Federal Register / Vol. 80, No. 198 / Wednesday, October 14, 2015 / Notices
four 3–MW turbine-generators, having a
total combined generating capacity of 12
MW; (4) a new 1,000-foot-long by 220foot-wide tailrace area; (5) a new 60foot-long by 50-foot-wide substation; (6)
a new 50-foot-wide by 60-foot-long
substation; (7) a new 5.49-mile-long,
115-kilovolt transmission line; and (8)
appurtenant facilities. The project
would have an estimated annual
generation of 102.5 gigawatt-hours.
Applicant Contact: Mr. Ander
Gonzalez, 2655 Le June Road, Suite 804,
Coral Gables, FL 33134; +34 93 252
3840.
FERC Contact: Tyrone A. Williams,
(202) 502–6331.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. The Commission strongly
encourages electronic filing. Please file
comments, motions to intervene, notices
of intent, and competing applications
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14695–000 or
P–14705–000.
More information about this project,
including a copy of either application
can be viewed or printed on the
‘‘eLibrary’’ link of Commission’s Web
site at https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14695 or P–14705) in the docket
number field to access the document.
For assistance, contact FERC Online
Support.
Dated: October 7, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–26071 Filed 10–13–15; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:39 Oct 13, 2015
Jkt 238001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7518–000]
Erie Boulevard Hydropower, L.P.; Saint
Regis Mohawk Tribe; Notice of
Authorization for Continued Project
Operation
On September 30, 2013, Erie
Boulevard Hydropower, L.P., and Saint
Regis Mohawk Tribe, co-licensees for
the Hogansburg Hydroelectric Project,
filed an Application for a New License
pursuant to the Federal Power Act
(FPA) and the Commission’s regulations
thereunder. The Hogansburg
Hydroelectric Project is located on the
St. Regis River in Franklin County, New
York.
The license for Project No.7518 was
issued for a period ending September
30, 2015. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 7518
is issued to the licensee for a period
effective October 1, 2015 through
September 30, 2016 or until the
issuance of a new license for the project
or other disposition under the FPA,
whichever comes first. If issuance of a
new license (or other disposition) does
not take place on or before September
30, 2016, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual
license under section 15(a)(1) of the
FPA is renewed automatically without
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
61809
further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the co-licensees, Erie Boulevard
Hydropower, L.P., and Saint Regis
Mohawk Tribe are authorized to
continue operation of the Hogansburg
Hydroelectric Project, until such time as
the Commission acts on its application
for a subsequent license.
Dated: October 6, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–26079 Filed 10–13–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings—2
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR15–37–001 and
PR15–37–002.
Applicants: Bay Gas Storage
Company, Ltd.
Description: Submits tariff filing per
284.123(b), (e), (g): Amendment to
Petition under NGPA Section 311 to be
effective 6/8/2015; Filing Type: 1270.
Filed Dates: 10/2/15; 10/5/15.
Accession Numbers: 20151002–5097;
20151005–5226.
Comments Due: 5 p.m. ET 10/26/15.
284.123(g) Protests Due: 5 p.m. ET 10/
26/15.
Docket Numbers: RP16–1–000.
Applicants: Texas Gas Transmission,
LLC.
Description: Section 4(d) Rate Filing:
2015 Fuel Tracker Filing to be effective
11/1/2015.
Filed Date: 10/1/15.
Accession Number: 20151001–5077.
Comments Due: 5 p.m. ET 10/13/15.
Docket Numbers: RP16–2–000.
Applicants: Panhandle Eastern Pipe
Line Company, LP.
Description: Section 4(d) Rate Filing:
Fuel Filing on 10–1–15 to be effective
11/1/2015.
Filed Date: 10/1/15.
Accession Number: 20151001–5086.
Comments Due: 5 p.m. ET 10/13/15.
Docket Numbers: RP16–3–000.
Applicants: Trunkline Gas Company,
LLC.
Description: Section 4(d) Rate Filing:
Fuel Filing on 10–1–15 to be effective
11/1/2015.
E:\FR\FM\14OCN1.SGM
14OCN1
Agencies
[Federal Register Volume 80, Number 198 (Wednesday, October 14, 2015)]
[Notices]
[Page 61809]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-26079]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 7518-000]
Erie Boulevard Hydropower, L.P.; Saint Regis Mohawk Tribe; Notice
of Authorization for Continued Project Operation
On September 30, 2013, Erie Boulevard Hydropower, L.P., and Saint
Regis Mohawk Tribe, co-licensees for the Hogansburg Hydroelectric
Project, filed an Application for a New License pursuant to the Federal
Power Act (FPA) and the Commission's regulations thereunder. The
Hogansburg Hydroelectric Project is located on the St. Regis River in
Franklin County, New York.
The license for Project No.7518 was issued for a period ending
September 30, 2015. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year-to-year an annual license to the then licensee under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c),
and as set forth at 18 CFR 16.21(a), if the licensee of such project
has filed an application for a subsequent license, the licensee may
continue to operate the project in accordance with the terms and
conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 7518 is issued to
the licensee for a period effective October 1, 2015 through September
30, 2016 or until the issuance of a new license for the project or
other disposition under the FPA, whichever comes first. If issuance of
a new license (or other disposition) does not take place on or before
September 30, 2016, notice is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under section 15(a)(1) of the FPA is
renewed automatically without further order or notice by the
Commission, unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that the co-licensees, Erie Boulevard Hydropower, L.P.,
and Saint Regis Mohawk Tribe are authorized to continue operation of
the Hogansburg Hydroelectric Project, until such time as the Commission
acts on its application for a subsequent license.
Dated: October 6, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-26079 Filed 10-13-15; 8:45 am]