Refund
Effective Date
On November 3, 2015, the
Commission issued an order in Docket
No. EL16–4–000, pursuant to section
206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an
investigation into the justness and
reasonableness of CPV Shore, LLC’s
Reactive Power Tariff. CPV Shore, LLC,
153 FERC ¶ 61,139 (2015).
The refund effective date in Docket
No. EL16–4–000, established pursuant
to section 206(b) of the FPA, will be
January 1, 2016.
Dated: November 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–28422 Filed 11–6–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
srobinson on DSK5SPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC16–19–000.
Applicants: Calpine Granite Holdings,
LLC, Granite Ridge Energy, LLC.
Description: Calpine Granite
Holdings, LLC et al submits the
workpapers of Julie Solomon re the
application for approval under Section
203 of the Federal Power Act etc.
Filed Date: 10/28/15.
Accession Number: 20151028–0056.
Comments Due: 5 p.m. ET 12/28/15.
Docket Numbers: EC16–22–000.
Applicants: Roosevelt Wind Project,
LLC, Milo Wind Project, LLC.
Description: Application for
Authorization for Disposition of
VerDate Sep<11>2014
19:52 Nov 06, 2015
Jkt 238001
Jurisdictional Facilities and Requests for
Confidential Treatment and Expedited
Action of Roosevelt Wind Project, LLC,
and Milo Wind Project, LLC.
Filed Date: 10/30/15.
Accession Number: 20151030–5502.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: EC16–23–000.
Applicants: Prairie Rose Wind, LLC,
Prairie Rose Transmission, LLC.
Description: Application of Prairie
Rose Wind, LLC, et al. for Authorization
Under Section 203 of the Federal Power
Act, Request for Expedited
Consideration and Confidential
Treatment.
Filed Date: 10/30/15.
Accession Number: 20151030–5519.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: EC16–24–000.
Applicants: Chisholm View Wind
Project, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, Request for
Expedited Consideration and
Confidential Treatment of Chisholm
View Wind Project, LLC.
Filed Date: 10/30/15.
Accession Number: 20151030–5520.
Comments Due: 5 p.m. ET 11/20/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–193–006.
Applicants: ISO New England Inc.
Description: Compliance filing:
Amendments to ISO–NE Tariff and TOA
in Compliance with October 2, 2015
Order to be effective 5/18/2015.
Filed Date: 11/2/15.
Accession Number: 20151102–5124.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER13–196–005.
Applicants: ISO New England Inc.,
Eversource Energy Service Company (as
agent).
Description: Compliance filing:
Amendments to the TOA in Compliance
with October 2, 2015 Order to be
effective 5/18/2015.
Filed Date: 11/2/15.
Accession Number: 20151102–5126.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER13–1908–001.
Applicants: Virginia Electric and
Power Company.
Description: Notice of material change
in circumstances of Virginia Electric
and Power Company and its marketing
affiliates.
Filed Date: 10/30/15.
Accession Number: 20151030–5507.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: ER15–1825–002.
Applicants: California Independent
System Operator Corporation.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Description: Compliance filing: 2015–
11–02_RSI_Phase1A_Compliance Filing
to be effective 1/10/2016.
Filed Date: 11/2/15.
Accession Number: 20151102–5139.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16–229–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2646R1 Kansas Municipal Energy
Agency NITSA NOA to be effective 10/
1/2015.
Filed Date: 11/2/15.
Accession Number: 20151102–5108.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16–230–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1067R5 ETEC NITSA; Cancellation of
1065R4 Tex-La NITA and 1066R7 NTEC
NITSA to be effective 10/1/2015.
Filed Date: 11/2/15.
Accession Number: 20151102–5109.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16–231–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3082
Minnkota Power Cooperative, Inc.
NITSA and NOA to be effective 10/1/
2015.
Filed Date: 11/2/15.
Accession Number: 20151102–5123.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16–232–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3124
Basin Electric Power Cooperative
NITSA and NOA to be effective 10/1/
2015.
Filed Date: 11/2/15.
Accession Number: 20151102–5166.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16–233–000.
Applicants: Illinois Power Resources
Generating, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession for Reactive
Service Rate Schedule to be effective 1/
1/2016.
Filed Date: 11/2/15.
Accession Number: 20151102–5167.
Comments Due: 5 p.m. ET 11/23/15.
Take notice that the Commission
received the following land acquisition
reports:
Docket Numbers: LA15–3–000.
