Delta Research Station, Sacramento, CA; Draft Environmental Impact Report/Environmental Impact Statement, and Announcement of Public Meetings, 66926-66927 [2015-27683]
Download as PDF
66926
Federal Register / Vol. 80, No. 210 / Friday, October 30, 2015 / Notices
Landholding Agency: Navy
Property Number: 77201540003
Status: Underutilized
Directions: FAC#483; FAC#482; FAC#482A;
FAC#479; FAC#390; FAC#455; FAC#399A;
FAC#5160; 10.56 acres; 9.10 acres.
Comments: public access denied and no
alternative method to gain access without
compromising national security.
Reasons: Secured Area
Mississippi
2 Buildings
Stennis Space Center
Hancock County MS 39529
Landholding Agency: NASA
Property Number: 71201540002
Status: Unutilized
Directions: Building 4312 & 8304
Comments: public access denied and no
alternative method to gain access without
compromising national security.
Reasons: Secured Area
Ohio
Radio Building & Tower
23560 Jenkins Dam Road
Glouster OH 45732
Landholding Agency: COE
Property Number: 31201540001
Status: Unutilized
Directions: TJE–01–X01
Comments: public access denied and no
alternative method to gain access without
compromising national security.
Reasons: Secured Area
[FR Doc. 2015–27365 Filed 10–29–15; 8:45 am]
BILLING CODE 4210–67–P
DEPARTMENT OF THE INTERIOR
Fish and Wildlife Service
[FWS–R8–FAC–2015–N163];
[FRFR48370810680–XXX–FF08F00000]
Delta Research Station, Sacramento,
CA; Draft Environmental Impact
Report/Environmental Impact
Statement, and Announcement of
Public Meetings
Fish and Wildlife Service,
Interior.
ACTION: Notice of availability; request
for comments.
AGENCY:
tkelley on DSK3SPTVN1PROD with NOTICES
VerDate Sep<11>2014
17:37 Oct 29, 2015
Jkt 238001
Comments on the Draft EIR/EIS
must be received or postmarked by 5
p.m. Pacific Time on December 14,
2015. Two public meetings will be held
to receive comments on the Draft EIR/
EIS. See the SUPPLEMENTARY
INFORMATION section for meeting dates
and times. The public meetings are
physically accessible to people with
disabilities. Requests for reasonable
accommodations (e.g., auxiliary aids or
sign language interpretation) should be
directed to Michael Stevenson of
Horizon Water & Environment at (510)
986–1852, at least 5 working days prior
to the applicable meeting date.
ADDRESSES: To view or download the
Draft EIR/EIS, or for a list of locations
to view hard-bound copies, go to
www.deltaresearchstation.com.
You may submit written comments by
one of the following methods:
1. By email: Submit comments to
comments@deltaresearchstation.com.
2. By hard-copy: Submit comments by
U.S. mail or by hand-delivery, to
USFWS, Attn: Barbara Beggs, 650
Capitol Mall Suite 8–300, Sacramento,
CA 95814.
For how to view comments on the EIS
from the Environmental Protection
Agency (EPA), or for information on
EPA’s role in the EIS process, see EPA’s
Role in the EIS Process under
SUPPLEMENTARY INFORMATION.
FOR FURTHER INFORMATION CONTACT:
Barbara Beggs, USFWS, at 916–930–
5603.
DATES:
SUPPLEMENTARY INFORMATION:
Introduction
This notice announces the
availability of the Delta Research Station
Draft Environmental Impact Report/
Environmental Impact Statement (EIR/
EIS) for public review and comment.
The Draft EIR/EIS evaluates impacts
regarding construction and operation of
the Delta Research Station (DRS) in the
San Francisco Bay/Sacramento-San
Joaquin Delta Estuary (Bay-Delta),
California. The planned DRS would
consist of two facilities, a proposed
Estuarine Research Station (ERS) and
Fish Technology Center (FTC). The U.S.
Fish and Wildlife Service (USFWS) is
SUMMARY:
the lead Federal agency responsible for
coordinating the environmental analysis
for the proposed action under the
National Environmental Policy Act
(NEPA). The California Department of
Water Resources (DWR) is the lead State
agency responsible for coordinating the
environmental analysis under the
California Environmental Quality Act
(CEQA).
With this notice, we continue the
process for developing a DRS, which we
began by publishing a notice of intent
for scoping in the Federal Register on
December 10, 2014 (79 FR 73332). In
addition to this notice of the draft EIR/
EIS, EPA is publishing a notice
announcing the draft EIS, as required
under section 309 of the Clean Air Act
(42 U.S.C. 7401 et seq.). The publication
of EPA’s notice is the official start of the
minimum requirement for a 45-day
public comment period for an EIS (see
EPA’s Role in the EIS Process under
SUPPLEMENTARY INFORMATION).
