Federal Register / Vol. 80, No. 214 / Thursday, November 5, 2015 / Notices
so, are these transmission projects
eligible to use PJM’s regional cost
allocation method?
2. The process through which
Supplemental Projects become
transmission projects eligible for
selection in the regional transmission
plan for purposes of cost allocation.
a. If a Supplemental Project is
transitioned into a Required
Transmission Enhancement that is
eligible for regional cost allocation in
PJM’s RTEP, does it undergo the same
analysis as a transmission project first
proposed as a Subregional RTEP
Project?
b. How are Supplemental Projects
distinguished from transmission
projects that address transmission
owner local planning criteria?
3. The proposal window process for
transmission project proposals intended
to address transmission owner local
planning criteria.
a. Except for Immediate-need
Reliability Projects, does PJM currently
open proposal windows for all
transmission needs identified in its
regional transmission planning process,
including those needs that arise as a
result of local transmission needs and
transmission owner local planning
criteria?
b. If PJM does not currently open
proposal windows for all transmission
needs identified in PJM’s regional
transmission planning process, how
does PJM determine whether to open a
proposal window for a given
transmission need?
c. If a PJM Transmission Owner
proposes an upgrade to its existing
transmission facilities to address a local
transmission need, does PJM open a
proposal window to solicit other
possible solutions to address the local
transmission need that would be
addressed by the upgrade?
d. If a PJM Transmission Owner
proposes a new 500 kV transmission
facility to address a local transmission
need, does PJM currently open a
proposal window to solicit other
possible solutions to address the local
transmission need that would be
addressed by PJM Transmission
Owner’s proposed new 500 kV
transmission facility?
The technical conference will be led
by Commission staff, and is open to the
public. Pre-registration through the
Commission’s Web site (https://
www.ferc.gov/whats-new/registration/
11-10-15-form.asp) is encouraged but
not required. The conference will
include discussions responding to
Commission staff’s questions led by PJM
and the PJM Transmission Owners, with
opportunity for questions and
VerDate Sep<11>2014
15:06 Nov 04, 2015
Jkt 238001
comments during those discussions for
participating parties. The specific
agenda and procedures to be followed at
the conference will be announced by
staff at the opening of the conference.
The technical conference will not be
transcribed. However, there will be a
free audio cast of the conference.
Anyone wishing to listen to the meeting
should send an email to Sarah McKinley
at sarah.mckinley@ferc.gov by
November 3, 2015, to request call-in
information. Please reference ‘‘call
information for ER15–1344/1387
technical conference’’ in the subject line
of the email. The call-in information
will be provided prior to the meeting.
Persons listening to the technical
conference may participate by
submitting questions, either prior to or
during the technical conference, by
emailing RTEPconference@ferc.gov.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations please
send an email to accessibility@ferc.gov
or call toll free 1–866–208–3372 (voice)
or 202–502–8659 (TTY); or send a fax to
202–208–2106 with the required
accommodations.
Following the technical conference,
the Commission will consider posttechnical conference comments
submitted on or before December 10,
2015. Reply comments will be due on or
before January 7, 2016. The written
comments will be included in the
formal record of the proceeding, which,
together with the record developed to
date, will form the basis for further
Commission action.
For more information about this
technical conference, please contact
Katherine Scott, 202–502–6495,
katherine.scott@ferc.gov, regarding
Docket Nos. ER15–1344–001 and ER15–
1344–002; Nicole Buell, 202–502–6846,
nicole.buell@ferc.gov, regarding Docket
No. ER15–1387–001; or Sarah
McKinley, 202–502–8368,
sarah.mckinley@ferc.gov, regarding
logistical issues.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–28157 Filed 11–4–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
68531
Docket Numbers: EG16–14–000.
Applicants: Utah Red Hills Renewable
Park, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Utah Red Hills
Renewable Park, LLC.
Filed Date: 10/29/15.
Accession Number: 20151029–5259.