Applicants: Adelanto Solar, LLC,
Adelanto Solar II, LLC, Ashtabula Wind,
LLC, Ashtabula Wind II, LLC, Ashtabula
Wind III, LLC, Backbone Mountain
Windpower, LLC, Baldwin Wind, LLC,
Bayswater Peaking Facility, LLC,
Blackwell Wind, LLC, Breckinridge
E:\FR\FM\09NON1.SGM
09NON1
srobinson on DSK5SPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 216 / Monday, November 9, 2015 / Notices
Wind Project, LLC, Butler Ridge Wind
Energy Center, LLC, Cimarron Wind
Energy, LLC, Crystal Lake Wind, LLC,
Crystal Lake Wind II, LLC, Crystal Lake
Wind III, LLC, Day County Wind, LLC,
Desert Sunlight 250, LLC, Desert
Sunlight 300, LLC, Diablo Winds, LLC,
Elk City Wind, LLC, Elk City II Wind,
LLC, Energy Storage Holdings, LLC,
Ensign Wind, LLC, ESI Vansycle
Partners, L.P., Florida Power & Light
Company, FPL Energy Burleigh County
Wind, LLC, FPL Energy Cabazon Wind,
LLC, FPL Energy Cape, LLC, FPL Energy
Cowboy Wind, LLC, FPL Energy Green
Power Wind, LLC, FPL Energy Hancock
County Wind, LLC, FPL Energy Illinois
Wind, LLC, FPL Energy Marcus Hook,
L.P., FPL Energy MH50, L.P., FPL
Energy Montezuma Wind, LLC, FPL
Energy Mower County, LLC, FPL Energy
New Mexico Wind, LLC, FPL Energy
North Dakota Wind, LLC, FPL Energy
North Dakota Wind II, LLC, FPL Energy
Oklahoma Wind, LLC, FPL Energy
Oliver Wind I, LLC, FPL Energy Oliver
Wind II, LLC, FPL Energy Sooner Wind,
LLC, FPL Energy South Dakota Wind,
LLC, FPL Energy Stateline II, Inc., FPL
Energy Vansycle, LLC, FPL Energy
Wyman, LLC, FPL Energy Wyman IV,
LLC, Garden Wind, LLC, Genesis Solar,
LLC, Golden West Power Partners, LLC,
Gray County Wind Energy, LLC, Green
Mountain Storage, LLC, Hatch Solar
Energy Center I, LLC, Hawkeye Power
Partners, LLC, High Majestic Wind
Energy Center, LLC, High Majestic Wind
II, LLC, High Winds, LLC, Jamaica Bay
Peaking Facility, LLC, Lake Benton
Power Partners II, LLC, Langdon Wind,
LLC, Limon Wind, LLC, Limon Wind II,
LLC, Limon Wind III, LLC, Logan Wind
Energy LLC, Mammoth Plains Wind
Project, LLC, Mantua Creek Solar, LLC,
McCoy Solar, LLC, Meyersdale Storage,
LLC, Meyersdale Windpower LLC, Mill
Run Windpower, LLC, Minco Wind,
LLC, Minco Wind II, LLC, Minco Wind
III, LLC, Minco Wind Interconnection
Services, LLC, Mountain View Solar,
LLC, NEPM II, LLC, NextEra Energy
Duane Arnold, LLC, NextEra Energy
Montezuma II Wind, LLC, NextEra
Energy Point Beach, LLC, NextEra
Energy Power Marketing, LLC, NextEra
Energy Seabrook, LLC, NextEra Energy
Services Massachusetts, LLC, Northeast
Energy Associates, LP, North Jersey
Energy Associates, A Limited
Partnership, North Sky River Energy,
LLC, Northern Colorado Wind Energy,
LLC, Osceola Windpower, LLC, Osceola
Windpower II, LLC, Palo Duro Wind
Energy, LLC, Palo Duro Wind
Interconnection Services, LLC, Paradise
Solar Urban Renewal, L.L.C., Peetz
Table Wind Energy, LLC, Pennsylvania
VerDate Sep<11>2014
19:52 Nov 06, 2015
Jkt 238001
Windfarms, LLC, Perrin Ranch Wind,
LLC, Pheasant Run Wind, LLC, Red
Mesa Wind, LLC, Seiling Wind, LLC,
Seiling Wind II, LLC, Seiling Wind
Interconnection Services, LLC, Silver
State Solar Power South, LLC, Shafter
Solar, LLC, Sky River LLC, Sky River
Asset Holdings, LLC, Somerset
Windpower, LLC, Steele Flats Wind
Project, LLC, Story Wind, LLC, Tuscola
Bay Wind, LLC, Tuscola Wind II, LLC,
Vasco Winds, LLC, Waymart Wind
Farm, L.P., Wessington Wind Energy
Center, LLC, White Oak Energy LLC,
Wilton Wind II, LLC, Windpower
Partners 1993, LLC.
Description: Quarterly Land
Acquisition Report of the NextEra
Energy Companies.
