City of Watervliet; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests, 68523-68524 [2015-28213]
Download as PDF
Federal Register / Vol. 80, No. 214 / Thursday, November 5, 2015 / Notices
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the planned project.
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 3).
jstallworth on DSK7TPTVN1PROD with NOTICES
Becoming an Intervenor
Once DCG files its application with
the Commission, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Motions to intervene are
more fully described at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp. Instructions for becoming
an intervenor are in the ‘‘Document-less
Intervention Guide’’ under the ‘‘e-filing’’
link on the Commission’s Web site.
Please note that the Commission will
not accept requests for intervenor status
at this time. You must wait until the
Commission receives a formal
application for the project.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search’’ and enter the docket
number, excluding the last three digits
in the Docket Number field (i.e., PF15–
29). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
VerDate Sep<11>2014
15:06 Nov 04, 2015
Jkt 238001
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: October 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–28204 Filed 11–4–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13135–004]
City of Watervliet; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: License for
Major Project-Existing Dam.
b. Project No.: P–13135–004.
c. Date filed: August 26, 2014.
d. Applicant: City of Watervliet, New
York.
e. Name of Project: Delta
Hydroelectric Project.
f. Location: On the Mohawk River, in
the City of Rome, Oneida County, NY.
No federal lands are occupied by the
project works or located within the
project boundary.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Michael P.
Manning, Mayor, City of Watervliet,
City Hall, Watervliet, NY 12189, Phone:
518–270–3815, Email: mikemanning@
watervliet.com; or Mark Gleason,
General Manager, City of Watervliet,
City Hall, Watervliet, NY 12189, Phone:
518–270–3800x122, Email: mgleason@
watervliet.com; or Wendy Jo Carey, P.E.,
Albany Engineering Corporation, 5
Washington Square, Albany, NY 12205,
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
68523
Phone: 518–456–7712x401, Email:
wendy@albanyengineering.com.
i. FERC Contact: Brandi Sangunett,
Phone: (202) 502–8393, Email:
brandi.sangunett@ferc.gov.
j. Deadline for filing motions to
intervene and protests and requests for
cooperating agency status: 60 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–13135–004.
The Commission’s Rules of Practice
and Procedures require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. This application has been accepted
for filing, but is not ready for
environmental analysis at this time.
l. The proposed project would consist
of: (1) The existing 1,016-foot-long, 76foot-high Delta dam, owned by the New
York State Canal Corporation; (2) an
existing impoundment having a surface
area of 2,700 acres and a storage
capacity of 63,200 acre-feet at the
spillway crest elevation of 551.37 feet
North American Vertical Datum of 1988;
(3) a new 40-foot-diameter cylindrical
powerhouse containing one turbinegenerator unit with a total installed
capacity of 7.4 megawatts; (4) a new
15,000-foot-long, 34.5-kilovolt
underground transmission line; and (5)
appurtenant facilities. The project
would generate about 14,100 megawatthours of electricity annually.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
E:\FR\FM\05NON1.SGM
05NON1
jstallworth on DSK7TPTVN1PROD with NOTICES
68524
Federal Register / Vol. 80, No. 214 / Thursday, November 5, 2015 / Notices
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
When the application is ready for
environmental analysis, the
Commission will issue a public notice
requesting comments,
recommendations, terms and
conditions, or prescriptions.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION,’’ or ‘‘COMPETING
APPLICATION;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
VerDate Sep<11>2014
15:06 Nov 04, 2015
Jkt 238001
the applicant specified in the particular
application.
Dated: October 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–28213 Filed 11–4–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC16–21–000.
Applicants: Sandstone Solar LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, Request for
Expedited Consideration and
Confidential Treatment of Sandstone
Solar LLC.
Filed Date: 10/29/15.
Accession Number: 20151029–5611.
Comments Due: 5 p.m. ET 11/19/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–2267–001.
Applicants: Chevron Power Holdings
Inc.
Description: Notice of Non-Material
Change in Status of Chevron Power
Holdings Inc.
Filed Date: 10/30/15.
Accession Number: 20151030–5206.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: ER16–167–001.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: Tariff Amendment: Part 2
of Two-Part Filing of Demand Response
Changes to be effective 6/1/2016.
Filed Date: 10/30/15.
Accession Number: 20151030–5185.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: ER16–170–000.
Applicants: Champion Energy
Services, LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 10/30/2015.
Filed Date: 10/29/15.
Accession Number: 20151029–5523.
Comments Due: 5 p.m. ET 11/19/15.
Docket Numbers: ER16–171–000.
Applicants: Champion Energy
Marketing LLC.
Description: § 205(d) Rate Filing:
Market-Based Tariff Revisions to be
effective 10/30/2015.
Filed Date: 10/29/15.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Accession Number: 20151029–5527.
Comments Due: 5 p.m. ET 11/19/15.
Docket Numbers: ER16–172–000.
Applicants: Champion Energy, LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 10/30/2015.
Filed Date: 10/29/15.
Accession Number: 20151029–5533.
Comments Due: 5 p.m. ET 11/19/15.
Docket Numbers: ER16–173–000.
Applicants: Black Hills/Colorado
Electric Utility Co.
