Combined Notice of Filings #1, 65731-65732 [2015-27182]

Download as PDF tkelley on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 80, No. 207 / Tuesday, October 27, 2015 / Notices inch replacement pipe and utilization of a 0.52 mile section of existing 10-inch pipe, south of Gandy Blvd. in Pinellas County Florida, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The project known as the 12-Inch St. Petersburg Lateral Relocation Project is being done due to a Florida Department of Transportation road project. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this Application should be directed to Stephen Veatch, Senior Director of Certificates & Tariffs, Florida Gas Transmission Company, LLC, 1300 Main St., Houston, TX 77002, at phone (713) 989–2024 or facsimile (713) 989– 1205, or via email to stephen.veatch@ energytransfer.com. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and VerDate Sep<11>2014 19:58 Oct 26, 2015 Jkt 238001 state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with he Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a) (1) (iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: October 19, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–27180 Filed 10–26–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC16–17–000. Applicants: Prairie Breeze Wind Energy II LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act and Request for Waivers and Expedited Action of Prairie Breeze Wind Energy II LLC. Filed Date: 10/19/15. Accession Number: 20151019–5386. Comments Due: 5 p.m. ET 11/9/15. PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 65731 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2331–042; ER14–630–019; ER10–2319–034; ER10– 2317–034; ER13–1351–016; ER10–2330– 041. Applicants: J.P. Morgan Ventures Energy Corporation, AlphaGen Power LLC, BE Alabama LLC, BE CA LLC, Florida Power Development LLC, Utility Contract Funding, L.L.C. Description: Updated Notice of NonMaterial Change in Status of JPMorgan Sellers. Filed Date: 10/20/15. Accession Number: 20151020–5188. Comments Due: 5 p.m. ET 11/10/15. Docket Numbers: ER11–47–006; ER14–594–006; ER14–2477–003; ER14– 2476–003; ER14–2475–003; ER13–1896– 009; ER12–2343–004; ER12–1544–004; ER12–1542–004; ER12–1541–004; ER12–1540–004; ER11–46–009; ER11– 41–006; ER10–2981–006; ER10–2975– 009. Applicants: Appalachian Power Company, Indiana Michigan Power Company, Kentucky Power Company, Kingsport Power Company, Wheeling Power Company, AEP Texas Central Company, AEP Texas North Company, Public Service Company of Oklahoma, Southwestern Electric Power Company, Ohio Power Company, AEP Energy Partners, Inc. CSW Energy Services, Inc., AEP Retail Energy Partners LLC, AEP Energy, Inc., AEP Generation Resources Inc. Description: Supplement to June 26, 2015 Updated Market Power Analysis in the Southwest Power Pool balancing area authority of the AEP MBR affiliates. Filed Date: 10/19/15. Accession Number: 20151019–5403. Comments Due: 5 p.m. ET 11/9/15. Docket Numbers: ER12–2065–002; ER14–2472–002; ER15–1721–001. Applicants: Aequitas Energy, Inc., Agera Energy LLC, energy.me midwest llc. Description: Notice of Non-Material Change in Status of Aequitas Energy, Inc., et al. Filed Date: 10/19/15. Accession Number: 20151019–5388. Comments Due: 5 p.m. ET 11/9/15. Docket Numbers: ER14–2274–001. Applicants: Aesir Power, LLC. Description: Notice of Change in Status of Aesir Power, LLC. Filed Date: 10/19/15. Accession Number: 20151019–5393. Comments Due: 5 