Comments Due: 5 p.m. ET 11/19/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–1883–001;
ER15–1418–001; ER10–1836–008;
ER10–2005–008; ER11–26–008; ER10–
1838–008; ER10–2551–007; ER10–1915–
007; ER12–569–009; ER15–1925–001;
ER10–1841–008; ER13–712–009; ER10–
1843–008; ER10–1844–008; ER10–1845–
008; ER10–1846–007; ER13–1991–005;
ER13–1992–005; ER10–1847–007;
ER10–1849–008; ER11–2037–008;
ER13–752–007; ER12–2227–008; ER10–
1851–006; ER10–1852–012; ER10–1855–
007; ER10–1856–007; ER10–1857–007;
ER10–1887–008; ER10–1890–007;
ER10–1897–008; ER10–1899–008;
ER10–1902–008; ER10–1903–008;
ER11–2160–007; ER10–1905–008;
ER10–1906–006; ER10–1907–008;
ER10–1918–008; ER10–1920–010;
ER10–1925–008; ER10–1927–008;
ER10–1928–010; ER11–2642–008;
ER10–1930–006; ER10–1931–007;
ER10–1932–007; ER10–1935–007;
ER10–1950–008; ER13–2112–003;
ER15–2101–002; ER10–1952–008;
ER15–2601–001; ER11–3635–007;
ER10–2006–009; ER10–1961–008;
ER12–1228–010; ER10–1962–007;
ER10–1963–007; ER10–1964–008;
ER10–1965–008; ER12–2226–006;
ER12–2225–006; ER14–2138–003;
ER10–1966–007; ER14–2707–005.
Applicants: Adelanto Solar, LLC,
Adelanto Solar II, LLC, Ashtabula Wind,
LLC, Ashtabula Wind II, LLC, Ashtabula
Wind III, LLC, Backbone Mountain
Windpower LLC, Baldwin Wind, LLC,
Bayswater Peaking Facility, LLC,
Blackwell Wind, LLC, Breckinridge
Wind Project, LLC, Butler Ridge Wind
Energy Center, LLC, Cimarron Wind
Energy, LLC, Crystal Lake Wind, LLC,
Crystal Lake Wind II, LLC, Crystal Lake
Wind III, LLC, Day County Wind, LLC,
Desert Sunlight 250, LLC, Desert
Sunlight 300, LLC, Diablo Winds, LLC,
Elk City Wind, LLC, Elk City II Wind,
LLC, Energy Storage Holdings, LLC,
Ensign Wind, LLC, ESI Vansycle
Partners, L.P., Florida Power & Light
Company, FPL Energy Burleigh County
Wind, LLC, FPL Energy Cabazon Wind,
LLC, FPL Energy Cape, LLC, FPL Energy
Cowboy Wind, LLC, FPL Energy Green
Power Wind, LLC, FPL Energy Hancock
E:\FR\FM\05NON1.SGM
05NON1
jstallworth on DSK7TPTVN1PROD with NOTICES
68532
Federal Register / Vol. 80, No. 214 / Thursday, November 5, 2015 / Notices
County Wind, LLC, FPL Energy Illinois
Wind, LLC, FPL Energy Marcus Hook,
L.P., FPL Energy MH50 L.P., FPL Energy
Montezuma Wind, LLC, FPL Energy
Mower County, LLC, FPL Energy New
Mexico Wind, LLC, FPL Energy North
Dakota Wind, LLC, FPL Energy North
Dakota Wind II, LLC, FPL Energy
Oklahoma Wind, LLC, FPL Energy
Oliver Wind I, LLC, FPL Energy Oliver
Wind II, LLC, FPL Energy Sooner Wind,
LLC, FPL Energy South Dakota Wind,
LLC, FPL Energy Stateline II, Inc., FPL
Energy Vansycle, L.L.C, FPL Energy
Wyman, LLC, FPL Energy Wyman IV,
LLC, Garden Wind, LLC, Genesis Solar,
LLC, Golden West Power Partners, LLC,
Gray County Wind Energy, LLC, Green
Mountain Storage, LLC, Hatch Solar
Energy Center I, LLC, Hawkeye Power
Partners, LLC, High Majestic Wind
Energy Center, LLC, High Majestic Wind
II, LLC, High Winds, LLC, Jamaica Bay
Peaking Facility, LLC, Lake Benton
Power Partners II, LLC, Langdon Wind,
LLC, Limon Wind, LLC, Limon Wind II,
LLC, Limon Wind III, LLC, Logan Wind
Energy LLC, Mammoth Plains Wind
Project, LLC.
Description: Notice of Change in
Status of the NextEra Energy Companies
[Part 1 of 2].
Filed Date: 10/28/15.
Accession Number: 20151028–5364.
Comments Due: 5 p.m. ET 11/18/15.
Docket Numbers: ER16–143–001.
Applicants: Citizens Sunrise
Transmission LLC.
Description: Tariff Amendment:
Amendment to TRBAA Filing to be
effective 1/1/2016.
Filed Date: 10/28/15.
Accession Number: 20151028–5323.
Comments Due: 5 p.m. ET 11/18/15.
Docket Numbers: ER16–158–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Attachment AE Regarding
Pricing in the Context of Ramp
Constraints to be effective 12/27/2015.
Filed Date: 10/28/15.
Accession Number: 20151028–5357.
Comments Due: 5 p.m. ET 11/18/15.
Docket Numbers: ER16–159–000.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: § 205(d) Rate Filing:
Removal of NEPOOL Review Board to
be effective 1/1/2016.