Filed Date: 10/30/15.
Accession Number: 20151030–5508.
Comments Due: 5 p.m. ET 11/20/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 2, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–28396 Filed 11–6–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER16–237–000]
South Jersey Energy IS09, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding South
Jersey Energy IS09, LLC.’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
PO 00000
Frm 00024
Fmt 4703
Sfmt 9990
69211
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is November
23, 2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: November 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–28425 Filed 11–6–15; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\09NON1.SGM
09NON1
Agencies
[Federal Register Volume 80, Number 216 (Monday, November 9, 2015)]
[Notices]
[Pages 69210-69211]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-28396]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC16-19-000.
Applicants: Calpine Granite Holdings, LLC, Granite Ridge Energy,
LLC.
Description: Calpine Granite Holdings, LLC et al submits the
workpapers of Julie Solomon re the application for approval under
Section 203 of the Federal Power Act etc.
Filed Date: 10/28/15.
Accession Number: 20151028-0056.
Comments Due: 5 p.m. ET 12/28/15.
Docket Numbers: EC16-22-000.
Applicants: Roosevelt Wind Project, LLC, Milo Wind Project, LLC.
Description: Application for Authorization for Disposition of
Jurisdictional Facilities and Requests for Confidential Treatment and
Expedited Action of Roosevelt Wind Project, LLC, and Milo Wind Project,
LLC.
Filed Date: 10/30/15.
Accession Number: 20151030-5502.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: EC16-23-000.
Applicants: Prairie Rose Wind, LLC, Prairie Rose Transmission, LLC.
Description: Application of Prairie Rose Wind, LLC, et al. for
Authorization Under Section 203 of the Federal Power Act, Request for
Expedited Consideration and Confidential Treatment.
Filed Date: 10/30/15.
Accession Number: 20151030-5519.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: EC16-24-000.
Applicants: Chisholm View Wind Project, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, Request for Expedited Consideration and Confidential
Treatment of Chisholm View Wind Project, LLC.
Filed Date: 10/30/15.
Accession Number: 20151030-5520.
Comments Due: 5 p.m. ET 11/20/15.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER13-193-006.
Applicants: ISO New England Inc.
Description: Compliance filing: Amendments to ISO-NE Tariff and TOA
in Compliance with October 2, 2015 Order to be effective 5/18/2015.
Filed Date: 11/2/15.
Accession Number: 20151102-5124.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER13-196-005.
Applicants: ISO New England Inc., Eversource Energy Service Company
(as agent).
Description: Compliance filing: Amendments to the TOA in Compliance
with October 2, 2015 Order to be effective 5/18/2015.
Filed Date: 11/2/15.
Accession Number: 20151102-5126.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER13-1908-001.
Applicants: Virginia Electric and Power Company.
Description: Notice of material change in circumstances of Virginia
Electric and Power Company and its marketing affiliates.
Filed Date: 10/30/15.
Accession Number: 20151030-5507.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: ER15-1825-002.
Applicants: California Independent System Operator Corporation.
Description: Compliance filing: 2015-11-02_RSI_Phase1A_Compliance
Filing to be effective 1/10/2016.
Filed Date: 11/2/15.
Accession Number: 20151102-5139.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16-229-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 2646R1 Kansas Municipal
Energy Agency NITSA NOA to be effective 10/1/2015.
Filed Date: 11/2/15.
Accession Number: 20151102-5108.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16-230-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1067R5 ETEC NITSA;
Cancellation of 1065R4 Tex-La NITA and 1066R7 NTEC NITSA to be
effective 10/1/2015.
Filed Date: 11/2/15.
Accession Number: 20151102-5109.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16-231-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3082 Minnkota Power
Cooperative, Inc. NITSA and NOA to be effective 10/1/2015.
Filed Date: 11/2/15.
Accession Number: 20151102-5123.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16-232-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3124 Basin Electric Power
Cooperative NITSA and NOA to be effective 10/1/2015.
Filed Date: 11/2/15.
Accession Number: 20151102-5166.
Comments Due: 5 p.m. ET 11/23/15.
Docket Numbers: ER16-233-000.
Applicants: Illinois Power Resources Generating, LLC.
Description: Sec. 205(d) Rate Filing: Notice of Succession for
Reactive Service Rate Schedule to be effective 1/1/2016.
Filed Date: 11/2/15.
Accession Number: 20151102-5167.
Comments Due: 5 p.m. ET 11/23/15.
Take notice that the Commission received the following land
acquisition reports:
Docket Numbers: LA15-3-000.
