Empire State Hydro 301, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 63761 [2015-26729]
Download as PDF
63761
Federal Register / Vol. 80, No. 203 / Wednesday, October 21, 2015 / Notices
FERC–914: COGENERATION AND SMALL POWER PRODUCTION—TARIFF FILINGS—Continued
Number of
respondents
Annual
number of
responses per
respondent
Total number
of
responses
Average
burden & cost
per response 4
Total annual
burden hours
& total
annual cost
Cost per
Respondent
($)
(1)
(2)
(1)*(2)=(3)
(4)
(3)*(4)=(5)
(5)÷(1)
Electric Quarterly Reports (later) .............
35
4
140
Change of Status .....................................
10
1
TOTAL ..............................................
........................
185
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: October 15, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–26727 Filed 10–20–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14701–000]
tkelley on DSK3SPTVN1PROD with NOTICES
Empire State Hydro 301, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On August 20, 2015, Empire State
Hydro 301, LLC filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Diamond Mills Hydroelectric
Project (Diamond Mills Project or
project) to be located at the existing
Diamond Mills Dam on Esopus Creek in
Saugerties, Ulster County, New York.
The sole purpose of a preliminary
4 The estimates for cost per response are derived
using the following formula: Average Burden Hours
per Response * $72.00 per Hour = Average Cost per
Response. The hourly cost figure comes from the
FERC average salary of $149,489/year.
VerDate Sep<11>2014
22:39 Oct 20, 2015
Jkt 238001
840
$60,480
30
$2,160
$1,728
10
6
$432
3
$216
........................
7,725
$523,800
$15,120
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) An 140-acre
impoundment with a normal volume of
826 acre-feet; (2) an existing 350-footlong, 32-foot-high concrete gravity dam
with a spillway length of 340 feet; (3) an
existing 30-foot-long, 9-foot-high
auxiliary spillway; (4) an existing 10foot-long, 6-foot-diameter penstock; (5)
two new 750-kilowatt turbines; (6) a
new 50-foot-long, 30-foot-wide
powerhouse; (7) a new 300-foot-long,
12.7-kilovolt transmission line; and (8)
appurtenant facilities. The estimated
annual generation of the Diamond Mills
Project would be 5,300 megawatt-hours.
Applicant Contact: Mr. Mark
Boumansour, Empire State Hydro 301,
LLC, c/o Gravity Renewables, Inc., 1401
Walnut Street, Suite 220, Boulder, CO
80302; phone: (303) 440–3378.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
$216
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14701–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14701) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: October 15, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–26729 Filed 10–20–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC16–6–000.
Applicants: Noble Altona Windpark,
LLC, Noble Bliss Windpark, LLC, Noble
Clinton Windpark I, LLC, Noble
Ellenburg Windpark, LLC, Noble
Chateaugay Windpark, LLC, Noble Great
Plains Windpark, LLC, Noble
Wethersfield Windpark, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act and Request for
Waivers, Confidential Treatment, and
Expedited Consideration of Noble
Altona Windpark, LLC, et al.
Filed Date: 10/8/15.
Accession Number: 20151008–5174.
Comments Due: 5 p.m. ET 10/29/15.
Docket Numbers: EC16–7–000.
E:\FR\FM\21OCN1.SGM
21OCN1
Agencies
[Federal Register Volume 80, Number 203 (Wednesday, October 21, 2015)]
[Notices]
[Page 63761]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-26729]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14701-000]
Empire State Hydro 301, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On August 20, 2015, Empire State Hydro 301, LLC filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Diamond Mills Hydroelectric Project (Diamond Mills Project or project)
to be located at the existing Diamond Mills Dam on Esopus Creek in
Saugerties, Ulster County, New York. The sole purpose of a preliminary
permit, if issued, is to grant the permit holder priority to file a
license application during the permit term. A preliminary permit does
not authorize the permit holder to perform any land-disturbing
activities or otherwise enter upon lands or waters owned by others
without the owners' express permission.
The proposed project would consist of the following: (1) An 140-
acre impoundment with a normal volume of 826 acre-feet; (2) an existing
350-foot-long, 32-foot-high concrete gravity dam with a spillway length
of 340 feet; (3) an existing 30-foot-long, 9-foot-high auxiliary
spillway; (4) an existing 10-foot-long, 6-foot-diameter penstock; (5)
two new 750-kilowatt turbines; (6) a new 50-foot-long, 30-foot-wide
powerhouse; (7) a new 300-foot-long, 12.7-kilovolt transmission line;
and (8) appurtenant facilities. The estimated annual generation of the
Diamond Mills Project would be 5,300 megawatt-hours.
Applicant Contact: Mr. Mark Boumansour, Empire State Hydro 301,
LLC, c/o Gravity Renewables, Inc., 1401 Walnut Street, Suite 220,
Boulder, CO 80302; phone: (303) 440-3378.
FERC Contact: Woohee Choi; phone: (202) 502-6336.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14701-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14701) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: October 15, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-26729 Filed 10-20-15; 8:45 am]