Filed Date: 10/29/15.
Accession Number: 20151029–5108.
Comments Due: 5 p.m. ET 11/19/15.
Docket Numbers: ER16–160–000.
Applicants: New-Indy Ontario LLC.
Description: Baseline eTariff Filing:
Application for MBR to be effective
1/1/2016.
VerDate Sep<11>2014
15:06 Nov 04, 2015
Jkt 238001
Filed Date: 10/29/15.
Accession Number: 20151029–5185.
Comments Due: 5 p.m. ET 11/19/15.
Docket Numbers: ER16–161–000.
Applicants: New-Indy Oxnard LLC.
Description: Baseline eTariff Filing:
Application for MBR to be effective
1/1/2016.
Filed Date: 10/29/15.
Accession Number: 20151029–5187.
Comments Due: 5 p.m. ET 11/19/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 29, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–28205 Filed 11–4–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC15–12–000]
Commission Information Collection
Activities (FERC–725); Comment
Request; Extension
Federal Energy Regulatory
Commission.
ACTION: Notice of information collection
and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, 44 U.S.C.
3506(c)(2)(A), the Federal Energy
Regulatory Commission (Commission or
FERC) is soliciting public comment on
the currently approved information
collection, FERC–725 [Certification of
Electric Reliability Organization;
Procedures for Electric Reliability
Standards]. The Commission previously
issued a Notice in the Federal Register
(80 FR 50846, 8/21/2015) requesting
SUMMARY:
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
public comments. The Commission
received no comments on the FERC–725
and is making this notation in its
submittal to OMB.
DATES: Comments on the collection of
information are due December 7, 2015.
ADDRESSES: Comments filed with OMB,
identified by the OMB Control No.
1902–0225 or collection number (FERC–
725), should be sent via email to the
Office of Information and Regulatory
Affairs: oira_submission@omb.gov.
Attention: Federal Energy Regulatory
Commission Desk Officer. The Desk
Officer may also be reached via
telephone at 202–395–0710.
A copy of the comments should also
be sent to the Commission, in Docket
No. IC15–12–000, by either of the
following methods:
• eFiling at Commission’s Web site:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, by
telephone at (202) 502–8663, and by fax
at (202) 273–0873.
SUPPLEMENTARY INFORMATION:
Title: FERC–725, Certification of
Electric Reliability Organization;
Procedures for Electric Reliability
Standards.
OMB Control No.:1902–0225.
Type of Request: Three-year extension
of the FERC–725 information collection
requirements with no changes to the
current reporting requirements.
Abstract: The FERC–725 information
collection contains the following
information collection elements:
• Self Assessment and Electric
Reliability Organization (ERO)
Application: The Commission requires
the ERO to submit to FERC a
performance assessment report every
five years. The next assessment is due
in 2019. Each Regional Entity submits a
performance assessment report to the
E:\FR\FM\05NON1.SGM
05NON1
Agencies
[Federal Register Volume 80, Number 214 (Thursday, November 5, 2015)]
[Notices]
[Pages 68531-68532]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-28205]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG16-14-000.
Applicants: Utah Red Hills Renewable Park, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Utah Red Hills Renewable Park, LLC.
Filed Date: 10/29/15.
Accession Number: 20151029-5259.
Comments Due: 5 p.m. ET 11/19/15.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER15-1883-001; ER15-1418-001; ER10-1836-008; ER10-
2005-008; ER11-26-008; ER10-1838-008; ER10-2551-007; ER10-1915-007;
ER12-569-009; ER15-1925-001; ER10-1841-008; ER13-712-009; ER10-1843-
008; ER10-1844-008; ER10-1845-008; ER10-1846-007; ER13-1991-005; ER13-
1992-005; ER10-1847-007; ER10-1849-008; ER11-2037-008; ER13-752-007;
ER12-2227-008; ER10-1851-006; ER10-1852-012; ER10-1855-007; ER10-1856-
007; ER10-1857-007; ER10-1887-008; ER10-1890-007; ER10-1897-008; ER10-
1899-008; ER10-1902-008; ER10-1903-008; ER11-2160-007; ER10-1905-008;
ER10-1906-006; ER10-1907-008; ER10-1918-008; ER10-1920-010; ER10-1925-
008; ER10-1927-008; ER10-1928-010; ER11-2642-008; ER10-1930-006; ER10-
1931-007; ER10-1932-007; ER10-1935-007; ER10-1950-008; ER13-2112-003;
ER15-2101-002; ER10-1952-008; ER15-2601-001; ER11-3635-007; ER10-2006-
009; ER10-1961-008; ER12-1228-010; ER10-1962-007; ER10-1963-007; ER10-
1964-008; ER10-1965-008; ER12-2226-006; ER12-2225-006; ER14-2138-003;
ER10-1966-007; ER14-2707-005.