Applicants: Adelanto Solar, LLC, Adelanto Solar II, LLC, Ashtabula
Wind, LLC, Ashtabula Wind II, LLC, Ashtabula Wind III, LLC, Backbone
Mountain Windpower, LLC, Baldwin Wind, LLC, Bayswater Peaking Facility,
LLC, Blackwell Wind, LLC, Breckinridge
[[Page 69211]]
Wind Project, LLC, Butler Ridge Wind Energy Center, LLC, Cimarron Wind
Energy, LLC, Crystal Lake Wind, LLC, Crystal Lake Wind II, LLC, Crystal
Lake Wind III, LLC, Day County Wind, LLC, Desert Sunlight 250, LLC,
Desert Sunlight 300, LLC, Diablo Winds, LLC, Elk City Wind, LLC, Elk
City II Wind, LLC, Energy Storage Holdings, LLC, Ensign Wind, LLC, ESI
Vansycle Partners, L.P., Florida Power & Light Company, FPL Energy
Burleigh County Wind, LLC, FPL Energy Cabazon Wind, LLC, FPL Energy
Cape, LLC, FPL Energy Cowboy Wind, LLC, FPL Energy Green Power Wind,
LLC, FPL Energy Hancock County Wind, LLC, FPL Energy Illinois Wind,
LLC, FPL Energy Marcus Hook, L.P., FPL Energy MH50, L.P., FPL Energy
Montezuma Wind, LLC, FPL Energy Mower County, LLC, FPL Energy New
Mexico Wind, LLC, FPL Energy North Dakota Wind, LLC, FPL Energy North
Dakota Wind II, LLC, FPL Energy Oklahoma Wind, LLC, FPL Energy Oliver
Wind I, LLC, FPL Energy Oliver Wind II, LLC, FPL Energy Sooner Wind,
LLC, FPL Energy South Dakota Wind, LLC, FPL Energy Stateline II, Inc.,
FPL Energy Vansycle, LLC, FPL Energy Wyman, LLC, FPL Energy Wyman IV,
LLC, Garden Wind, LLC, Genesis Solar, LLC, Golden West Power Partners,
LLC, Gray County Wind Energy, LLC, Green Mountain Storage, LLC, Hatch
Solar Energy Center I, LLC, Hawkeye Power Partners, LLC, High Majestic
Wind Energy Center, LLC, High Majestic Wind II, LLC, High Winds, LLC,
Jamaica Bay Peaking Facility, LLC, Lake Benton Power Partners II, LLC,
Langdon Wind, LLC, Limon Wind, LLC, Limon Wind II, LLC, Limon Wind III,
LLC, Logan Wind Energy LLC, Mammoth Plains Wind Project, LLC, Mantua
Creek Solar, LLC, McCoy Solar, LLC, Meyersdale Storage, LLC, Meyersdale
Windpower LLC, Mill Run Windpower, LLC, Minco Wind, LLC, Minco Wind II,
LLC, Minco Wind III, LLC, Minco Wind Interconnection Services, LLC,
Mountain View Solar, LLC, NEPM II, LLC, NextEra Energy Duane Arnold,
LLC, NextEra Energy Montezuma II Wind, LLC, NextEra Energy Point Beach,
LLC, NextEra Energy Power Marketing, LLC, NextEra Energy Seabrook, LLC,
NextEra Energy Services Massachusetts, LLC, Northeast Energy
Associates, LP, North Jersey Energy Associates, A Limited Partnership,
North Sky River Energy, LLC, Northern Colorado Wind Energy, LLC,
Osceola Windpower, LLC, Osceola Windpower II, LLC, Palo Duro Wind
Energy, LLC, Palo Duro Wind Interconnection Services, LLC, Paradise
Solar Urban Renewal, L.L.C., Peetz Table Wind Energy, LLC, Pennsylvania
Windfarms, LLC, Perrin Ranch Wind, LLC, Pheasant Run Wind, LLC, Red
Mesa Wind, LLC, Seiling Wind, LLC, Seiling Wind II, LLC, Seiling Wind
Interconnection Services, LLC, Silver State Solar Power South, LLC,
Shafter Solar, LLC, Sky River LLC, Sky River Asset Holdings, LLC,
Somerset Windpower, LLC, Steele Flats Wind Project, LLC, Story Wind,
LLC, Tuscola Bay Wind, LLC, Tuscola Wind II, LLC, Vasco Winds, LLC,
Waymart Wind Farm, L.P., Wessington Wind Energy Center, LLC, White Oak
Energy LLC, Wilton Wind II, LLC, Windpower Partners 1993, LLC.
Description: Quarterly Land Acquisition Report of the NextEra
Energy Companies.
Filed Date: 10/30/15.
Accession Number: 20151030-5508.
Comments Due: 5 p.m. ET 11/20/15.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: November 2, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-28396 Filed 11-6-15; 8:45 am]
BILLING CODE 6717-01-P