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
Background
The proposed DRS would consolidate
ongoing Interagency Ecological Program
(IEP) research and monitoring activities
throughout the Bay-Delta and provide
facilities for study and production of
endangered Delta fishes. Currently, the
IEP has approximately 145 State and
Federal employees who conduct
research throughout the Bay-Delta. The
IEP collaboratively monitors, researches,
models, and synthesizes critical
information for adaptive management
water project operations, planning, and
regulatory purposes relative to the
aquatic ecosystem in the Bay-Delta.
USFWS and DWR plan to construct the
DRS in a centrally located area within
the Bay-Delta, and the facilities are
expected to enhance interagency
coordination and collaboration.
Purpose
The purpose of the DRS is to enhance
interagency coordination and
collaboration by developing a shared
research facility. Currently, Federal and
State agency staff working on similar
Bay-Delta issues are distributed among
different locations that are often remote
from the Bay-Delta. Construction and
operation of the DRS would reduce
travel times and costs and improve
research and monitoring activity
efficiency. The ERS would consolidate
existing IEP programs currently located
throughout the Delta, and the FTC
would house a new program to develop
and apply captive fish propagation
technologies in support of population
restoration.
The specific objectives of each
component of the DRS are as follows:
D ERS—
—Establish a research station in a
central location within the Bay-Delta
to facilitate conducting monitoring
and research; and
—Co-locate the research station with a
facility capable of studying fish in
captivity (i.e., the FTC); and
—Provide facilities to conduct
monitoring and research on the BayDelta’s aquatic resources.
D FTC—
—Develop captive propagation
technologies for the Bay-Delta’s rare
fish species;
—Test and refine the captive
propagation techniques;
—Locate the facility where suitable
water quality and quantity are
available, and ability to discharge
waste water is available, given the
facility’s various functions and
operations; and
—Co-locate the FTC with a facility
conducting conservation research on
E:\FR\FM\30OCN1.SGM
30OCN1
Federal Register / Vol. 80, No. 210 / Friday, October 30, 2015 / Notices
Bay-Delta rare fish species (i.e., the
ERS).
tkelley on DSK3SPTVN1PROD with NOTICES
Project Area
Two alternative locations are
evaluated in the Draft EIR/EIS: The Rio
Vista Army Reserve Center (RVARC) site
in the City of Rio Vista and a site
located at 845 Ryde Avenue in the City
of Stockton (Ryde Avenue site).
Project Overview
The Draft EIR/EIS analyzes three
action alternatives, as well as the No
Project Alternative.
The No Project Alternative would be
a continuation of existing conditions.
For the action alternatives, certain
components would be the same for all
alternatives. For the ERS, these include
provision of office space; boat storage
facilities, including a marina; a boat/
equipment wash facility; laboratory
facilities; shop space; and a storage
building. For the FTC, common
components include three buildings
with aquaculture and research
components for the study of individual
fish species; an office and
administrative building; a shop and
vehicle storage building; a surface water
intake and groundwater wells, a surface
water treatment facility, and an effluent
treatment system.
As required by NEPA, the Draft EIR/
EIS identifies direct, indirect, and
cumulative effects, and possible
mitigation for those effects, on
biological resources, land use, air
quality, water resources,
socioeconomics, environmental justice,
cultural resources, and other
environmental resources that could
occur with implementation of each
alternative. A summary of each
alternative is provided below.
No Project Alternative: Under this
alternative, no DRS facilities would be
built and existing IEP activities would
continue at their current locations.
Some of the existing IEP activities that
would continue to operate from various
offices are fish population estimates, net
surveys, and estuarine and marine fish
abundance and distribution surveys. No
FTC would be built.
Alternative 2: This alternative would
be located at the RVARC site on the
southern edge of Rio Vista. Alternative
2 is the preferred alternative of DWR
and USFWS, and would include all of
the components described above for the
action alternatives. Under Alternative 2,
development of ERS and FTC facilities
would be consolidated in the
predominantly undeveloped portions of
the site, and the marina would be
established in the Sacramento River at
the southeastern end of the site. The
VerDate Sep<11>2014
17:37 Oct 29, 2015
Jkt 238001
development footprint would be
approximately 14 acres. Several existing
buildings at the RVARC would be
demolished.