p.m. ET 11/9/15. Docket Numbers: ER15–1061–001. Applicants: New York Independent System Operator, Inc. Description: Compliance filing: NYISO compliance notify effective date E:\FR\FM\27OCN1.SGM 27OCN1 tkelley on DSK3SPTVN1PROD with NOTICES 65732 Federal Register / Vol. 80, No. 207 / Tuesday, October 27, 2015 / Notices and errata correction to shortage pricing to be effective 11/4/2015. Filed Date: 10/20/15. Accession Number: 20151020–5209. Comments Due: 5 p.m. ET 11/10/15. Docket Numbers: ER15–2631–003. Applicants: Odell Wind Farm, LLC. Description: Tariff Amendment: Revised Application to be effective 11/ 9/2015. Filed Date: 10/19/15. Accession Number: 20151019–5350. Comments Due: 5 p.m. ET 11/9/15. Docket Numbers: ER15–2742–000. Applicants: Panda Patriot LLC. Description: Supplement to September 29, 2015 Panda Patriot LLC tariff filing. Filed Date: 10/19/15. Accession Number: 20151019–5397. Comments Due: 5 p.m. ET 11/9/15. Docket Numbers: ER16–120–000. Applicants: New York Independent System Operator, Inc. Description: Compliance filing: Compliance filing—Reliability Must Run to be effective 10/20/2015. Filed Date: 10/19/15. Accession Number: 20151019–5349. Comments Due: 5 p.m. ET 11/9/15. Docket Numbers: ER16–121–000. Applicants: PJM Interconnection, L.L.C. Description: Section 205(d) Rate Filing: Revisions to OATT Att K-Appx— FTR/ARR Revisions to be effective 12/ 31/9998. Filed Date: 10/19/15. Accession Number: 20151019–5355. Comments Due: 5 p.m. ET 11/9/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 20, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–27182 Filed 10–26–15; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 19:58 Oct 26, 2015 Jkt 238001 Dated: October 20, 2015. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FR Doc. 2015–27176 Filed 10–26–15; 8:45 am] BILLING CODE 6717–01–P [Project No. 2438–121] Seneca Falls Power Corporation; C–S Canal Hydro, LLC; Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests On October 13, 2015, Seneca Falls Power Corporation (transferor) and C–S Canal Hydro, LLC (transferee) filed an application for transfer of license of the Seneca Falls Hydroelectric Project No. 2438. The project is located on the Seneca River in Seneca, Yates, Schuyler, and Ontario counties, New York. The applicants seek Commission approval to transfer the license for the Seneca Falls Hydroelectric Project from the transferor to the transferee. Applicant Contact: For transferor: Mr. Scott Goodwin, President, Seneca Falls Power Corporation, 3330 Clayton Road, Suite B, Concord, CA 94519, telephone 925–692–2798. For transferee: Mr. Mark Boumansour, COO, C–S Canal Hydro, LLC, c/o Gravity Renewables, Inc., 1401 Walnut Street, Suite 220, Boulder, CO 80302, telephone: 303–440–3378 and Mr. Karl F. Kumli, III, Dietze and Davis, P.C., 2060 Broadway, Suite 400, Boulder, CO 80302, telephone: 303– 447–1375. FERC Contact: Patricia W. Gillis, (202) 502–8735. Deadline for filing comments, motions to intervene, and protests: 30 days from the date that the Commission issues this notice. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–2438–121. PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL16–6–000] PJM Interconnection, L.L.C.; Notice of Filing Take notice that on October 19, 2015, PJM Interconnection, L.L.C. filed Revisions to Operating Agreement, Schedule 1 RE FTR/ARR Revisions to be effective 1/1/2016. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on November 9, 2015. E:\FR\FM\27OCN1.SGM 27OCN1

