Download as PDF 63761 Federal Register / Vol. 80, No. 203 / Wednesday, October 21, 2015 / Notices FERC–914: COGENERATION AND SMALL POWER PRODUCTION—TARIFF FILINGS—Continued Number of respondents Annual number of responses per respondent Total number of responses Average burden & cost per response 4 Total annual burden hours & total annual cost Cost per Respondent ($) (1) (2) (1)*(2)=(3) (4) (3)*(4)=(5) (5)÷(1) Electric Quarterly Reports (later) ............. 35 4 140 Change of Status ..................................... 10 1 TOTAL .............................................. ........................ 185 Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: October 15, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–26727 Filed 10–20–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14701–000] tkelley on DSK3SPTVN1PROD with NOTICES Empire State Hydro 301, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 20, 2015, Empire State Hydro 301, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Diamond Mills Hydroelectric Project (Diamond Mills Project or project) to be located at the existing Diamond Mills Dam on Esopus Creek in Saugerties, Ulster County, New York. The sole purpose of a preliminary 4 The estimates for cost per response are derived using the following formula: Average Burden Hours per Response * $72.00 per Hour = Average Cost per Response. The hourly cost figure comes from the FERC average salary of $149,489/year. VerDate Sep<11>2014 22:39 Oct 20, 2015 Jkt 238001 840 $60,480 30 $2,160 $1,728 10 6 $432 3 $216 ........................ 7,725 $523,800 $15,120 permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any landdisturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) An 140-acre impoundment with a normal volume of 826 acre-feet; (2) an existing 350-footlong, 32-foot-high concrete gravity dam with a spillway length of 340 feet; (3) an existing 30-foot-long, 9-foot-high auxiliary spillway; (4) an existing 10foot-long, 6-foot-diameter penstock; (5) two new 750-kilowatt turbines; (6) a new 50-foot-long, 30-foot-wide powerhouse; (7) a new 300-foot-long, 12.7-kilovolt transmission line; and (8) appurtenant facilities. The estimated annual generation of the Diamond Mills Project would be 5,300 megawatt-hours. Applicant Contact: Mr. Mark Boumansour, Empire State Hydro 301, LLC, c/o Gravity Renewables, Inc., 1401 Walnut Street, Suite 220, Boulder, CO 80302; phone: (303) 440–3378. FERC Contact: Woohee Choi; phone: (202) 502–6336. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 $216 FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14701–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14701) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: October 15, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–26729 Filed 10–20–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC16–6–000. Applicants: Noble Altona Windpark, LLC, Noble Bliss Windpark, LLC, Noble Clinton Windpark I, LLC, Noble Ellenburg Windpark, LLC, Noble Chateaugay Windpark, LLC, Noble Great Plains Windpark, LLC, Noble Wethersfield Windpark, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act and Request for Waivers, Confidential Treatment, and Expedited Consideration of Noble Altona Windpark, LLC, et al. Filed Date: 10/8/15. Accession Number: 20151008–5174. Comments Due: 5 p.m. ET 10/29/15. Docket Numbers: EC16–7–000. E:\FR\FM\21OCN1.SGM 21OCN1 tkelley on DSK3SPTVN1PROD with NOTICES 63762 Federal Register / Vol. 80, No. 203 / Wednesday, October 21, 2015 / Notices Applicants: Astoria Generating Company, L.P., Crete Energy Venture, LLC, Lincoln Generating Facility, LLC, New Covert Generating Company, LLC, Rolling Hills Generating, L.L.C. Description: Application for Authorization for Disposition of Jurisdictional Facilities and Request for Expedited Action of Astoria Generating Company, L.P., et al. Filed Date: 10/8/15. Accession Number: 20151008–5195. Comments Due: 5 p.m. ET 10/29/15. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER14–2952–005. Applicants: Midcontinent Independent System Operator, Inc. Description: Compliance filing: 2015– 10–08_SSR Cost Allocation Compliance Filing to be effective 4/3/2014. Filed Date: 10/8/15. Accession Number: 20151008–5149. Comments Due: 5 p.m. ET 10/29/15. Docket Numbers: ER15–2579–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2015–10–08_SA 2632 Amendment to Facilities Charge Template to be effective 9/1/2015. Filed Date: 10/8/15. Accession Number: 20151008–5190. Comments Due: 5 p.m. ET 10/29/15. Docket Numbers: ER15–746–002. Applicants: RC Cape May Holdings, LLC. Description: Report Filing: Reactive Refund Report to be effective 10/8/2015. Filed Date: 10/8/15. Accession Number: 20151008–5159. Comments Due: 5 p.m. ET 10/29/15. Docket Numbers: ER16–36–000. Applicants: Public Service Company of Colorado. Description: Section 205(d) Rate Filing: 2015–10–8_PSC–WAPA-Con Fac Agrmt-359–0.0.0-Filing to be effective 2/ 24/2014. Filed Date: 10/8/15. Accession Number: 20151008–5116. Comments Due: 5 p.m. ET 10/29/15. Docket Numbers: ER16–37–000. Applicants: Southwest Power Pool, Inc. Description: Section 205(d) Rate Filing: Attachment AE Revisions Regarding MWP Formulas for Reg-Up and Reg-Down Mileage to be effective 10/9/2015. Filed Date: 10/8/15. Accession Number: 20151008–5173. Comments Due: 5 p.m. ET 10/29/15. Docket Numbers: ER16–38–000. Applicants: Kingbird Solar A, LLC. Description: Baseline eTariff Filing: Shared Facilities and Common VerDate Sep<11>2014 22:39 Oct 20, 2015 Jkt 238001 Ownership Agreements and Request for Waivers to be effective 10/9/2015. Filed Date: 10/8/15. Accession Number: 20151008–5206. Comments Due: 5 p.m. ET 10/29/15. Docket Numbers: ER16–39–000. Applicants: Kingbird Solar B, LLC. Description: Baseline eTariff Filing: Shared Facilities and Common Ownership Agreements and Request for Waivers to be effective 10/9/2015. Filed Date: 10/8/15. Accession Number: 20151008–5207. Comments Due: 5 p.m. ET 10/29/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 8, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. Filed Date: 10/7/15. Accession Number: 20151007–5056. Comments Due: 5 p.m. ET 10/19/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 7, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–26708 Filed 10–20–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER16–61–000] [FR Doc. 2015–26703 Filed 10–20–15; 8:45 am] BILLING CODE 6717–01–P Seville Solar One LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization DEPARTMENT OF ENERGY October 14, 2015. Federal Energy Regulatory Commission This is a supplemental notice in the above-referenced proceeding of Seville Solar One LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP16–32–000. Applicants: Trunkline Gas Company, LLC. Description: Compliance filing Annual Report of Flow Through filed 10–6–15. Filed Date: 10/6/15. Accession Number: 20151006–5158. Comments Due: 5 p.m. ET 10/19/15. Docket Numbers: RP16–33–000. Applicants: Gulfstream Natural Gas System, L.L.C. Description: Section 4(d) Rate Filing: 1Line Agreement Filing to be effective 10/30/2015. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\21OCN1.SGM 21OCN1