Applicants: Adelanto Solar, LLC, Adelanto Solar II, LLC, Ashtabula
Wind, LLC, Ashtabula Wind II, LLC, Ashtabula Wind III, LLC, Backbone
Mountain Windpower LLC, Baldwin Wind, LLC, Bayswater Peaking Facility,
LLC, Blackwell Wind, LLC, Breckinridge Wind Project, LLC, Butler Ridge
Wind Energy Center, LLC, Cimarron Wind Energy, LLC, Crystal Lake Wind,
LLC, Crystal Lake Wind II, LLC, Crystal Lake Wind III, LLC, Day County
Wind, LLC, Desert Sunlight 250, LLC, Desert Sunlight 300, LLC, Diablo
Winds, LLC, Elk City Wind, LLC, Elk City II Wind, LLC, Energy Storage
Holdings, LLC, Ensign Wind, LLC, ESI Vansycle Partners, L.P., Florida
Power & Light Company, FPL Energy Burleigh County Wind, LLC, FPL Energy
Cabazon Wind, LLC, FPL Energy Cape, LLC, FPL Energy Cowboy Wind, LLC,
FPL Energy Green Power Wind, LLC, FPL Energy Hancock
[[Page 68532]]
County Wind, LLC, FPL Energy Illinois Wind, LLC, FPL Energy Marcus
Hook, L.P., FPL Energy MH50 L.P., FPL Energy Montezuma Wind, LLC, FPL
Energy Mower County, LLC, FPL Energy New Mexico Wind, LLC, FPL Energy
North Dakota Wind, LLC, FPL Energy North Dakota Wind II, LLC, FPL
Energy Oklahoma Wind, LLC, FPL Energy Oliver Wind I, LLC, FPL Energy
Oliver Wind II, LLC, FPL Energy Sooner Wind, LLC, FPL Energy South
Dakota Wind, LLC, FPL Energy Stateline II, Inc., FPL Energy Vansycle,
L.L.C, FPL Energy Wyman, LLC, FPL Energy Wyman IV, LLC, Garden Wind,
LLC, Genesis Solar, LLC, Golden West Power Partners, LLC, Gray County
Wind Energy, LLC, Green Mountain Storage, LLC, Hatch Solar Energy
Center I, LLC, Hawkeye Power Partners, LLC, High Majestic Wind Energy
Center, LLC, High Majestic Wind II, LLC, High Winds, LLC, Jamaica Bay
Peaking Facility, LLC, Lake Benton Power Partners II, LLC, Langdon
Wind, LLC, Limon Wind, LLC, Limon Wind II, LLC, Limon Wind III, LLC,
Logan Wind Energy LLC, Mammoth Plains Wind Project, LLC.
Description: Notice of Change in Status of the NextEra Energy
Companies [Part 1 of 2].
Filed Date: 10/28/15.
Accession Number: 20151028-5364.
Comments Due: 5 p.m. ET 11/18/15.
Docket Numbers: ER16-143-001.
Applicants: Citizens Sunrise Transmission LLC.
Description: Tariff Amendment: Amendment to TRBAA Filing to be
effective 1/1/2016.
Filed Date: 10/28/15.
Accession Number: 20151028-5323.
Comments Due: 5 p.m. ET 11/18/15.
Docket Numbers: ER16-158-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Revisions to Attachment AE
Regarding Pricing in the Context of Ramp Constraints to be effective
12/27/2015.
Filed Date: 10/28/15.
Accession Number: 20151028-5357.
Comments Due: 5 p.m. ET 11/18/15.
Docket Numbers: ER16-159-000.
Applicants: ISO New England Inc., New England Power Pool
Participants Committee.
Description: Sec. 205(d) Rate Filing: Removal of NEPOOL Review
Board to be effective 1/1/2016.
Filed Date: 10/29/15.
Accession Number: 20151029-5108.
Comments Due: 5 p.m. ET 11/19/15.
Docket Numbers: ER16-160-000.
Applicants: New-Indy Ontario LLC.
Description: Baseline eTariff Filing: Application for MBR to be
effective 1/1/2016.
Filed Date: 10/29/15.
Accession Number: 20151029-5185.
Comments Due: 5 p.m. ET 11/19/15.
Docket Numbers: ER16-161-000.
Applicants: New-Indy Oxnard LLC.
Description: Baseline eTariff Filing: Application for MBR to be
effective 1/1/2016.
Filed Date: 10/29/15.
Accession Number: 20151029-5187.
Comments Due: 5 p.m. ET 11/19/15.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: October 29, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.