Combined Notice of Filings #2 (October 9, 2015), 63993 [2015-26798]
Download as PDF
Federal Register / Vol. 80, No. 204 / Thursday, October 22, 2015 / Notices
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
tkelley on DSK3SPTVN1PROD with NOTICES
Combined Notice of Filings #2
(October 9, 2015)
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–309–007.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2015–
10–09_Compliance Net Zero
Attachment X Filing to be effective 1/1/
2012.
Filed Date: 10/9/15.
Accession Number: 20151009–5237.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ER16–45–000.
Applicants: NorthWestern
Corporation.
Description: Initial rate filing: SA
759—Agreement with Tessenderlo
Kerley Services re Jupiter Sulphur
Project to be effective 10/10/2015.
Filed Date: 10/9/15.
Accession Number: 20151009–5231
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ER16–46–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Section 205(d) Rate
Filing: First Revised Interconnection
Service Agreement No. 3837, Queue No.
X4–048 to be effective 9/14/2015.
Filed Date: 10/9/15.
Accession Number: 20151009–5260.
Comments Due: 5 p.m. ET 10/30/15.
Take notice that the Commission
received the following land acquisition
reports:
Docket Numbers: LA15–3–000.
Applicants: MidAmerican Energy
Company.
Description: Quarterly Land
Acquisition Report of MidAmerican
Energy Company, et al.
Filed Date: 10/9/15.
Accession Number: 20151009–5111.
Comments Due: 5 p.m. ET 10/30/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
VerDate Sep<11>2014
18:05 Oct 21, 2015
Jkt 238001
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–26798 Filed 10–21–15; 8:45 am]
BILLING CODE P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OGC–2015–0678; FRL 9936–07–
OGC]
Proposed Settlement Agreement
Environmental Protection
Agency (EPA).
ACTION: Notice of proposed settlement
agreement; request for public comment.
AGENCY:
In accordance with section
113(g) of the Clean Air Act (the ‘‘Act’’),
42 U.S.C. 7413(g), notice is hereby given
of a proposed settlement agreement to
resolve two cases filed by the WildEarth
Guardians (‘‘Guardians’’) and Sierra
Club involving EPA actions under the
CAA Title V operating permit program.
On January 7, 2015, Guardians and
Sierra Club filed petitions with the
Environmental Appeal Board (‘‘EAB’’)
challenging a Part 71 Operating Permit
issued by EPA Region 8 on December 5,
2014, to Deseret Power Cooperative
(‘‘Deseret’’) to operate the Bonanza
Power Plant (‘‘Bonanza Plant’’) (In re
Deseret Power Cooperative Bonanza
Power Plant, CAA Appeal Nos. 15–1,
15–2). Under the proposed settlement
agreement, Deseret would submit an
application for a minor New Source
Review (NSR) permit to implement the
specific terms of the agreement; and
EPA would draft and provide for public
notice of the proposed permit.
DATES: Written comments on the
proposed settlement agreement must be
received by November 23, 2015.
ADDRESSES: Submit your comments,
identified by Docket ID number EPA–
HQ–OGC–2015–0678 online at
www.regulations.gov (EPA’s preferred
method); by email to oei.docket@
epa.gov; by mail to EPA Docket Center,
Environmental Protection Agency,
Mailcode: 2822T, 1200 Pennsylvania
Ave. NW., Washington, DC 20460–0001;
or by hand delivery or courier to EPA
Docket Center, EPA West, Room 3334,
1301 Constitution Ave. NW.,
Washington, DC, between 8:30 a.m. and
4:30 p.m. Monday through Friday,
excluding legal holidays. Comments on
SUMMARY:
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
63993
a disk or CD–ROM should be formatted
in Word or ASCII file, avoiding the use
of special characters and any form of
encryption, and may be mailed to the
mailing address above.
FOR FURTHER INFORMATION CONTACT: Sara
L. Laumann, Office of Regional Counsel,
EPA Region 8, 1595 Wynkoop Street,
Denver CO 80202–2466; telephone:
(303) 312–6443; fax number: (303) 312–
6859; email address: laumann.sara@
epa.gov.
SUPPLEMENTARY INFORMATION:
I. Additional Information About the
Proposed Settlement Agreement
The proposed settlement agreement
would resolve two cases filed by the
WildEarth Guardians (‘‘Guardians’’) and
Sierra Club involving EPA actions under
the CAA Title V operating permit
program. On January 7, 2015, Guardians
and Sierra Club filed petitions with the
Environmental Appeal Board (‘‘EAB’’)
challenging a Part 71 Operating Permit
issued by EPA Region 8 on December 5,
2014, to Deseret Power Cooperative
(‘‘Deseret’’) to operate the Bonanza
Power Plant (‘‘Bonanza Plant’’), a 500megawatt coal-fired power plant located
within the exterior boundaries of the
Uintah and Ouray Indian Reservation in
Utah. Under the proposed settlement
agreement, Deseret would submit an
application for a minor New Source
Review (NSR) permit which would
provide for installation of low NOX
burners with over-fire air controls, along
with other operator-requested permit
terms and conditions. The agreement
also provides that if EPA Region 8
issues a final permit with provisions
that are consistent with the settlement
agreement: (1) Petitioners would file
motions to dismiss the EAB appeals; (2)
EPA would withdraw a proposed
Prevention of Significant Deterioration
Permit for the facility; (3) Deseret would
withdraw an outstanding permit
application; and (4) Deseret and Sierra
Club would withdraw their respective
and related FOIA requests. Under the
agreement EPA would also state its plan
to withdraw a proposed Prevention of
Significant Deterioration Permit for the
Plant. The proposed settlement
agreement also provides that nothing in
the agreement shall be construed to
limit or modify any discretion afforded
EPA by the Act or by general principles
of administrative law in taking those
actions. See the proposed settlement
agreement for specific details.
For a period of thirty (30) days
following the date of publication of this
notice, the Agency will accept written
comments relating to the proposed
settlement agreement from persons who
E:\FR\FM\22OCN1.SGM
22OCN1
Agencies
[Federal Register Volume 80, Number 204 (Thursday, October 22, 2015)]
[Notices]
[Page 63993]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-26798]
[[Page 63993]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2 (October 9, 2015)
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER12-309-007.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Compliance filing: 2015-10-09_Compliance Net Zero
Attachment X Filing to be effective 1/1/2012.
Filed Date: 10/9/15.
Accession Number: 20151009-5237.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ER16-45-000.
Applicants: NorthWestern Corporation.
Description: Initial rate filing: SA 759--Agreement with
Tessenderlo Kerley Services re Jupiter Sulphur Project to be effective
10/10/2015.
Filed Date: 10/9/15.
Accession Number: 20151009-5231
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ER16-46-000.
Applicants: PJM Interconnection, L.L.C.
Description: Section 205(d) Rate Filing: First Revised
Interconnection Service Agreement No. 3837, Queue No. X4-048 to be
effective 9/14/2015.
Filed Date: 10/9/15.
Accession Number: 20151009-5260.
Comments Due: 5 p.m. ET 10/30/15.
Take notice that the Commission received the following land
acquisition reports:
Docket Numbers: LA15-3-000.
Applicants: MidAmerican Energy Company.
Description: Quarterly Land Acquisition Report of MidAmerican
Energy Company, et al.
Filed Date: 10/9/15.
Accession Number: 20151009-5111.
Comments Due: 5 p.m. ET 10/30/15.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-26798 Filed 10-21-15; 8:45 am]
BILLING CODE P