Combined Notice of Filings #2, 67392-67393 [2015-27843]
Download as PDF
67392
Federal Register / Vol. 80, No. 211 / Monday, November 2, 2015 / Notices
Respondents/Affected Public: State,
Local and Tribal Government.
Total Estimated Number of Annual
Responses: 450.
Total Estimated Number of Annual
Burden Hours: 4,500.
Abstract: This supporting statement
serves as an update to approved OMB
package 1810–0669. Implemented under
the No Child Left Behind Act of 2001,
Title II, Part B, the Mathematics and
Science Partnerships (MSP) program is
a formula grant program strategically
designed to improve the content
knowledge of teachers and the academic
performance of students in mathematics
and science. By funding collaborative
partnerships between science,
technology, engineering, and
mathematics (STEM) departments at
institutions of higher education (IHEs),
and high-need school districts, the MSP
program enables the delivery of
intensive, content-rich professional
development intended to improve
classroom instruction and, ultimately, to
raise student achievement in math and
science.
Because MSP is a formula grant
program, the size of individual state
awards is based on student population
and poverty rates, with no state
receiving less than one half of one
percent of the total appropriation. Each
state is then responsible for
administering a competitive grant
making process to determine the
distribution of funds across proposed
MSP projects.
Dated: October 27, 2015.
Tomakie Washington,
Acting Director, Information Collection
Clearance Division, Office of the Chief Privacy
Officer, Office of Management.
[FR Doc. 2015–27778 Filed 10–30–15; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–1451–001.
Applicants: California Independent
System Operator Corporation.
Description: Compliance filing: 2015–
10–26 Filing in Compliance with Sept
25 2015 Order in Docket ER15–1451 to
be effective 9/25/2015.
Filed Date: 10/26/15.
Accession Number: 20151026–5417.
Comments Due: 5 p.m. ET 11/16/15.
VerDate Sep<11>2014
18:55 Oct 30, 2015
Jkt 238001
Docket Numbers: ER15–2208–002.
Applicants: ISO New England Inc.
Description: Compliance filing:
Winter Reliability Compliance Filing to
be effective 9/14/2015.
Filed Date: 10/26/15.
Accession Number: 20151026–5241.
Comments Due: 5 p.m. ET 11/16/15.
Docket Numbers: ER16–142–000.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Cancellation:
Notice of Termination of McAllister
Ranch ID IA and WDT SA to be effective
12/31/2015.
Filed Date: 10/26/15.
Accession Number: 20151026–5007.
Comments Due: 5 p.m. ET 11/16/15.
Take notice that the Commission
received the following land acquisition
reports:
Docket Numbers: LA15–3–000.
Applicants: Alabama Electric
Marketing, LLC, Astoria Generating
Company, L.P., Big Sandy Peaker Plant,
LLC, California Electric Marketing, LLC,
Crete Energy Venture, LLC, CSOLAR IV
South, LLC, CSOLAR IV West, LLC,
High Desert Power Project, LLC, Kiowa
Power Partners, LLC, Lincoln
Generating Facility, LLC, New Covert
Generating Company, LLC, New Mexico
Electric Marketing, LLC, Rolling Hills
Generating, L.L.C., Tenaska Alabama
Partners, L.P., Tenaska Alabama II
Partners, L.P., Tenaska Frontier
Partners, Ltd., Tenaska Gateway
Partners, Ltd., Tenaska Georgia Partners,
L.P., Tenaska Power Management, LLC,
Tenaska Power Services Co., Tenaska
Virginia Partners, L.P., Texas Electric
Marketing, LLC, TPF Generation
Holdings, LLC, Wolf Hills Energy, LLC.
Description: Quarterly Land
Acquisition Report of the Tenaska MBR
Sellers.
Filed Date: 10/26/15.
Accession Number: 20151026–5430.
Comments Due: 5 p.m. ET 11/16/15.
Take notice that the Commission
received the following PURPA
210(m)(3) filings:
Docket Numbers: QM14–3–000.
Applicants: Entergy Arkansas, Inc.,
Entergy Gulf States Louisiana, L.L.C.,
Entergy Louisiana, LLC, Entergy
Mississippi, Inc., Entergy New Orleans,
Inc., Entergy Services, Inc., Entergy
Texas, Inc., Entergy Services, Inc.
Description: Response to Third
Deficiency Letter of Entergy Services,
Inc., et al.
Filed Date: 10/23/15.
Accession Number: 20151023–5371.
Comments Due: 5 p.m. ET 11/20/15.
Take notice that the Commission
received the following electric
reliability filings:
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
Docket Numbers: RD15–5–000; RD15–
5–001; RD15–6–000.
