Combined Notice of Filings, 67394-67395 [2015-27844]
Download as PDF
67394
Federal Register / Vol. 80, No. 211 / Monday, November 2, 2015 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14376–002]
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Cave Run Energy, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On August 14, 2015, Cave Run
Energy, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of a
hydropower project located at the U.S.
Army Corps of Engineers’ (Corps) Cave
Run Dam, located on the Licking River
in Rowan and Bath Counties, Kentucky.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) A bifurcation structure
constructed at the end of the dam’s
outlet conduit; (2) a powerhouse
containing three turbine/generating
units with a total capacity of 4.95
megawatts; (3) a 70-foot-long, 150-inchdiameter steel penstock; (4) a 1,200-footlong, 12.7-kilovolt transmission line.
The proposed project would have an
average annual generation of 20,000
megawatt-hours, and operate utilizing
surplus water from the Cave Run Dam,
as directed by the Corps.
Applicant Contact: Mr. Mark
Boumansour, Cave Run Energy, LLC,
1401 Walnut St., Suite 220, Boulder, CO
80302. (303) 440–3378.
FERC Contact: Dustin Wilson, phone:
(202) 502–6528.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
VerDate Sep<11>2014
18:55 Oct 30, 2015
Jkt 238001
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14376–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: October 26, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–27805 Filed 10–30–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP16–65–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing: PCB
TETLP DEC 2015 FILING to be effective
12/1/2015.
Filed Date: 10/21/15.
Accession Number: 20151021–5080.
Comments Due: 5 p.m. ET 11/2/15.
Docket Numbers: RP16–66–000.
Applicants: ANR Pipeline Company.
Description: ANR Pipeline Company
Request for Waiver of FERC Gas Tariff
Part 6.3 of the General Terms &
Conditions.
Filed Date: 10/21/15.
Accession Number: 20151021–5156.
Comments Due: 5 p.m. ET 11/2/15.
Docket Numbers: RP16–67–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
KeySpan Ramapo 11–1–2015 Release to
BUG to be effective 11/1/2015.
Filed Date: 10/23/15.
Accession Number: 20151023–5073.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
Comments Due: 5 p.m. ET 11/4/15.
Docket Numbers: RP16–68–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rate—Chevron TEAM2014
Release to Sequent 8938592 to be
effective 11/1/2015.
Filed Date: 10/23/15.
Accession Number: 20151023–5096.
Comments Due: 5 p.m. ET 11/4/15.
Docket Numbers: RP16–69–000.
Applicants: Clear Creek Storage
Company, L.L.C.
Description: Compliance filing Clear
Creek Storage Company, L.L.C.—Order
No. 801 Compliance Filing to be
effective 11/23/2015.
Filed Date: 10/23/15.
Accession Number: 20151023–5163.
Comments Due: 5 p.m. ET 11/4/15.
Docket Numbers: RP16–70–000.
Applicants: Exelon Generating
Company, LLC, Summit Natural Gas of
Maine.
Description: Joint Petition of Exelon
Generating Company, LLC and Summit
Natural Gas of Maine, Inc. for Limited
Waivers and Clarification under RP16–
70.
Filed Date: 10/23/15.
Accession Number: 20151023–5264.
Comments Due: 5 p.m. ET 11/4/15.
Docket Numbers: RP16–71–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2015–10–23 Twin Eagle & Tenaska
Extension w HK to be effective 11/1/
2015.
Filed Date: 10/23/15.
Accession Number: 20151023–5329.
Comments Due: 5 p.m. ET 11/4/15.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP14–247–000.
Applicants: Sea Robin Pipeline
Company, LLC.
Description: Report Filing: RP14–247
Rate Case Refund Report.
Filed Date: 10/23/15.
Accession Number: 20151023–5115.
Comments Due: 5 p.m. ET 11/4/15.
Docket Numbers: RP16–41–001.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: Tariff Amendment: 10/
23/15 Negotiated Rates—Emera Energy
E:\FR\FM\02NON1.SGM
02NON1
Federal Register / Vol. 80, No. 211 / Monday, November 2, 2015 / Notices
Services, Inc. (RTS) 2715–24 & –25
AMND to be effective 11/1/2015.
Filed Date: 10/23/15.
Accession Number: 20151023–5261.
Comments Due: 5 p.m. ET 11/4/15.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 26, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–27844 Filed 10–30–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12686–004]
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Baker County, Oregon; Notice of
Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969, and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47,897), the Office of Energy
Projects has reviewed Baker County,
Oregon’s (Baker County) application for
a license to construct its proposed
Mason Dam Hydroelectric Project, and
has prepared an Environmental
Assessment (EA). The proposed 3.4megawatt (MW) project would be
located on the Powder River, at the
existing U.S. Bureau of Reclamation’s
(Reclamation) Mason Dam, near Baker
City, in Baker County, Oregon. The
project would occupy federal land
managed by Reclamation and the U.S.
Forest Service.
The EA contains Commission staff’s
analysis of the potential environmental
impacts of the proposed hydroelectric
project. The EA concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major federal
VerDate Sep<11>2014
18:55 Oct 30, 2015
Jkt 238001
action that would significantly affect the
quality of the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, 202–502–8659.
You may also register online at
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
45 days from the date of this notice.
The Commission strongly encourages
electronic filings. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp.
You must include your name and
contact information at the end of your
comments. For assistance, please
contact FERC Online Support. In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. Please affix
‘‘Project No. 12686–004’’ to all
comments.
Please contact Kenneth Hogan
(Commission Staff) by telephone at
(202) 502–8434, or by email at
Kenneth.Hogan@ferc.gov, if you have
any questions.