Agencies

[Federal Register Volume 80, Number 203 (Wednesday, October 21, 2015)]
[Notices]
[Pages 63761-63762]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-26703]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC16-6-000.
    Applicants: Noble Altona Windpark, LLC, Noble Bliss Windpark, LLC, 
Noble Clinton Windpark I, LLC, Noble Ellenburg Windpark, LLC, Noble 
Chateaugay Windpark, LLC, Noble Great Plains Windpark, LLC, Noble 
Wethersfield Windpark, LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act and Request for Waivers, Confidential Treatment, and 
Expedited Consideration of Noble Altona Windpark, LLC, et al.
    Filed Date: 10/8/15.
    Accession Number: 20151008-5174.
    Comments Due: 5 p.m. ET 10/29/15.

    Docket Numbers: EC16-7-000.

[[Page 63762]]

    Applicants: Astoria Generating Company, L.P., Crete Energy Venture, 
LLC, Lincoln Generating Facility, LLC, New Covert Generating Company, 
LLC, Rolling Hills Generating, L.L.C.
    Description: Application for Authorization for Disposition of 
Jurisdictional Facilities and Request for Expedited Action of Astoria 
Generating Company, L.P., et al.
    Filed Date: 10/8/15.
    Accession Number: 20151008-5195.
    Comments Due: 5 p.m. ET 10/29/15.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER14-2952-005.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Compliance filing: 2015-10-08_SSR Cost Allocation 
Compliance Filing to be effective 4/3/2014.
    Filed Date: 10/8/15.
    Accession Number: 20151008-5149.
    Comments Due: 5 p.m. ET 10/29/15.

    Docket Numbers: ER15-2579-001.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Tariff Amendment: 2015-10-08_SA 2632 Amendment to 
Facilities Charge Template to be effective 9/1/2015.
    Filed Date: 10/8/15.
    Accession Number: 20151008-5190.
    Comments Due: 5 p.m. ET 10/29/15.

    Docket Numbers: ER15-746-002.
    Applicants: RC Cape May Holdings, LLC.
    Description: Report Filing: Reactive Refund Report to be effective 
10/8/2015.
    Filed Date: 10/8/15.
    Accession Number: 20151008-5159.
    Comments Due: 5 p.m. ET 10/29/15.

    Docket Numbers: ER16-36-000.
    Applicants: Public Service Company of Colorado.
    Description: Section 205(d) Rate Filing: 2015-10-8_PSC-WAPA-Con Fac 
Agrmt-359-0.0.0-Filing to be effective 2/24/2014.
    Filed Date: 10/8/15.
    Accession Number: 20151008-5116.
    Comments Due: 5 p.m. ET 10/29/15.

    Docket Numbers: ER16-37-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Section 205(d) Rate Filing: Attachment AE Revisions 
Regarding MWP Formulas for Reg-Up and Reg-Down Mileage to be effective 
10/9/2015.
    Filed Date: 10/8/15.
    Accession Number: 20151008-5173.
    Comments Due: 5 p.m. ET 10/29/15.

    Docket Numbers: ER16-38-000.
    Applicants: Kingbird Solar A, LLC.
    Description: Baseline eTariff Filing: Shared Facilities and Common 
Ownership Agreements and Request for Waivers to be effective 10/9/2015.
    Filed Date: 10/8/15.
    Accession Number: 20151008-5206.
    Comments Due: 5 p.m. ET 10/29/15.

    Docket Numbers: ER16-39-000.
    Applicants: Kingbird Solar B, LLC.
    Description: Baseline eTariff Filing: Shared Facilities and Common 
Ownership Agreements and Request for Waivers to be effective 10/9/2015.
    Filed Date: 10/8/15.
    Accession Number: 20151008-5207.
    Comments Due: 5 p.m. ET 10/29/15.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: October 8, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-26703 Filed 10-20-15; 8:45 am]
BILLING CODE 6717-01-P