Combined Notice of Filings #1, 63758-63759 [2015-26704]
Download as PDF
63758
Federal Register / Vol. 80, No. 203 / Wednesday, October 21, 2015 / Notices
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY—Continued
Description
Satisfies
(Y/N)
FPA 30(a)(3)(C)(ii), as amended
by HREA.
FPA 30(a)(3)(C)(iii), as amended by HREA.
tkelley on DSK3SPTVN1PROD with NOTICES
Statutory provision
The facility has an installed capacity that does not exceed 5 megawatts .....................................
Y
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions To Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
1 18
CFR 385.2001–2005 (2014).
VerDate Sep<11>2014
22:39 Oct 20, 2015
Jkt 238001
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the Web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD16–1–000) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: October 15, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–26723 Filed 10–20–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC15–205–000.
Applicants: Bishop Hill Energy LLC,
California Ridge Wind Energy LLC,
Prairie Breeze Wind Energy LLC.
Description: Supplement to
September 11, 2015 Application for
Authorization under Section 203 of the
Federal Power Act of Bishop Hill Energy
LLC, et al.
Filed Date: 10/9/15.
Accession Number: 20151009–5337.
Comments Due: 5 p.m. ET 10/19/15.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–1809–001.
Applicants: ATX Southwest, LLC.
Description: Compliance filing with
Pro Forma Service Agreement of ATX
Southwest, LLC.
Filed Date: 10/9/15.
Accession Number: 20151009–5339.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ER15–2620–000.
Applicants: Little Elk Wind Project,
LLC.
Description: Baseline eTariff Filing:
Little Elk Wind Project, LLC MBR Tariff
to be effective 10/1/2015.
Filed Date: 9/4/15.
Accession Number: 20150904–5331.
Comments Due: 5 p.m. ET 10/27/15.
Docket Numbers: ER15–2620–000.
Applicants: Little Elk Wind Project,
LLC.
Description: Supplement to
September 4, 2015 Little Elk Wind
Project, LLC tariff filing.
Filed Date: 10/9/15.
Accession Number: 20151009–5331.
Comments Due: 5 p.m. ET 10/27/15.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES15–40–000.
Applicants: Jersey Central Power &
Light Company.
Description: Amendment to July 31,
2015 Application of Jersey Central
Power & Light Company for
Authorization under Section 204(a) of
the Federal Power Act to Issue ShortTerm Debt Securities.
Filed Date: 10/9/15.
Accession Number: 20151009–5295.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ES15–42–000.
Applicants: Pennsylvania Power
Company.
Description: Amendment to July 31,
2015 Application of Pennsylvania
Power Company for Authorization
under Section 204(a) of the Federal
Power Act to Issue Short-Term Debt
Securities.
Filed Date: 10/9/15.
Accession Number: 20151009–5294.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ES15–43–000.
E:\FR\FM\21OCN1.SGM
21OCN1
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 203 / Wednesday, October 21, 2015 / Notices
Applicants: Pennsylvania Electric
Company.
Description: Amendment to July 31,
2015 Application of Pennsylvania
Electric Company for Authorization
under Section 204(a) of the Federal
Power Act to Issue Short-Term Debt
Securities.
Filed Date: 10/9/15.
Accession Number: 20151009–5293.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ES15–44–000.
Applicants: Metropolitan Edison
Company.
Description: Amendment to July 31,
2015 Application of Metropolitan
Edison Company for Authorization
under Section 204(a) of the Federal
Power Act to Issue Short-Term Debt
Securities.
Filed Date: 10/9/15.
Accession Number: 20151009–5292.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ES15–45–000.
Applicants: West Penn Power
Company.
Description: Amendment to July 31,
2015 Application of West Penn Power
Company for Authorization under
Section 204(a) of the Federal Power Act
to Issue Short-Term Debt Securities.
Filed Date: 10/9/15.
Accession Number: 20151009–5290.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ES15–46–000.
Applicants: Monongahela Power
Company.
Description: Amendment to July 31,
2015 Application of Monongahela
Power Company for Authorization
under Section 204(a) of the Federal
Power Act to Issue Short-Term Debt
Securities.
Filed Date: 10/9/15.
Accession Number: 20151009–5288.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ES15–47–000.
Applicants: The Potomac Edison
Company.
Description: Amendment to July 31,
2015 Application of The Potomac
Edison Power Company for
Authorization under Section 204(a) of
the Federal Power Act to Issue ShortTerm Debt Securities.
Filed Date: 10/9/15.
Accession Number: 20151009–5287.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ES15–48–000.
Applicants: Trans-Allegheny
Interstate Line Company.
Description: Amendment to July 31,
2015 Application of Trans-Allegheny
Interstate Line Company for
Authorization under Section 204(a) of
the Federal Power Act to Issue ShortTerm Debt Securities.
Filed Date: 10/9/15.
VerDate Sep<11>2014
22:39 Oct 20, 2015
Jkt 238001
Accession Number: 20151009–5284.