Agencies

[Federal Register Volume 80, Number 207 (Tuesday, October 27, 2015)]
[Notices]
[Pages 65731-65732]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-27182]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC16-17-000.
    Applicants: Prairie Breeze Wind Energy II LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act and Request for Waivers and Expedited Action of 
Prairie Breeze Wind Energy II LLC.
    Filed Date: 10/19/15.
    Accession Number: 20151019-5386.
    Comments Due: 5 p.m. ET 11/9/15.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2331-042; ER14-630-019; ER10-2319-034; ER10-
2317-034; ER13-1351-016; ER10-2330-041.
    Applicants: J.P. Morgan Ventures Energy Corporation, AlphaGen Power 
LLC, BE Alabama LLC, BE CA LLC, Florida Power Development LLC, Utility 
Contract Funding, L.L.C.
    Description: Updated Notice of Non-Material Change in Status of 
JPMorgan Sellers.
    Filed Date: 10/20/15.
    Accession Number: 20151020-5188.
    Comments Due: 5 p.m. ET 11/10/15.

    Docket Numbers: ER11-47-006; ER14-594-006; ER14-2477-003; ER14-
2476-003; ER14-2475-003; ER13-1896-009; ER12-2343-004; ER12-1544-004; 
ER12-1542-004; ER12-1541-004; ER12-1540-004; ER11-46-009; ER11-41-006; 
ER10-2981-006; ER10-2975-009.
    Applicants: Appalachian Power Company, Indiana Michigan Power 
Company, Kentucky Power Company, Kingsport Power Company, Wheeling 
Power Company, AEP Texas Central Company, AEP Texas North Company, 
Public Service Company of Oklahoma, Southwestern Electric Power 
Company, Ohio Power Company, AEP Energy Partners, Inc. CSW Energy 
Services, Inc., AEP Retail Energy Partners LLC, AEP Energy, Inc., AEP 
Generation Resources Inc.
    Description: Supplement to June 26, 2015 Updated Market Power 
Analysis in the Southwest Power Pool balancing area authority of the 
AEP MBR affiliates.
    Filed Date: 10/19/15.
    Accession Number: 20151019-5403.
    Comments Due: 5 p.m. ET 11/9/15.

    Docket Numbers: ER12-2065-002; ER14-2472-002; ER15-1721-001.
    Applicants: Aequitas Energy, Inc., Agera Energy LLC, energy.me 
midwest llc.
    Description: Notice of Non-Material Change in Status of Aequitas 
Energy, Inc., et al.
    Filed Date: 10/19/15.
    Accession Number: 20151019-5388.
    Comments Due: 5 p.m. ET 11/9/15.

    Docket Numbers: ER14-2274-001.
    Applicants: Aesir Power, LLC.
    Description: Notice of Change in Status of Aesir Power, LLC.
    Filed Date: 10/19/15.
    Accession Number: 20151019-5393.
    Comments Due: 5 p.m. ET 11/9/15.

    Docket Numbers: ER15-1061-001.
    Applicants: New York Independent System Operator, Inc.
    Description: Compliance filing: NYISO compliance notify effective 
date

[[Page 65732]]

and errata correction to shortage pricing to be effective 11/4/2015.
    Filed Date: 10/20/15.
    Accession Number: 20151020-5209.
    Comments Due: 5 p.m. ET 11/10/15.

    Docket Numbers: ER15-2631-003.
    Applicants: Odell Wind Farm, LLC.
    Description: Tariff Amendment: Revised Application to be effective 
11/9/2015.
    Filed Date: 10/19/15.
    Accession Number: 20151019-5350.
    Comments Due: 5 p.m. ET 11/9/15.

    Docket Numbers: ER15-2742-000.
    Applicants: Panda Patriot LLC.
    Description: Supplement to September 29, 2015 Panda Patriot LLC 
tariff filing.
    Filed Date: 10/19/15.
    Accession Number: 20151019-5397.
    Comments Due: 5 p.m. ET 11/9/15.

    Docket Numbers: ER16-120-000.
    Applicants: New York Independent System Operator, Inc.
    Description: Compliance filing: Compliance filing--Reliability Must 
Run to be effective 10/20/2015.
    Filed Date: 10/19/15.
    Accession Number: 20151019-5349.
    Comments Due: 5 p.m. ET 11/9/15.

    Docket Numbers: ER16-121-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Section 205(d) Rate Filing: Revisions to OATT Att K-
Appx--FTR/ARR Revisions to be effective 12/31/9998.
    Filed Date: 10/19/15.
    Accession Number: 20151019-5355.
    Comments Due: 5 p.m. ET 11/9/15.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: October 20, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-27182 Filed 10-26-15; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.