Commission Information Collection Activities (FERC-725K); Comment Request; Extension, 61812-61813 [2015-26082]

Download as PDF 61812 Federal Register / Vol. 80, No. 198 / Wednesday, October 14, 2015 / Notices provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on October 28, 2015. Dated: October 7, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–26077 Filed 10–13–15; 8:45 am] tkelley on DSK3SPTVN1PROD with NOTICES BILLING CODE 6717–01–P VerDate Sep<11>2014 16:39 Oct 13, 2015 Jkt 238001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC16–1–000] Commission Information Collection Activities (FERC–725K); Comment Request; Extension Federal Energy Regulatory Commission, Energy. ACTION: Notice of information collection and request for comments. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC–725K (Mandatory Reliability Standards for the SERC Region). DATES: Comments on the collection of information are due [insert date that is 60 days after publication in the Federal Register]. ADDRESSES: You may submit comments (identified by Docket No. IC16–1–000) by either of the following methods: • eFiling at Commission’s Web site: https://www.ferc.gov/docs-filing/ efiling.asp. • Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov/help/submissionguide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208–3676 (toll-free), or (202) 502–8659 for TTY. Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov/docsfiling/docs-filing.asp. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502–8663, and fax at (202) 273– 0873. SUPPLEMENTARY INFORMATION: Title: Mandatory Reliability Standards for the SERC Region. OMB Control No.: 1902–0260. Type of Request: Three-year extension of the FERC–725K information collection requirements with no changes to the current reporting requirements. Abstract: Section 215 of the Federal Power Act (FPA) requires a SUMMARY: PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 Commission-certified Electric Reliability Organization (ERO) to develop mandatory and enforceable Reliability Standards, which are subject to Commission review and approval. Once approved, the Reliability Standards may be enforced by NERC, subject to Commission oversight, or by the Commission independently. Reliability Standards that NERC proposes to the Commission may include Reliability Standards that are proposed by a Regional Entity to be effective in that region. In Order No. 672, the Commission noted that: As a general matter, we will accept the following two types of regional differences, provided they are otherwise just, reasonable, not unduly discriminatory or preferential and in the public interest, as required under the statute: (1) a regional difference that is more stringent than the continent-wide Reliability Standard, including a regional difference that addresses matters that the continent-wide Reliability Standard does not; and (2) a regional Reliability Standard that is necessitated by a physical difference in the Bulk-Power System. When NERC reviews a regional Reliability Standard that would be applicable on an interconnection-wide basis and that has been proposed by a Regional Entity organized on an interconnection-wide basis, NERC must rebuttably presume that the regional Reliability Standard is just, reasonable, not unduly discriminatory or preferential, and in the public interest. In turn, the Commission must give ‘‘due weight’’ to the technical expertise of NERC and of a Regional Entity organized on an interconnection-wide basis. On April 19, 2007, the Commission accepted delegation agreements between NERC and each of the eight Regional Entities. In the order, the Commission accepted SERC as a Regional Entity organized on less than an interconnection-wide basis. As a Regional Entity, SERC oversees BulkPower System reliability within the SERC Region, which covers a geographic area of approximately 560,000 square miles in a sixteen-state area in the southeastern and central United States (all of Missouri, Alabama, Tennessee, North Carolina, South Carolina, Georgia, Mississippi, and portions of Iowa, Illinois, Kentucky, Virginia, Oklahoma, Arkansas, Louisiana, Texas and Florida). The SERC Region is currently geographically divided into five subregions that are identified as Southeastern, Central, VACAR, Delta, and Gateway. Type of Respondents: Entities registered with the North American E:\FR\FM\14OCN1.SGM 14OCN1 Federal Register / Vol. 80, No. 198 / Wednesday, October 14, 2015 / Notices Electric Reliability Corporation (within the SERC region). Estimate of Annual Burden 1: The Commission estimates the annual public 61813 reporting burden for the information collection as: FERC–725K: MANDATORY RELIABILITY STANDARD FOR THE SERC REGION Number of respondents (1) PCs: Design and Document Automatic UFLS Program ................. Annual number of responses per respondent (2) 3 21 Total number of responses (1)*(2)=(3) 1 Average burden and cost per response 2 (4) 21 Total annual burden hours and total annual cost (3)*(4)=(5) Cost per respondent ($) (5)÷(1) 168 $532 8 $532 4 $11,172 PCs: Provide Documentation and Data to SERC ... 3 21 1 21 16 $1,064 336 $22,344 $1,064 GOs: Provide Documentation and Data to SERC ... 5 104 1 104 16 $1,064 1,664 $1,064 6 $110,656 GOs: Record Retention ............... Total .............. 5 104 .............................. 1 .............................. Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: October 7, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–26082 Filed 10–13–15; 8:45 am] tkelley on DSK3SPTVN1PROD with NOTICES BILLING CODE 6717–01–P 1 The Commission defines burden as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, reference 5 Code of Federal Regulations 1320.3. 2 The $66.45 hourly cost figure (including benefits) comes from the cost of an engineer as posted on the Bureau of Labor Statistics (BLS) Web VerDate Sep<11>2014 16:39 Oct 13, 2015 Jkt 238001 104 4 $150 125 .............................. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14710–000] Energy Resources USA Inc.; Notice of Preliminary Permit Application Accepted For Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 2, 2015, the Energy Resources USA Inc. filed an application for a preliminary permit under section 4(f) of the Federal Power Act proposing to study the feasibility of the proposed Lock and Dam No.22 Hydroelectric Project No. 14710–000, to be located at the existing Mississippi River Lock and Dam No. 22 on the Mississippi River, near the City of Hannibal, in Ralls County, Missouri and Pike County, Illinois. The Mississippi River Lock and Dam No. 22 is owned by the United States government and operated by the U.S. Army Corps of Engineers. The proposed project would consist of: (1) A new 770-foot-long by 300-footwide earthen intake area; (2) a new 220foot by 90-foot reinforced concrete site: https://www.bls.gov/oes/current/naics2_ 22.htm#11-0000 (wage category 17–2071). 3 Both figures for PC respondents are not to be totaled. They represent the same set of respondents. 4 The $66.45 hourly cost figure (including benefits) comes from the cost of an engineer as posted on the Bureau of Labor Statistics (BLS) Web site: https://www.bls.gov/oes/current/naics2_ 22.htm#11-0000 (wage category 17–2071). 5 Both figures for GO respondents are not to be totaled. They represent the same set of respondents. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 416 $150 7 $15,600 2,584 $159,772 $2,810 powerhouse containing four 2-megawatt Kaplan hydropower turbine-generators having a total combined generating capacity of 8.0 megawatts; (3) one new 1000-foot-long by 220-foot-wide tailrace; (4) a new 85-foot-long by 43-foot-high by 3-foot-thick intake retaining wall and a new 40-foot-long by 43-foot-high by 3foot-thick tailrace retaining wall; (5) a new 60-foot-long by 50-foot-wide substation; (6) a new 6.54-mile-long, 115-kilovolt transmission line; and (7) appurtenant facilities. The project would have an estimated annual generation of 66.4 gigawatt-hours. Applicant Contact: Mr. Ander Gonzalez, 2655 Le Jeune Road, Suite 804, Coral Gables, Florida 33134; telephone +34 932523840. FERC Contact: Tyrone A. Williams, (202) 502–6331. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices 6 The hourly cost for GOs uses the hourly reporting cost of $66.45 per hour is based on the cost (including benefits) of an engineer to implement the requirements of the rule. 7 The record retention cost of $37.50 per hour (including benefits) comes from Commission staff research on record retention requirements (wage category 43–4199 for information and record clerks). E:\FR\FM\14OCN1.SGM 14OCN1