Alternative 3: Alternative 3 would
include all of the components described
above, and would also be located at the
RVARC site. The development footprint
under Alternative 3 would be
approximately 18 acres. Alternative 3
would demolish or repurpose some
existing buildings situated adjacent to
the Sacramento River. The marina and
other ERS facilities would be
constructed within the northern and
northeastern portions of the site. In
contrast with Alternative 2, the marina
would be excavated in an upland
portion of the site.
Alternative 4: Alternative 4 would be
located at 845 Ryde Avenue in Stockton.
This alternative would include all of the
components described above. No
existing buildings are located at the
Ryde Avenue site, so no buildings
would be demolished or repurposed.
Similar to Alternative 3, the marina
would be excavated in an upland
portion of the site.
NEPA Compliance
We are conducting environmental
review in accordance with the
requirements of NEPA, as amended (42
U.S.C. 4321 et seq.), its implementing
regulations (40 CFR part 1500 et seq.),
other applicable regulations, and our
procedures for compliance with those
regulations. The Draft EIR/EIS discusses
the direct, indirect, and cumulative
impacts of the alternatives on biological
resources, cultural resources, water
quality, and other environmental
resources. Measures to minimize
adverse environmental effects are
identified and discussed in the Draft
EIR/EIS.
EPA’s Role in the EIS Process
The EPA is charged under section 309
of the Clean Air Act to review all
Federal agencies’ EISs and to comment
on the adequacy and the acceptability of
the environmental impacts of proposed
actions in the EISs.
EPA also serves as the repository (EIS
database) for EISs prepared by Federal
agencies and provides notice of their
availability in the Federal Register. The
EIS database provides information about
EISs prepared by Federal agencies, as
well as EPA’s comments concerning the
EISs. All EISs are filed with EPA, which
publishes a notice of availability on
Fridays in the Federal Register.
For more information, see https://
www.epa.gov/compliance/nepa/
eisdata.html. You may search for EPA
comments on EISs, along with EISs
PO 00000
Frm 00062
Fmt 4703
Sfmt 9990
66927
themselves, at https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
Public Meeting Information
Two public meetings will be held to
provide an overview of the project and
allow public comment and discussion.
Meeting dates, times, and locations will
be announced in local media and at
www.deltaresearchstation.com.
Public Comments
This notice is provided pursuant to
NEPA. Submitting timely comments to
the email and hard-copy addresses
identified in the ADDRESSES section of
this notice will also constitute effective
filing of the CEQA comments on the EIR
portion of the Draft EIR/EIS. USFWS is
publishing this notice to allow other
agencies and the public an opportunity
to review and comment on this
document. All comments received will
become part of the public record for this
action. Comments on the Draft EIR/EIS
should be submitted to the address
listed in the ADDRESSES section of this
document. Comments submitted to the
above address will be reviewed and
considered by all of the lead agencies.
Public Availability of Comments
Before including your address, phone
number, email address, or other
personal identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
While you may ask us in your comment
to withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Next Steps
The lead agencies will compile and
review all public comments on the Draft
EIR/EIS submitted to them prior to
preparation of a Final EIR/EIS.
Alexandra Pitts,
Deputy Regional Director, Pacific Southwest
Region, Fish and Wildlife Service.
[FR Doc. 2015–27683 Filed 10–29–15; 8:45 am]
BILLING CODE 4333–15–P
E:\FR\FM\30OCN1.SGM
30OCN1
Agencies
[Federal Register Volume 80, Number 210 (Friday, October 30, 2015)]
[Notices]
[Pages 66926-66927]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-27683]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Fish and Wildlife Service
[FWS-R8-FAC-2015-N163]; [FRFR48370810680-XXX-FF08F00000]
Delta Research Station, Sacramento, CA; Draft Environmental
Impact Report/Environmental Impact Statement, and Announcement of
Public Meetings
AGENCY: Fish and Wildlife Service, Interior.
ACTION: Notice of availability; request for comments.
-----------------------------------------------------------------------
SUMMARY: This notice announces the availability of the Delta Research
Station Draft Environmental Impact Report/Environmental Impact
Statement (EIR/EIS) for public review and comment. The Draft EIR/EIS
evaluates impacts regarding construction and operation of the Delta
Research Station (DRS) in the San Francisco Bay/Sacramento-San Joaquin
Delta Estuary (Bay-Delta), California. The planned DRS would consist of
two facilities, a proposed Estuarine Research Station (ERS) and Fish
Technology Center (FTC). The U.S. Fish and Wildlife Service (USFWS) is
the lead Federal agency responsible for coordinating the environmental
analysis for the proposed action under the National Environmental
Policy Act (NEPA). The California Department of Water Resources (DWR)
is the lead State agency responsible for coordinating the environmental
analysis under the California Environmental Quality Act (CEQA).