Description: Compliance filing:
Corrections to OATT Table of Contents
to be effective 12/29/2015.
Filed Date: 10/29/15.
Accession Number: 20151029–5575.
Comments Due: 5 p.m. ET 11/19/15.
Docket Numbers: ER16–174–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: 2016
RSBAA Update Filing to be effective
1/1/2016.
Filed Date: 10/30/15.
Accession Number: 20151030–5000.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: ER16–175–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: 2016
TRBAA Update Filing to be effective
1/1/2016.
Filed Date: 10/30/15.
Accession Number: 20151030–5001.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: ER16–176–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: SCE
2016 ETC Reliability Service Rate
Update to be effective 1/1/2016.
Filed Date: 10/30/15.
Accession Number: 20151030–5007.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: ER16–177–000.
Applicants: Duke Energy Florida,
LLC.
Description: § 205(d) Rate Filing:
RCID NITSA Amendment OATT SA No.
147 to be effective 1/1/2016.
Filed Date: 10/30/15.
Accession Number: 20151030–5083.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: ER16–178–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
2015–10–30_Joint Dispatch Svc-Rnd 2Filing to be effective 1/1/2016.
Filed Date: 10/30/15.
Accession Number: 20151030–5145.
Comments Due: 5 p.m. ET 11/20/15.
Docket Numbers: ER16–179–000.
Applicants: Northern States Power
Company, a Minnesota corporation.
E:\FR\FM\05NON1.SGM
05NON1
Agencies
[Federal Register Volume 80, Number 214 (Thursday, November 5, 2015)]
[Notices]
[Pages 68523-68524]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-28213]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13135-004]
City of Watervliet; Notice of Application Accepted for Filing and
Soliciting Motions To Intervene and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: License for Major Project-Existing Dam.
b. Project No.: P-13135-004.
c. Date filed: August 26, 2014.
d. Applicant: City of Watervliet, New York.
e. Name of Project: Delta Hydroelectric Project.
f. Location: On the Mohawk River, in the City of Rome, Oneida
County, NY. No federal lands are occupied by the project works or
located within the project boundary.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Michael P. Manning, Mayor, City of
Watervliet, City Hall, Watervliet, NY 12189, Phone: 518-270-3815,
Email: mikemanning@watervliet.com; or Mark Gleason, General Manager,
City of Watervliet, City Hall, Watervliet, NY 12189, Phone: 518-270-
3800x122, Email: mgleason@watervliet.com; or Wendy Jo Carey, P.E.,
Albany Engineering Corporation, 5 Washington Square, Albany, NY 12205,
Phone: 518-456-7712x401, Email: wendy@albanyengineering.com.
i. FERC Contact: Brandi Sangunett, Phone: (202) 502-8393, Email:
brandi.sangunett@ferc.gov.
j. Deadline for filing motions to intervene and protests and
requests for cooperating agency status: 60 days from the issuance date
of this notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene and protests and requests for cooperating agency
status using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. The first page of any filing should
include docket number P-13135-004.
The Commission's Rules of Practice and Procedures require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. This application has been accepted for filing, but is not ready
for environmental analysis at this time.
l. The proposed project would consist of: (1) The existing 1,016-
foot-long, 76-foot-high Delta dam, owned by the New York State Canal
Corporation; (2) an existing impoundment having a surface area of 2,700
acres and a storage capacity of 63,200 acre-feet at the spillway crest
elevation of 551.37 feet North American Vertical Datum of 1988; (3) a
new 40-foot-diameter cylindrical powerhouse containing one turbine-
generator unit with a total installed capacity of 7.4 megawatts; (4) a
new 15,000-foot-long, 34.5-kilovolt underground transmission line; and
(5) appurtenant facilities. The project would generate about 14,100
megawatt-hours of electricity annually.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available
[[Page 68524]]
for inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Any qualified applicant desiring to file a competing application
must submit to the Commission, on or before the specified intervention
deadline date, a competing development application, or a notice of
intent to file such an application. Submission of a timely notice of
intent allows an interested person to file the competing development
application no later than 120 days after the specified intervention
deadline date. Applications for preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the exact name, business address,
and telephone number of the prospective applicant, and must include an
unequivocal statement of intent to submit a development application. A
notice of intent must be served on the applicant(s) named in this
public notice.
Anyone may submit a protest or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210, 385.211, and 385.214. In determining the appropriate action to
take, the Commission will consider all protests filed, but only those
who file a motion to intervene in accordance with the Commission's
Rules may become a party to the proceeding. Any protests or motions to
intervene must be received on or before the specified deadline date for
the particular application.
When the application is ready for environmental analysis, the
Commission will issue a public notice requesting comments,
recommendations, terms and conditions, or prescriptions.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION,'' or ``COMPETING APPLICATION;'' (2) set forth in
the heading the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person protesting or intervening;
and (4) otherwise comply with the requirements of 18 CFR 385.2001
through 385.2005. Agencies may obtain copies of the application
directly from the applicant. A copy of any protest or motion to
intervene must be served upon each representative of the applicant
specified in the particular application.
Dated: October 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-28213 Filed 11-4-15; 8:45 am]