Empire State Hydro 302, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 65993 [2015-27407]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 208 / Wednesday, October 28, 2015 / Notices
100 years old, has undergone significant
deterioration, most recently during a
high-flow event in 2011. The proposed
new diversion dam was designed by the
Green River Conservation District and
the exemptee in consultation with
federal and state resource agencies to
ensure a continued supply of
agricultural water for local irrigators,
and to improve public safety and fish
passage. The work would not result in
any significant changes to water levels
or project operation.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1 (866) 208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
VerDate Sep<11>2014
19:16 Oct 27, 2015
Jkt 238001
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the amendment
application. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: October 21, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–27405 Filed 10–27–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14703–000]
Empire State Hydro 302, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On August 25, 2015, Empire State
Hydro 302, LLC, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Braendly Dam Hydroelectric
Project to be located on Fishkill River in
Dutchess County, New York. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would
redevelop an abandoned project and
consist of: (1) An existing 130-foot-long,
PO 00000
Frm 00011
Fmt 4703
Sfmt 9990
65993
18-foot-high cut stone with a concrete
cap dam creating a reservoir with a
surface area of approximately 3 acres
and a storage capacity of 15 acre-feet at
a normal water surface elevation of
119.5 feet mean sea level; (2) a new 6foot-diameter, 300-foot-long steel
penstock; (3) a new 50-foot-long by 35foot-wide powerhouse containing two
Kaplan turbine units with a rated
capacity of 450 kilowatts each; and (4)
a new 12.7-kilovolt, 500-foot-long
transmission line. The project would
have an annual generation of 3,200
megawatt-hours.
Applicant Contact: Mark
Boumansour, Empire State Hydro 302,
LLC, 1401 Walnut Street, Suite 220,
Boulder, CO 80302; phone: 303–440–
3378.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14703–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14703) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: October 22, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–27407 Filed 10–27–15; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\28OCN1.SGM
28OCN1
Agencies
[Federal Register Volume 80, Number 208 (Wednesday, October 28, 2015)]
[Notices]
[Page 65993]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-27407]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14703-000]
Empire State Hydro 302, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On August 25, 2015, Empire State Hydro 302, LLC, filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Braendly Dam Hydroelectric Project to be located on Fishkill River in
Dutchess County, New York. The sole purpose of a preliminary permit, if
issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
The proposed project would redevelop an abandoned project and
consist of: (1) An existing 130-foot-long, 18-foot-high cut stone with
a concrete cap dam creating a reservoir with a surface area of
approximately 3 acres and a storage capacity of 15 acre-feet at a
normal water surface elevation of 119.5 feet mean sea level; (2) a new
6-foot-diameter, 300-foot-long steel penstock; (3) a new 50-foot-long
by 35-foot-wide powerhouse containing two Kaplan turbine units with a
rated capacity of 450 kilowatts each; and (4) a new 12.7-kilovolt, 500-
foot-long transmission line. The project would have an annual
generation of 3,200 megawatt-hours.
Applicant Contact: Mark Boumansour, Empire State Hydro 302, LLC,
1401 Walnut Street, Suite 220, Boulder, CO 80302; phone: 303-440-3378.
FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14703-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14703) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: October 22, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-27407 Filed 10-27-15; 8:45 am]