DATES: Comments on the Draft EIR/EIS must be received or postmarked by
5 p.m. Pacific Time on December 14, 2015. Two public meetings will be
held to receive comments on the Draft EIR/EIS. See the SUPPLEMENTARY
INFORMATION section for meeting dates and times. The public meetings
are physically accessible to people with disabilities. Requests for
reasonable accommodations (e.g., auxiliary aids or sign language
interpretation) should be directed to Michael Stevenson of Horizon
Water & Environment at (510) 986-1852, at least 5 working days prior to
the applicable meeting date.
ADDRESSES: To view or download the Draft EIR/EIS, or for a list of
locations to view hard-bound copies, go to
www.deltaresearchstation.com.
You may submit written comments by one of the following methods:
1. By email: Submit comments to comments@deltaresearchstation.com.
2. By hard-copy: Submit comments by U.S. mail or by hand-delivery,
to USFWS, Attn: Barbara Beggs, 650 Capitol Mall Suite 8-300,
Sacramento, CA 95814.
For how to view comments on the EIS from the Environmental
Protection Agency (EPA), or for information on EPA's role in the EIS
process, see EPA's Role in the EIS Process under SUPPLEMENTARY
INFORMATION.
FOR FURTHER INFORMATION CONTACT: Barbara Beggs, USFWS, at 916-930-5603.
SUPPLEMENTARY INFORMATION:
Introduction
With this notice, we continue the process for developing a DRS,
which we began by publishing a notice of intent for scoping in the
Federal Register on December 10, 2014 (79 FR 73332). In addition to
this notice of the draft EIR/EIS, EPA is publishing a notice announcing
the draft EIS, as required under section 309 of the Clean Air Act (42
U.S.C. 7401 et seq.). The publication of EPA's notice is the official
start of the minimum requirement for a 45-day public comment period for
an EIS (see EPA's Role in the EIS Process under SUPPLEMENTARY
INFORMATION).
Background
The proposed DRS would consolidate ongoing Interagency Ecological
Program (IEP) research and monitoring activities throughout the Bay-
Delta and provide facilities for study and production of endangered
Delta fishes. Currently, the IEP has approximately 145 State and
Federal employees who conduct research throughout the Bay-Delta. The
IEP collaboratively monitors, researches, models, and synthesizes
critical information for adaptive management water project operations,
planning, and regulatory purposes relative to the aquatic ecosystem in
the Bay-Delta. USFWS and DWR plan to construct the DRS in a centrally
located area within the Bay-Delta, and the facilities are expected to
enhance interagency coordination and collaboration.
Purpose
The purpose of the DRS is to enhance interagency coordination and
collaboration by developing a shared research facility. Currently,
Federal and State agency staff working on similar Bay-Delta issues are
distributed among different locations that are often remote from the
Bay-Delta. Construction and operation of the DRS would reduce travel
times and costs and improve research and monitoring activity
efficiency. The ERS would consolidate existing IEP programs currently
located throughout the Delta, and the FTC would house a new program to
develop and apply captive fish propagation technologies in support of
population restoration.
The specific objectives of each component of the DRS are as
follows:
[ssquf] ERS--
--Establish a research station in a central location within the Bay-
Delta to facilitate conducting monitoring and research; and
--Co-locate the research station with a facility capable of studying
fish in captivity (i.e., the FTC); and
--Provide facilities to conduct monitoring and research on the Bay-
Delta's aquatic resources.
[ssquf] FTC--
--Develop captive propagation technologies for the Bay-Delta's rare
fish species;
--Test and refine the captive propagation techniques;
--Locate the facility where suitable water quality and quantity are
available, and ability to discharge waste water is available, given the
facility's various functions and operations; and
--Co-locate the FTC with a facility conducting conservation research on
[[Page 66927]]
Bay-Delta rare fish species (i.e., the ERS).
Project Area
Two alternative locations are evaluated in the Draft EIR/EIS: The
Rio Vista Army Reserve Center (RVARC) site in the City of Rio Vista and
a site located at 845 Ryde Avenue in the City of Stockton (Ryde Avenue
site).
Project Overview
The Draft EIR/EIS analyzes three action alternatives, as well as
the No Project Alternative.
The No Project Alternative would be a continuation of existing
conditions.
For the action alternatives, certain components would be the same
for all alternatives. For the ERS, these include provision of office
space; boat storage facilities, including a marina; a boat/equipment
wash facility; laboratory facilities; shop space; and a storage
building. For the FTC, common components include three buildings with
aquaculture and research components for the study of individual fish
species; an office and administrative building; a shop and vehicle
storage building; a surface water intake and groundwater wells, a
surface water treatment facility, and an effluent treatment system.