Applicants: North American Electric
Reliability Corporation.
Description: Clarifying Supplemental
Information of the North American
Electric Reliability Corporation
Updating Implementation Plan.
Filed Date: 10/23/15.
Accession Number: 20151023–5403.
Comments Due: 5 p.m. ET 11/3/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 27, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–27842 Filed 10–30–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER14–2238–001.
Applicants: Repsol Energy North
America Corporation.
Description: Notice of Change in
Status of Repsol Energy North America
Corporation.
Filed Date: 10/27/15.
Accession Number: 20151027–5208.
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: ER15–623–008.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Revisions to the OATT and RAA to
comply fully with the June 22 Order to
be effective 7/22/2015.
Filed Date: 10/27/15.
Accession Number: 20151027–5246.
E:\FR\FM\02NON1.SGM
02NON1
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 211 / Monday, November 2, 2015 / Notices
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: ER16–143–000.
Applicants: Citizens Sunrise
Transmission LLC.
Description: § 205(d) Rate Filing:
Annual TRBAA Filing to be effective
1/1/2016.
Filed Date: 10/27/15.
Accession Number: 20151027–5029.
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: ER16–144–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Illinois Company.
Description: § 205(d) Rate Filing:
2015–10–27_SA 2861 ATXI–AIC
Construction Agreement—Ipava
Substation to be effective 10/27/2015.
Filed Date: 10/27/15.
Accession Number: 20151027–5121.
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: ER16–145–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
312 7th Revised—NITSA with Southern
Montana to be effective 11/1/2015.
Filed Date: 10/27/15.
Accession Number: 20151027–5123.
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: ER16–146–000.
Applicants: NorthWestern
Corporation.
Description: Initial rate filing: SA
760—NITSA with Beartooth Electric
Cooperative to be effective 11/1/2015.
Filed Date: 10/27/15.
Accession Number: 20151027–5134.
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: ER16–147–000.
Applicants: Northern States Power
Company, a Minnesota corporation.
Description: § 205(d) Rate Filing:
2015–10–27 NSP–SEY, StJms, HILLS,NOC to be effective 1/1/2016.
Filed Date: 10/27/15.
Accession Number: 20151027–5186.
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: ER16–148–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: 4
GIAs & 4 Distribution Serv Agmts with
FTS Master Tenant 1, LLC to be
effective 12/27/2015.
Filed Date: 10/27/15.
Accession Number: 20151027–5189.
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: ER16–149–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2015–10–27_SA 2854 MDU–MDU
Facilities Construction Agreement
(F109) to be effective 10/28/2015.
Filed Date: 10/27/15.
Accession Number: 20151027–5245.
VerDate Sep<11>2014
18:55 Oct 30, 2015
Jkt 238001
67393
[Project No. 184–244]
amended, and the Federal Energy
Regulatory Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed an application to
amend the El Dorado Project license
filed by El Dorado Irrigation District
(licensee). The licensee proposes
constructing an earthen stability
buttress, raising the crest of the dam,
and upgrading appurtenant facilities. No
Federal lands would be involved in the
proposed action. The project is located
on the South Fork American River
adjacent to the unincorporated
community of Pollock Pines in El
Dorado, County, California.
An environmental assessment (EA)
has been prepared for Commission
staff’s review of the proposed action,
containing staff’s analysis of the
proposed action and concluding that
approval of the proposal, with staff’s
recommended measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment. The EA is
available for electronic review and
reproduction at the Commission’s
Public Reference Room, located at 888
First Street NE., Room 2A, Washington,
DC 20426. The EA may also be viewed
on the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number (P–184) in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3372 or for TTY, (202)
502–8659.
Any comments on the EA should be
filed by November 27, 2015, and
addressed to Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1–A, Washington, DC 20426. Please
reference the project name and project
number (P–184–244) on all comments
filed. Comments may be filed
electronically via the Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘eFiling’’ link. For further
information, please contact CarLisa
Linton at (202) 502–8416 or
Carlisa.linton-peters@ferc.gov.
El Dorado Irrigation District; Notice of
Availability of Environmental
Assessment
Dated: October 26, 2015.
Kimberly D. Bose,
Secretary.
In accordance with the National
Environmental Policy Act of 1969, as
[FR Doc. 2015–27804 Filed 10–30–15; 8:45 am]
Comments Due: 5 p.m. ET 11/17/15.
Take notice that the Commission
received the following land acquisition
reports:
Docket Numbers: LA15–3–000.
Applicants: Bayonne Energy Center,
LLC, Zone J Tolling Co., LLC, Macquarie
Energy LLC.
