Erie Boulevard Hydropower, L.P.; Saint Regis Mohawk Tribe; Notice of Authorization for Continued Project Operation, 61809 [2015-26079]

Download as PDF tkelley on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 80, No. 198 / Wednesday, October 14, 2015 / Notices four 3–MW turbine-generators, having a total combined generating capacity of 12 MW; (4) a new 1,000-foot-long by 220foot-wide tailrace area; (5) a new 60foot-long by 50-foot-wide substation; (6) a new 50-foot-wide by 60-foot-long substation; (7) a new 5.49-mile-long, 115-kilovolt transmission line; and (8) appurtenant facilities. The project would have an estimated annual generation of 102.5 gigawatt-hours. Applicant Contact: Mr. Ander Gonzalez, 2655 Le June Road, Suite 804, Coral Gables, FL 33134; +34 93 252 3840. FERC Contact: Tyrone A. Williams, (202) 502–6331. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14695–000 or P–14705–000. More information about this project, including a copy of either application can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14695 or P–14705) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: October 7, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–26071 Filed 10–13–15; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 16:39 Oct 13, 2015 Jkt 238001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7518–000] Erie Boulevard Hydropower, L.P.; Saint Regis Mohawk Tribe; Notice of Authorization for Continued Project Operation On September 30, 2013, Erie Boulevard Hydropower, L.P., and Saint Regis Mohawk Tribe, co-licensees for the Hogansburg Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Hogansburg Hydroelectric Project is located on the St. Regis River in Franklin County, New York. The license for Project No.7518 was issued for a period ending September 30, 2015. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 7518 is issued to the licensee for a period effective October 1, 2015 through September 30, 2016 or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before September 30, 2016, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 61809 further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the co-licensees, Erie Boulevard Hydropower, L.P., and Saint Regis Mohawk Tribe are authorized to continue operation of the Hogansburg Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Dated: October 6, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–26079 Filed 10–13–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings—2 Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: PR15–37–001 and PR15–37–002. Applicants: Bay Gas Storage Company, Ltd. Description: Submits tariff filing per 284.123(b), (e), (g): Amendment to Petition under NGPA Section 311 to be effective 6/8/2015; Filing Type: 1270. Filed Dates: 10/2/15; 10/5/15. Accession Numbers: 20151002–5097; 20151005–5226. Comments Due: 5 p.m. ET 10/26/15. 284.123(g) Protests Due: 5 p.m. ET 10/ 26/15. Docket Numbers: RP16–1–000. Applicants: Texas Gas Transmission, LLC. Description: Section 4(d) Rate Filing: 2015 Fuel Tracker Filing to be effective 11/1/2015. Filed Date: 10/1/15. Accession Number: 20151001–5077. Comments Due: 5 p.m. ET 10/13/15. Docket Numbers: RP16–2–000. Applicants: Panhandle Eastern Pipe Line Company, LP. Description: Section 4(d) Rate Filing: Fuel Filing on 10–1–15 to be effective 11/1/2015. Filed Date: 10/1/15. Accession Number: 20151001–5086. Comments Due: 5 p.m. ET 10/13/15. Docket Numbers: RP16–3–000. Applicants: Trunkline Gas Company, LLC. Description: Section 4(d) Rate Filing: Fuel Filing on 10–1–15 to be effective 11/1/2015. E:\FR\FM\14OCN1.SGM 14OCN1

Agencies

[Federal Register Volume 80, Number 198 (Wednesday, October 14, 2015)]
[Notices]
[Page 61809]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-26079]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 7518-000]


Erie Boulevard Hydropower, L.P.; Saint Regis Mohawk Tribe; Notice 
of Authorization for Continued Project Operation

    On September 30, 2013, Erie Boulevard Hydropower, L.P., and Saint 
Regis Mohawk Tribe, co-licensees for the Hogansburg Hydroelectric 
Project, filed an Application for a New License pursuant to the Federal 
Power Act (FPA) and the Commission's regulations thereunder. The 
Hogansburg Hydroelectric Project is located on the St. Regis River in 
Franklin County, New York.
    The license for Project No.7518 was issued for a period ending 
September 30, 2015. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), 
requires the Commission, at the expiration of a license term, to issue 
from year-to-year an annual license to the then licensee under the 
terms and conditions of the prior license until a new license is 
issued, or the project is otherwise disposed of as provided in section 
15 or any other applicable section of the FPA. If the project's prior 
license waived the applicability of section 15 of the FPA, then, based 
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), 
and as set forth at 18 CFR 16.21(a), if the licensee of such project 
has filed an application for a subsequent license, the licensee may 
continue to operate the project in accordance with the terms and 
conditions of the license after the minor or minor part license 
expires, until the Commission acts on its application. If the licensee 
of such a project has not filed an application for a subsequent 
license, then it may be required, pursuant to 18 CFR 16.21(b), to 
continue project operations until the Commission issues someone else a 
license for the project or otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 7518 is issued to 
the licensee for a period effective October 1, 2015 through September 
30, 2016 or until the issuance of a new license for the project or 
other disposition under the FPA, whichever comes first. If issuance of 
a new license (or other disposition) does not take place on or before 
September 30, 2016, notice is hereby given that, pursuant to 18 CFR 
16.18(c), an annual license under section 15(a)(1) of the FPA is 
renewed automatically without further order or notice by the 
Commission, unless the Commission orders otherwise.
    If the project is not subject to section 15 of the FPA, notice is 
hereby given that the co-licensees, Erie Boulevard Hydropower, L.P., 
and Saint Regis Mohawk Tribe are authorized to continue operation of 
the Hogansburg Hydroelectric Project, until such time as the Commission 
acts on its application for a subsequent license.

    Dated: October 6, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-26079 Filed 10-13-15; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.