Comments Due: 5 p.m. ET 10/30/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 13, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–26704 Filed 10–20–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER16–72–000]
San Gorgonio Westwinds II—
Windustries, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of San
Gorgonio Westwinds II—Windustries,
LLC’s application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
63759
assumptions of liability, is November 3,
2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: October 14, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–26716 Filed 10–20–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC15–11–000]
Commission Information Collection
Activities (FERC–914); Comment
Request
Federal Energy Regulatory
Commission, DOE.
ACTION: Comment request.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, 44 U.S.C.
3507(a)(1)(D), the Federal Energy
Regulatory Commission (Commission or
FERC) is submitting its information
collection (FERC–914, Cogeneration and
Small Power Production—Tariff Filings)
to the Office of Management and Budget
(OMB) for review of the information
SUMMARY:
E:\FR\FM\21OCN1.SGM
21OCN1
Agencies
[Federal Register Volume 80, Number 203 (Wednesday, October 21, 2015)]
[Notices]
[Pages 63758-63759]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-26704]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC15-205-000.
Applicants: Bishop Hill Energy LLC, California Ridge Wind Energy
LLC, Prairie Breeze Wind Energy LLC.
Description: Supplement to September 11, 2015 Application for
Authorization under Section 203 of the Federal Power Act of Bishop Hill
Energy LLC, et al.
Filed Date: 10/9/15.
Accession Number: 20151009-5337.
Comments Due: 5 p.m. ET 10/19/15.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER15-1809-001.
Applicants: ATX Southwest, LLC.
Description: Compliance filing with Pro Forma Service Agreement of
ATX Southwest, LLC.
Filed Date: 10/9/15.
Accession Number: 20151009-5339.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ER15-2620-000.
Applicants: Little Elk Wind Project, LLC.
Description: Baseline eTariff Filing: Little Elk Wind Project, LLC
MBR Tariff to be effective 10/1/2015.
Filed Date: 9/4/15.
Accession Number: 20150904-5331.
Comments Due: 5 p.m. ET 10/27/15.
Docket Numbers: ER15-2620-000.
Applicants: Little Elk Wind Project, LLC.
Description: Supplement to September 4, 2015 Little Elk Wind
Project, LLC tariff filing.
Filed Date: 10/9/15.
Accession Number: 20151009-5331.
Comments Due: 5 p.m. ET 10/27/15.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES15-40-000.
Applicants: Jersey Central Power & Light Company.
Description: Amendment to July 31, 2015 Application of Jersey
Central Power & Light Company for Authorization under Section 204(a) of
the Federal Power Act to Issue Short-Term Debt Securities.
Filed Date: 10/9/15.
Accession Number: 20151009-5295.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ES15-42-000.
Applicants: Pennsylvania Power Company.
Description: Amendment to July 31, 2015 Application of Pennsylvania
Power Company for Authorization under Section 204(a) of the Federal
Power Act to Issue Short-Term Debt Securities.
Filed Date: 10/9/15.
Accession Number: 20151009-5294.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ES15-43-000.
[[Page 63759]]
Applicants: Pennsylvania Electric Company.
Description: Amendment to July 31, 2015 Application of Pennsylvania
Electric Company for Authorization under Section 204(a) of the Federal
Power Act to Issue Short-Term Debt Securities.
Filed Date: 10/9/15.
Accession Number: 20151009-5293.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ES15-44-000.
Applicants: Metropolitan Edison Company.
Description: Amendment to July 31, 2015 Application of Metropolitan
Edison Company for Authorization under Section 204(a) of the Federal
Power Act to Issue Short-Term Debt Securities.
Filed Date: 10/9/15.
Accession Number: 20151009-5292.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ES15-45-000.
Applicants: West Penn Power Company.
Description: Amendment to July 31, 2015 Application of West Penn
Power Company for Authorization under Section 204(a) of the Federal
Power Act to Issue Short-Term Debt Securities.
Filed Date: 10/9/15.
Accession Number: 20151009-5290.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ES15-46-000.
Applicants: Monongahela Power Company.
Description: Amendment to July 31, 2015 Application of Monongahela
Power Company for Authorization under Section 204(a) of the Federal
Power Act to Issue Short-Term Debt Securities.
Filed Date: 10/9/15.
Accession Number: 20151009-5288.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ES15-47-000.
Applicants: The Potomac Edison Company.
Description: Amendment to July 31, 2015 Application of The Potomac
Edison Power Company for Authorization under Section 204(a) of the
Federal Power Act to Issue Short-Term Debt Securities.
Filed Date: 10/9/15.
Accession Number: 20151009-5287.
Comments Due: 5 p.m. ET 10/30/15.
Docket Numbers: ES15-48-000.
Applicants: Trans-Allegheny Interstate Line Company.
Description: Amendment to July 31, 2015 Application of Trans-
Allegheny Interstate Line Company for Authorization under Section
204(a) of the Federal Power Act to Issue Short-Term Debt Securities.
Filed Date: 10/9/15.
Accession Number: 20151009-5284.
Comments Due: 5 p.m. ET 10/30/15.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: October 13, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-26704 Filed 10-20-15; 8:45 am]
BILLING CODE 6717-01-P