Lee R. and A. Leon Thayn; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 65992-65993 [2015-27405]
Download as PDF
65992
Federal Register / Vol. 80, No. 208 / Wednesday, October 28, 2015 / Notices
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with he Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a) (1) (iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: October 22, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–27400 Filed 10–27–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR16–1–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Bayou Bridge Pipeline, LLC; Notice of
Petition for Declaratory Order
Take notice that on October 19, 2015,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2015),
Bayou Bridge Pipeline, LLC (Petitioner),
filed a petition for a declaratory order
seeking approval of the specified rate
structure, terms of service, and
prorationing methodology for the
proposed Bayou Bridge pipeline project
(the ‘‘Bayou Bridge Project’’). Petitioner
states that the Bayou Bridge Project is
VerDate Sep<11>2014
19:16 Oct 27, 2015
Jkt 238001
intended to provide cost-effective crude
oil pipeline transportation from the
crude oil terminals, storage, and
transportation hub in the vicinity of
Nederland, Texas, to refineries and
markets in Louisiana, all as more fully
explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive notification when a document is
added to a subscribed docket(s). For
assistance with any FERC Online
service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on November 19, 2015.
Dated: October 22, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–27403 Filed 10–27–15; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6643–015]
Lee R. and A. Leon Thayn; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
of Exemption.
b. Project No: 6643–015.
c. Date Filed: October 19, 2015.
d. Applicant: Lee R. and A. Leon
Thayn.
e. Name of Projects: Thayn Project.
f. Location: The project is located on
the Green River, along the boundary of
Grand and Emory Counties, Utah.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Lee R. Thayn,
P.O. Box 447, Green River, UT 84525,
(435) 564–3325; or Rick Kaster, 4860 N.
115 East, Buhl, ID 83316, (208) 731–
9975.
i. FERC Contact: B. Peter Yarrington,
(202) 502–6129 or peter.yarrington@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 15
days from the issuance date of this
notice by the Commission. The
Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, or comments using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Please include the project number (P–
6643–015) on any comments, motions to
intervene, or protests filed.
k. Description of Request: The
applicant proposes replacement of the
existing rock and timber diversion dam
with a new structure primarily
consisting of sheet pile walls, structural
fill material, and a concrete cap. The
existing diversion dam, which is over
E:\FR\FM\28OCN1.SGM
28OCN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 208 / Wednesday, October 28, 2015 / Notices
100 years old, has undergone significant
deterioration, most recently during a
high-flow event in 2011. The proposed
new diversion dam was designed by the
Green River Conservation District and
the exemptee in consultation with
federal and state resource agencies to
ensure a continued supply of
agricultural water for local irrigators,
and to improve public safety and fish
passage. The work would not result in
any significant changes to water levels
or project operation.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1 (866) 208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
VerDate Sep<11>2014
19:16 Oct 27, 2015
Jkt 238001
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the amendment
application. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: October 21, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–27405 Filed 10–27–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14703–000]
Empire State Hydro 302, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On August 25, 2015, Empire State
Hydro 302, LLC, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Braendly Dam Hydroelectric
Project to be located on Fishkill River in
Dutchess County, New York. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would
redevelop an abandoned project and
consist of: (1) An existing 130-foot-long,
PO 00000
Frm 00011
Fmt 4703
Sfmt 9990
65993
18-foot-high cut stone with a concrete
cap dam creating a reservoir with a
surface area of approximately 3 acres
and a storage capacity of 15 acre-feet at
a normal water surface elevation of
119.5 feet mean sea level; (2) a new 6foot-diameter, 300-foot-long steel
penstock; (3) a new 50-foot-long by 35foot-wide powerhouse containing two
Kaplan turbine units with a rated
capacity of 450 kilowatts each; and (4)
a new 12.7-kilovolt, 500-foot-long
transmission line. The project would
have an annual generation of 3,200
megawatt-hours.
Applicant Contact: Mark
Boumansour, Empire State Hydro 302,
LLC, 1401 Walnut Street, Suite 220,
Boulder, CO 80302; phone: 303–440–
3378.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14703–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14703) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: October 22, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–27407 Filed 10–27–15; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\28OCN1.SGM
28OCN1
Agencies
[Federal Register Volume 80, Number 208 (Wednesday, October 28, 2015)]
[Notices]
[Pages 65992-65993]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-27405]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6643-015]
Lee R. and A. Leon Thayn; Notice of Application Accepted for
Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment of Exemption.
b. Project No: 6643-015.
c. Date Filed: October 19, 2015.
d. Applicant: Lee R. and A. Leon Thayn.
e. Name of Projects: Thayn Project.
f. Location: The project is located on the Green River, along the
boundary of Grand and Emory Counties, Utah.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Lee R. Thayn, P.O. Box 447, Green River, UT
84525, (435) 564-3325; or Rick Kaster, 4860 N. 115 East, Buhl, ID
83316, (208) 731-9975.
i. FERC Contact: B. Peter Yarrington, (202) 502-6129 or
peter.yarrington@ferc.gov.
j. Deadline for filing comments, motions to intervene, and protests
is 15 days from the issuance date of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file motions
to intervene, protests, or comments using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. Please include the project number (P-
6643-015) on any comments, motions to intervene, or protests filed.
k. Description of Request: The applicant proposes replacement of
the existing rock and timber diversion dam with a new structure
primarily consisting of sheet pile walls, structural fill material, and
a concrete cap. The existing diversion dam, which is over
[[Page 65993]]
100 years old, has undergone significant deterioration, most recently
during a high-flow event in 2011. The proposed new diversion dam was
designed by the Green River Conservation District and the exemptee in
consultation with federal and state resource agencies to ensure a
continued supply of agricultural water for local irrigators, and to
improve public safety and fish passage. The work would not result in
any significant changes to water levels or project operation.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1 (866) 208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the amendment application.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: October 21, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-27405 Filed 10-27-15; 8:45 am]