As required by NEPA, the Draft EIR/EIS identifies direct, indirect,
and cumulative effects, and possible mitigation for those effects, on
biological resources, land use, air quality, water resources,
socioeconomics, environmental justice, cultural resources, and other
environmental resources that could occur with implementation of each
alternative. A summary of each alternative is provided below.
No Project Alternative: Under this alternative, no DRS facilities
would be built and existing IEP activities would continue at their
current locations. Some of the existing IEP activities that would
continue to operate from various offices are fish population estimates,
net surveys, and estuarine and marine fish abundance and distribution
surveys. No FTC would be built.
Alternative 2: This alternative would be located at the RVARC site
on the southern edge of Rio Vista. Alternative 2 is the preferred
alternative of DWR and USFWS, and would include all of the components
described above for the action alternatives. Under Alternative 2,
development of ERS and FTC facilities would be consolidated in the
predominantly undeveloped portions of the site, and the marina would be
established in the Sacramento River at the southeastern end of the
site. The development footprint would be approximately 14 acres.
Several existing buildings at the RVARC would be demolished.
Alternative 3: Alternative 3 would include all of the components
described above, and would also be located at the RVARC site. The
development footprint under Alternative 3 would be approximately 18
acres. Alternative 3 would demolish or repurpose some existing
buildings situated adjacent to the Sacramento River. The marina and
other ERS facilities would be constructed within the northern and
northeastern portions of the site. In contrast with Alternative 2, the
marina would be excavated in an upland portion of the site.
Alternative 4: Alternative 4 would be located at 845 Ryde Avenue in
Stockton. This alternative would include all of the components
described above. No existing buildings are located at the Ryde Avenue
site, so no buildings would be demolished or repurposed. Similar to
Alternative 3, the marina would be excavated in an upland portion of
the site.
NEPA Compliance
We are conducting environmental review in accordance with the
requirements of NEPA, as amended (42 U.S.C. 4321 et seq.), its
implementing regulations (40 CFR part 1500 et seq.), other applicable
regulations, and our procedures for compliance with those regulations.
The Draft EIR/EIS discusses the direct, indirect, and cumulative
impacts of the alternatives on biological resources, cultural
resources, water quality, and other environmental resources. Measures
to minimize adverse environmental effects are identified and discussed
in the Draft EIR/EIS.
EPA's Role in the EIS Process
The EPA is charged under section 309 of the Clean Air Act to review
all Federal agencies' EISs and to comment on the adequacy and the
acceptability of the environmental impacts of proposed actions in the
EISs.
EPA also serves as the repository (EIS database) for EISs prepared
by Federal agencies and provides notice of their availability in the
Federal Register. The EIS database provides information about EISs
prepared by Federal agencies, as well as EPA's comments concerning the
EISs. All EISs are filed with EPA, which publishes a notice of
availability on Fridays in the Federal Register.
For more information, see https://www.epa.gov/compliance/nepa/eisdata.html. You may search for EPA comments on EISs, along with EISs
themselves, at https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.
Public Meeting Information
Two public meetings will be held to provide an overview of the
project and allow public comment and discussion. Meeting dates, times,
and locations will be announced in local media and at
www.deltaresearchstation.com.
Public Comments
This notice is provided pursuant to NEPA. Submitting timely
comments to the email and hard-copy addresses identified in the
ADDRESSES section of this notice will also constitute effective filing
of the CEQA comments on the EIR portion of the Draft EIR/EIS. USFWS is
publishing this notice to allow other agencies and the public an
opportunity to review and comment on this document. All comments
received will become part of the public record for this action.
Comments on the Draft EIR/EIS should be submitted to the address listed
in the ADDRESSES section of this document. Comments submitted to the
above address will be reviewed and considered by all of the lead
agencies.
Public Availability of Comments
Before including your address, phone number, email address, or
other personal identifying information in your comment, you should be
aware that your entire comment--including your personal identifying
information--may be made publicly available at any time. While you may
ask us in your comment to withhold your personal identifying
information from public review, we cannot guarantee that we will be
able to do so.
Next Steps
The lead agencies will compile and review all public comments on
the Draft EIR/EIS submitted to them prior to preparation of a Final
EIR/EIS.
Alexandra Pitts,
Deputy Regional Director, Pacific Southwest Region, Fish and Wildlife
Service.
[FR Doc. 2015-27683 Filed 10-29-15; 8:45 am]
BILLING CODE 4333-15-P