Description: Quarterly Land
Acquisition Report of Bayonne Energy
Center, LLC, et al.
Filed Date: 10/27/15.
Accession Number: 20151027–5233.
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: LA15–3–000.
Applicants: Battery Utility of Ohio,
LLC, Border Winds Energy, LLC,
Pleasant Valley Wind, LLC, Joliet
Battery Storage LLC, West Chicago
Battery Storage LLC.
Description: Quarterly Land
Acquisition Report of Battery Utility of
Ohio, LLC, et al.
Filed Date: 10/27/15.
Accession Number: 20151027–5234.
Comments Due: 5 p.m. ET 11/17/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 27, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–27843 Filed 10–30–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
PO 00000
Frm 00012
Fmt 4703
Sfmt 9990
BILLING CODE 6717–01–P
E:\FR\FM\02NON1.SGM
02NON1
Agencies
[Federal Register Volume 80, Number 211 (Monday, November 2, 2015)]
[Notices]
[Pages 67392-67393]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-27843]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER14-2238-001.
Applicants: Repsol Energy North America Corporation.
Description: Notice of Change in Status of Repsol Energy North
America Corporation.
Filed Date: 10/27/15.
Accession Number: 20151027-5208.
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: ER15-623-008.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing: Revisions to the OATT and RAA to
comply fully with the June 22 Order to be effective 7/22/2015.
Filed Date: 10/27/15.
Accession Number: 20151027-5246.
[[Page 67393]]
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: ER16-143-000.
Applicants: Citizens Sunrise Transmission LLC.
Description: Sec. 205(d) Rate Filing: Annual TRBAA Filing to be
effective 1/1/2016.
Filed Date: 10/27/15.
Accession Number: 20151027-5029.
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: ER16-144-000.
Applicants: Midcontinent Independent System Operator, Inc., Ameren
Illinois Company.
Description: Sec. 205(d) Rate Filing: 2015-10-27_SA 2861 ATXI-AIC
Construction Agreement--Ipava Substation to be effective 10/27/2015.
Filed Date: 10/27/15.
Accession Number: 20151027-5121.
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: ER16-145-000.
Applicants: NorthWestern Corporation.
Description: Sec. 205(d) Rate Filing: SA 312 7th Revised--NITSA
with Southern Montana to be effective 11/1/2015.
Filed Date: 10/27/15.
Accession Number: 20151027-5123.
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: ER16-146-000.
Applicants: NorthWestern Corporation.
Description: Initial rate filing: SA 760--NITSA with Beartooth
Electric Cooperative to be effective 11/1/2015.
Filed Date: 10/27/15.
Accession Number: 20151027-5134.
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: ER16-147-000.
Applicants: Northern States Power Company, a Minnesota corporation.
Description: Sec. 205(d) Rate Filing: 2015-10-27 NSP-SEY, StJms,
HILLS,-NOC to be effective 1/1/2016.
Filed Date: 10/27/15.
Accession Number: 20151027-5186.
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: ER16-148-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: 4 GIAs & 4 Distribution Serv
Agmts with FTS Master Tenant 1, LLC to be effective 12/27/2015.
Filed Date: 10/27/15.
Accession Number: 20151027-5189.
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: ER16-149-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2015-10-27_SA 2854 MDU-MDU
Facilities Construction Agreement (F109) to be effective 10/28/2015.
Filed Date: 10/27/15.
Accession Number: 20151027-5245.
Comments Due: 5 p.m. ET 11/17/15.
Take notice that the Commission received the following land
acquisition reports:
Docket Numbers: LA15-3-000.
Applicants: Bayonne Energy Center, LLC, Zone J Tolling Co., LLC,
Macquarie Energy LLC.
Description: Quarterly Land Acquisition Report of Bayonne Energy
Center, LLC, et al.
Filed Date: 10/27/15.
Accession Number: 20151027-5233.
Comments Due: 5 p.m. ET 11/17/15.
Docket Numbers: LA15-3-000.
Applicants: Battery Utility of Ohio, LLC, Border Winds Energy, LLC,
Pleasant Valley Wind, LLC, Joliet Battery Storage LLC, West Chicago
Battery Storage LLC.
Description: Quarterly Land Acquisition Report of Battery Utility
of Ohio, LLC, et al.
Filed Date: 10/27/15.
Accession Number: 20151027-5234.
Comments Due: 5 p.m. ET 11/17/15.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and Sec. 385.214) on or
before 5:00 p.m. Eastern time on the specified comment date. Protests
may be considered, but intervention is necessary to become a party to
the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: October 27, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-27843 Filed 10-30-15; 8:45 am]
BILLING CODE 6717-01-P