Agencies

[Federal Register Volume 80, Number 198 (Wednesday, October 14, 2015)]
[Notices]
[Pages 61812-61813]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-26082]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC16-1-000]


Commission Information Collection Activities (FERC-725K); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission, Energy.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory 
Commission (Commission or FERC) is soliciting public comment on the 
currently approved information collection, FERC-725K (Mandatory 
Reliability Standards for the SERC Region).

DATES: Comments on the collection of information are due [insert date 
that is 60 days after publication in the Federal Register].

ADDRESSES: You may submit comments (identified by Docket No. IC16-1-
000) by either of the following methods:
     eFiling at Commission's Web site: https://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: https://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at https://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION:
    Title: Mandatory Reliability Standards for the SERC Region.
    OMB Control No.: 1902-0260.
    Type of Request: Three-year extension of the FERC-725K information 
collection requirements with no changes to the current reporting 
requirements.
    Abstract: Section 215 of the Federal Power Act (FPA) requires a 
Commission-certified Electric Reliability Organization (ERO) to develop 
mandatory and enforceable Reliability Standards, which are subject to 
Commission review and approval. Once approved, the Reliability 
Standards may be enforced by NERC, subject to Commission oversight, or 
by the Commission independently.
    Reliability Standards that NERC proposes to the Commission may 
include Reliability Standards that are proposed by a Regional Entity to 
be effective in that region. In Order No. 672, the Commission noted 
that:

    As a general matter, we will accept the following two types of 
regional differences, provided they are otherwise just, reasonable, 
not unduly discriminatory or preferential and in the public 
interest, as required under the statute: (1) a regional difference 
that is more stringent than the continent-wide Reliability Standard, 
including a regional difference that addresses matters that the 
continent-wide Reliability Standard does not; and (2) a regional 
Reliability Standard that is necessitated by a physical difference 
in the Bulk-Power System.

