Cave Run Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 67394 [2015-27805]
Download as PDF
67394
Federal Register / Vol. 80, No. 211 / Monday, November 2, 2015 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14376–002]
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Cave Run Energy, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On August 14, 2015, Cave Run
Energy, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of a
hydropower project located at the U.S.
Army Corps of Engineers’ (Corps) Cave
Run Dam, located on the Licking River
in Rowan and Bath Counties, Kentucky.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) A bifurcation structure
constructed at the end of the dam’s
outlet conduit; (2) a powerhouse
containing three turbine/generating
units with a total capacity of 4.95
megawatts; (3) a 70-foot-long, 150-inchdiameter steel penstock; (4) a 1,200-footlong, 12.7-kilovolt transmission line.
The proposed project would have an
average annual generation of 20,000
megawatt-hours, and operate utilizing
surplus water from the Cave Run Dam,
as directed by the Corps.
Applicant Contact: Mr. Mark
Boumansour, Cave Run Energy, LLC,
1401 Walnut St., Suite 220, Boulder, CO
80302. (303) 440–3378.
FERC Contact: Dustin Wilson, phone:
(202) 502–6528.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
VerDate Sep<11>2014
18:55 Oct 30, 2015
Jkt 238001
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14376–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: October 26, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–27805 Filed 10–30–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP16–65–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing: PCB
TETLP DEC 2015 FILING to be effective
12/1/2015.
Filed Date: 10/21/15.
Accession Number: 20151021–5080.
Comments Due: 5 p.m. ET 11/2/15.
Docket Numbers: RP16–66–000.
Applicants: ANR Pipeline Company.
Description: ANR Pipeline Company
Request for Waiver of FERC Gas Tariff
Part 6.3 of the General Terms &
Conditions.
Filed Date: 10/21/15.
Accession Number: 20151021–5156.
Comments Due: 5 p.m. ET 11/2/15.
Docket Numbers: RP16–67–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
KeySpan Ramapo 11–1–2015 Release to
BUG to be effective 11/1/2015.
Filed Date: 10/23/15.
Accession Number: 20151023–5073.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
Comments Due: 5 p.m. ET 11/4/15.
Docket Numbers: RP16–68–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rate—Chevron TEAM2014
Release to Sequent 8938592 to be
effective 11/1/2015.
Filed Date: 10/23/15.
Accession Number: 20151023–5096.
Comments Due: 5 p.m. ET 11/4/15.
Docket Numbers: RP16–69–000.
Applicants: Clear Creek Storage
Company, L.L.C.
Description: Compliance filing Clear
Creek Storage Company, L.L.C.—Order
No. 801 Compliance Filing to be
effective 11/23/2015.
Filed Date: 10/23/15.
Accession Number: 20151023–5163.
Comments Due: 5 p.m. ET 11/4/15.
Docket Numbers: RP16–70–000.
Applicants: Exelon Generating
Company, LLC, Summit Natural Gas of
Maine.
Description: Joint Petition of Exelon
Generating Company, LLC and Summit
Natural Gas of Maine, Inc. for Limited
Waivers and Clarification under RP16–
70.
Filed Date: 10/23/15.
Accession Number: 20151023–5264.
Comments Due: 5 p.m. ET 11/4/15.
Docket Numbers: RP16–71–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2015–10–23 Twin Eagle & Tenaska
Extension w HK to be effective 11/1/
2015.
Filed Date: 10/23/15.
Accession Number: 20151023–5329.
Comments Due: 5 p.m. ET 11/4/15.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP14–247–000.
Applicants: Sea Robin Pipeline
Company, LLC.
Description: Report Filing: RP14–247
Rate Case Refund Report.
Filed Date: 10/23/15.
Accession Number: 20151023–5115.
Comments Due: 5 p.m. ET 11/4/15.
Docket Numbers: RP16–41–001.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: Tariff Amendment: 10/
23/15 Negotiated Rates—Emera Energy
E:\FR\FM\02NON1.SGM
02NON1
Agencies
[Federal Register Volume 80, Number 211 (Monday, November 2, 2015)]
[Notices]
[Page 67394]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-27805]
[[Page 67394]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14376-002]
Cave Run Energy, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On August 14, 2015, Cave Run Energy, LLC filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of a hydropower project
located at the U.S. Army Corps of Engineers' (Corps) Cave Run Dam,
located on the Licking River in Rowan and Bath Counties, Kentucky. The
sole purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of the following: (1) A
bifurcation structure constructed at the end of the dam's outlet
conduit; (2) a powerhouse containing three turbine/generating units
with a total capacity of 4.95 megawatts; (3) a 70-foot-long, 150-inch-
diameter steel penstock; (4) a 1,200-foot-long, 12.7-kilovolt
transmission line. The proposed project would have an average annual
generation of 20,000 megawatt-hours, and operate utilizing surplus
water from the Cave Run Dam, as directed by the Corps.
Applicant Contact: Mr. Mark Boumansour, Cave Run Energy, LLC, 1401
Walnut St., Suite 220, Boulder, CO 80302. (303) 440-3378.
FERC Contact: Dustin Wilson, phone: (202) 502-6528.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14376-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: October 26, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-27805 Filed 10-30-15; 8:45 am]
BILLING CODE 6717-01-P