Dated: October 27, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–27839 Filed 10–30–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–4–000]
Tennessee Gas Pipeline Company,
L.L.C.; Notice of Application
Take notice that on October 9, 2015,
Tennessee Gas Pipeline Company,
L.L.C. (Tennessee) filed an application
with the Federal Energy Regulatory
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
67395
Commission, pursuant to section 7(c) of
the Natural Gas Act (NGA), to construct,
install, modify, operate, and maintain
certain pipeline facilities located in
Pennsylvania, as described in more
detail below, all as more completely
described in the Application. This filing
is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding the
application should be directed to
Patrick Stewart, Senior Counsel,
Tennessee Gas Pipeline Company,
L.L.C., 1001 Louisiana Street, Houston,
Texas 77002, phone: (713) 369–8765,
facsimile: (713) 420–1601, email:
Patrick_Stewart@kindermorgan.com; or
Debbie Kalisek, Regulatory Affairs,
Tennessee Gas Pipeline Company,
L.L.C., 1001 Louisiana Street, Houston,
Texas 77002, phone: (713) 420–3292,
facsimile: (713) 420–1605, email:
debbie_kalisek@kindermorgan.com.
Specifically, Tennessee requests
authorization for the construction and
operation of the Orion Project, which
include: (1) An approximately 8.23 mile
long, 36-inch diameter pipeline loop
along Tennessee’s existing 300 Line
right-of-way in Wayne and Pike
Counties, Pennsylvania, ending at
existing Compressor Station 323 (Loop
322); (2) an approximately 4.68 mile
long, 36-inch diameter pipeline loop
along Tennessee’s existing 300 Line
right-of-way in Pike County,
Pennsylvania, beginning at Compressor
Station 323 (Loop 323); and (3) certain
appurtenant and auxiliary facilities.
Tennessee has executed binding
precedent agreements with shippers for
100 percent of the 135,000 Dth per day
of incremental firm transportation
capacity created by the Orion Project.
The Orion Project is estimated to cost
$143,549,615.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
E:\FR\FM\02NON1.SGM
02NON1
Agencies
[Federal Register Volume 80, Number 211 (Monday, November 2, 2015)]
[Notices]
[Pages 67394-67395]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-27844]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP16-65-000.
Applicants: Texas Eastern Transmission, LP.
Description: Sec. 4(d) Rate Filing: PCB TETLP DEC 2015 FILING to
be effective 12/1/2015.
Filed Date: 10/21/15.
Accession Number: 20151021-5080.
Comments Due: 5 p.m. ET 11/2/15.
Docket Numbers: RP16-66-000.
Applicants: ANR Pipeline Company.
Description: ANR Pipeline Company Request for Waiver of FERC Gas
Tariff Part 6.3 of the General Terms & Conditions.
Filed Date: 10/21/15.
Accession Number: 20151021-5156.
Comments Due: 5 p.m. ET 11/2/15.
Docket Numbers: RP16-67-000.
Applicants: Algonquin Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: KeySpan Ramapo 11-1-2015
Release to BUG to be effective 11/1/2015.
Filed Date: 10/23/15.
Accession Number: 20151023-5073.
Comments Due: 5 p.m. ET 11/4/15.
Docket Numbers: RP16-68-000.
Applicants: Texas Eastern Transmission, LP.
Description: Sec. 4(d) Rate Filing: Negotiated Rate--Chevron
TEAM2014 Release to Sequent 8938592 to be effective 11/1/2015.
Filed Date: 10/23/15.
Accession Number: 20151023-5096.
Comments Due: 5 p.m. ET 11/4/15.
Docket Numbers: RP16-69-000.
Applicants: Clear Creek Storage Company, L.L.C.
Description: Compliance filing Clear Creek Storage Company,
L.L.C.--Order No. 801 Compliance Filing to be effective 11/23/2015.
Filed Date: 10/23/15.
Accession Number: 20151023-5163.
Comments Due: 5 p.m. ET 11/4/15.
Docket Numbers: RP16-70-000.
Applicants: Exelon Generating Company, LLC, Summit Natural Gas of
Maine.
Description: Joint Petition of Exelon Generating Company, LLC and
Summit Natural Gas of Maine, Inc. for Limited Waivers and Clarification
under RP16-70.
Filed Date: 10/23/15.
Accession Number: 20151023-5264.
Comments Due: 5 p.m. ET 11/4/15.
Docket Numbers: RP16-71-000.
Applicants: Trailblazer Pipeline Company LLC.
Description: Sec. 4(d) Rate Filing: Neg Rate 2015-10-23 Twin Eagle
& Tenaska Extension w HK to be effective 11/1/2015.
Filed Date: 10/23/15.
Accession Number: 20151023-5329.
Comments Due: 5 p.m. ET 11/4/15.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and Sec. 385.214) on or
before 5:00 p.m. Eastern time on the specified comment date. Protests
may be considered, but intervention is necessary to become a party to
the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP14-247-000.
Applicants: Sea Robin Pipeline Company, LLC.
Description: Report Filing: RP14-247 Rate Case Refund Report.
Filed Date: 10/23/15.
Accession Number: 20151023-5115.
Comments Due: 5 p.m. ET 11/4/15.
Docket Numbers: RP16-41-001.
Applicants: Iroquois Gas Transmission System, L.P.
Description: Tariff Amendment: 10/23/15 Negotiated Rates--Emera
Energy
[[Page 67395]]
Services, Inc. (RTS) 2715-24 & -25 AMND to be effective 11/1/2015.
Filed Date: 10/23/15.
Accession Number: 20151023-5261.
Comments Due: 5 p.m. ET 11/4/15.
Any person desiring to protest in any of the above proceedings must
file in accordance with Rule 211 of the Commission's Regulations (18
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified
comment date.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: October 26, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-27844 Filed 10-30-15; 8:45 am]
BILLING CODE 6717-01-P