    When NERC reviews a regional Reliability Standard that would be 
applicable on an interconnection-wide basis and that has been proposed 
by a Regional Entity organized on an interconnection-wide basis, NERC 
must rebuttably presume that the regional Reliability Standard is just, 
reasonable, not unduly discriminatory or preferential, and in the 
public interest. In turn, the Commission must give ``due weight'' to 
the technical expertise of NERC and of a Regional Entity organized on 
an interconnection-wide basis.
    On April 19, 2007, the Commission accepted delegation agreements 
between NERC and each of the eight Regional Entities. In the order, the 
Commission accepted SERC as a Regional Entity organized on less than an 
interconnection-wide basis. As a Regional Entity, SERC oversees Bulk-
Power System reliability within the SERC Region, which covers a 
geographic area of approximately 560,000 square miles in a sixteen-
state area in the southeastern and central United States (all of 
Missouri, Alabama, Tennessee, North Carolina, South Carolina, Georgia, 
Mississippi, and portions of Iowa, Illinois, Kentucky, Virginia, 
Oklahoma, Arkansas, Louisiana, Texas and Florida). The SERC Region is 
currently geographically divided into five subregions that are 
identified as Southeastern, Central, VACAR, Delta, and Gateway.
    Type of Respondents: Entities registered with the North American

[[Page 61813]]

Electric Reliability Corporation (within the SERC region).
    Estimate of Annual Burden \1\: The Commission estimates the annual 
public reporting burden for the information collection as:
---------------------------------------------------------------------------

    \1\ The Commission defines burden as the total time, effort, or 
financial resources expended by persons to generate, maintain, 
retain, or disclose or provide information to or for a Federal 
agency. For further explanation of what is included in the 
information collection burden, reference 5 Code of Federal 
Regulations 1320.3.
    \2\ The $66.45 hourly cost figure (including benefits) comes 
from the cost of an engineer as posted on the Bureau of Labor 
Statistics (BLS) Web site: https://www.bls.gov/oes/current/naics2_22.htm#11-0000 (wage category 17-2071).
    \3\ Both figures for PC respondents are not to be totaled. They 
represent the same set of respondents.
    \4\ The $66.45 hourly cost figure (including benefits) comes 
from the cost of an engineer as posted on the Bureau of Labor 
Statistics (BLS) Web site: https://www.bls.gov/oes/current/naics2_22.htm#11-0000 (wage category 17-2071).
    \5\ Both figures for GO respondents are not to be totaled. They 
represent the same set of respondents.
    \6\ The hourly cost for GOs uses the hourly reporting cost of 
$66.45 per hour is based on the cost (including benefits) of an 
engineer to implement the requirements of the rule.
    \7\ The record retention cost of $37.50 per hour (including 
benefits) comes from Commission staff research on record retention 
requirements (wage category 43-4199 for information and record 
clerks).

                                              FERC-725K: Mandatory Reliability Standard for the SERC Region
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                       Total annual
                                            Number of       Annual number of   Total number of     Average burden    burden hours and       Cost per
                                         respondents (1)     responses per        responses         and cost per    total annual cost    respondent ($)
                                                             respondent (2)      (1)*(2)=(3)      response \2\ (4)     (3)*(4)=(5)          (5)/(1)
--------------------------------------------------------------------------------------------------------------------------------------------------------
PCs: Design and Document Automatic                 \3\ 21                  1                 21                  8                168               $532
 UFLS Program.........................                                                                        $532        \4\ $11,172
PCs: Provide Documentation and Data to             \3\ 21                  1                 21                 16                336             $1,064
 SERC.................................                                                                      $1,064            $22,344
GOs: Provide Documentation and Data to            \5\ 104                  1                104                 16              1,664             $1,064
 SERC.................................                                                                      $1,064       \6\ $110,656
GOs: Record Retention.................            \5\ 104                  1                104                  4                416               $150
                                                                                                              $150        \7\ $15,600
    Total.............................  .................  .................  .................                125              2,584             $2,810
                                                                                                                             $159,772
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.

    Dated: October 7, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-26082 Filed 10-13-15; 8:45 am]
BILLING CODE 6717-01-P