Gulf South Pipeline Company, LP; Notice of Application, 61811-61812 [2015-26077]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 198 / Wednesday, October 14, 2015 / Notices
Docket Numbers: RP16–26–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: Section 4(d) Rate Filing:
Negotiated & Non-Conforming Service
Agmt—Broad Run Connector to be
effective 11/1/2015.
Filed Date: 10/1/15.
Accession Number: 20151001–5391.
Comments Due: 5 p.m. ET 10/13/15.
Docket Numbers: RP16–27–000.
Applicants: Equitrans, L.P.
Description: Section 4(d) Rate Filing:
Remaining Storage Inventory Balances
to be effective 11/1/2015.
Filed Date: 10/1/15.
Accession Number: 20151001–5409.
Comments Due: 5 p.m. ET 10/13/15.
Docket Numbers: RP16–28–000.
Applicants: Equitrans, L.P.
Description: Compliance filing Notice
Regarding Non-Jurisdictional Gathering
Facilities.
Filed Date: 10/5/15.
Accession Number: 20151005–5134.
Comments Due: 5 p.m. ET 10/19/15.
Docket Numbers: RP16–29–000.
Applicants: DBM Pipeline, LLC.
Description: Section 4(d) Rate Filing:
Summary of Negotiated Rate
Agreements to be effective 10/1/2015.
Filed Date: 10/5/15.
Accession Number: 20151005–5136.
Comments Due: 5 p.m. ET 10/19/15.
Docket Numbers: RP16–30–000.
Applicants: Ozark Gas Transmission,
L.L.C.
Description: Section 4(d) Rate Filing:
BP Energy Neg Rate eff 5–1–2018 to be
effective 5/1/2018.
Filed Date: 10/5/15.
Accession Number: 20151005–5144.
Comments Due: 5 p.m. ET 10/19/15.
Docket Numbers: RP16–31–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: Section 4(d) Rate Filing:
Constellation Energy Negotiated Rate to
be effective 11/1/2015.
Filed Date: 10/5/15.
Accession Number: 20151005–5252.
Comments Due: 5 p.m. ET 10/19/15.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: RP15–1204–001.
Applicants: DBM Pipeline, LLC.
Description: Compliance filing
Compliance Filing to be effective 10/1/
2015.
VerDate Sep<11>2014
16:39 Oct 13, 2015
Jkt 238001
Filed Date: 10/1/15.
Accession Number: 20151001–5089.
Comments Due: 5 p.m. ET 10/13/15.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 6, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–26114 Filed 10–13–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–562–000]
Gulf South Pipeline Company, LP;
Notice of Application
Take notice that on September 29,
2015, Gulf South Pipeline Company, LP
(Gulf South), 9 Greenway Plaza, Suite
2800, Houston, Texas 77046, filed in
Docket No. CP15–562–000 an
application pursuant to section 7(b) of
the Natural Gas Act (NGA) requesting an
order authorizing the abandonment by
sale to Enerfin Field Services LLC of
approximately 26.65 miles of 14-inchdiameter pipeline, ancillary auxiliary
facilities, and appurtenances, and four
certificated field gathering laterals
located in Jasper and Newton counties,
Texas and Beauregard Parish, Louisiana,
all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Nell
Gutierrez, Regulatory Affairs, Gulf
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
61811
South Pipeline, LP, 9 Greenway Plaza,
Suite 2800, Houston, Texas 77046 at
(713) 479–8252.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
original and 7 copies of filings made
with the Commission and must mail a
copy to the applicant and to every other
party in the proceeding. Only parties to
the proceeding can ask for court review
of Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
E:\FR\FM\14OCN1.SGM
14OCN1
61812
Federal Register / Vol. 80, No. 198 / Wednesday, October 14, 2015 / Notices
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street,
NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on October 28, 2015.
Dated: October 7, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–26077 Filed 10–13–15; 8:45 am]
tkelley on DSK3SPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:39 Oct 13, 2015
Jkt 238001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC16–1–000]
Commission Information Collection
Activities (FERC–725K); Comment
Request; Extension
Federal Energy Regulatory
Commission, Energy.
ACTION: Notice of information collection
and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, 44 U.S.C.
3506(c)(2)(A), the Federal Energy
Regulatory Commission (Commission or
FERC) is soliciting public comment on
the currently approved information
collection, FERC–725K (Mandatory
Reliability Standards for the SERC
Region).
DATES: Comments on the collection of
information are due [insert date that is
60 days after publication in the Federal
Register].
ADDRESSES: You may submit comments
(identified by Docket No. IC16–1–000)
by either of the following methods:
• eFiling at Commission’s Web site:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, telephone
at (202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION:
Title: Mandatory Reliability Standards
for the SERC Region.
OMB Control No.: 1902–0260.
Type of Request: Three-year extension
of the FERC–725K information
collection requirements with no changes
to the current reporting requirements.
Abstract: Section 215 of the Federal
Power Act (FPA) requires a
SUMMARY:
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Commission-certified Electric
Reliability Organization (ERO) to
develop mandatory and enforceable
Reliability Standards, which are subject
to Commission review and approval.
Once approved, the Reliability
Standards may be enforced by NERC,
subject to Commission oversight, or by
the Commission independently.
Reliability Standards that NERC
proposes to the Commission may
include Reliability Standards that are
proposed by a Regional Entity to be
effective in that region. In Order No.
672, the Commission noted that:
As a general matter, we will accept the
following two types of regional differences,
provided they are otherwise just, reasonable,
not unduly discriminatory or preferential and
in the public interest, as required under the
statute: (1) a regional difference that is more
stringent than the continent-wide Reliability
Standard, including a regional difference that
addresses matters that the continent-wide
Reliability Standard does not; and (2) a
regional Reliability Standard that is
necessitated by a physical difference in the
Bulk-Power System.
When NERC reviews a regional
Reliability Standard that would be
applicable on an interconnection-wide
basis and that has been proposed by a
Regional Entity organized on an
interconnection-wide basis, NERC must
rebuttably presume that the regional
Reliability Standard is just, reasonable,
not unduly discriminatory or
preferential, and in the public interest.
In turn, the Commission must give ‘‘due
weight’’ to the technical expertise of
NERC and of a Regional Entity
organized on an interconnection-wide
basis.
On April 19, 2007, the Commission
accepted delegation agreements between
NERC and each of the eight Regional
Entities. In the order, the Commission
accepted SERC as a Regional Entity
organized on less than an
interconnection-wide basis. As a
Regional Entity, SERC oversees BulkPower System reliability within the
SERC Region, which covers a
geographic area of approximately
560,000 square miles in a sixteen-state
area in the southeastern and central
United States (all of Missouri, Alabama,
Tennessee, North Carolina, South
Carolina, Georgia, Mississippi, and
portions of Iowa, Illinois, Kentucky,
Virginia, Oklahoma, Arkansas,
Louisiana, Texas and Florida). The
SERC Region is currently geographically
divided into five subregions that are
identified as Southeastern, Central,
VACAR, Delta, and Gateway.
Type of Respondents: Entities
registered with the North American
E:\FR\FM\14OCN1.SGM
14OCN1
Agencies
[Federal Register Volume 80, Number 198 (Wednesday, October 14, 2015)]
[Notices]
[Pages 61811-61812]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-26077]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP15-562-000]
Gulf South Pipeline Company, LP; Notice of Application
Take notice that on September 29, 2015, Gulf South Pipeline
Company, LP (Gulf South), 9 Greenway Plaza, Suite 2800, Houston, Texas
77046, filed in Docket No. CP15-562-000 an application pursuant to
section 7(b) of the Natural Gas Act (NGA) requesting an order
authorizing the abandonment by sale to Enerfin Field Services LLC of
approximately 26.65 miles of 14-inch-diameter pipeline, ancillary
auxiliary facilities, and appurtenances, and four certificated field
gathering laterals located in Jasper and Newton counties, Texas and
Beauregard Parish, Louisiana, all as more fully set forth in the
application which is on file with the Commission and open to public
inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to Nell
Gutierrez, Regulatory Affairs, Gulf South Pipeline, LP, 9 Greenway
Plaza, Suite 2800, Houston, Texas 77046 at (713) 479-8252.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either complete
its environmental assessment (EA) and place it into the Commission's
public record (eLibrary) for this proceeding; or issue a Notice of
Schedule for Environmental Review. If a Notice of Schedule for
Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit original and 7 copies of filings made with the Commission and
must mail a copy to the applicant and to every other party in the
proceeding. Only parties to the proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
[[Page 61812]]
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 14 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on October 28, 2015.
Dated: October 7, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-26077 Filed 10-13-15; 8:45 am]
BILLING CODE 6717-01-P