Notice of Issuance of Part 71 Federal Operating Permit to Great Lakes Transmission Limited Partnership, 61208 [2015-25838]

Download as PDF 61208 Federal Register / Vol. 80, No. 196 / Friday, October 9, 2015 / Notices Route 162) from State Route 33 (Old Knoxville Highway) to US 321/State Route 73/Lamar Alexander Parkway, Review Period Ends: 11/18/2015, Contact: Theresa Claxton 615–781– 5770. Revision to FR Notice Published: 09/18/2015; Extending Comment Period from 10/19/2015 to 11/18/2015. EIS No. 20150278, Draft, USACE, GA, Update of the Water Control Manual for the Apalachicola-ChattahoocheeFlint River Basin in Alabama, Florida, and Georgia and Water Supply Storage Assessment, Comment Period Ends: 12/01/2015, Contact: Lewis C. Sumner 251–694–3857. Revision to FR Notice Published 10/02/2015; Correction to EIS Status should read ’Draft’ and Correcting the Comment Period from 11/16/2015 to 12/1/2015. Dated: October 6, 2015. Karin Leff, Acting Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2015–25795 Filed 10–8–15; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–9935–20-Region 5] Notice of Issuance of Part 71 Federal Operating Permit to Great Lakes Transmission Limited Partnership Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: This notice announces that on August 28, 2015, pursuant to title V of the Clean Air Act, the Environmental Protection Agency (EPA) issued a title V permit to operate (title V permit) to Great Lakes Transmission Limited Partnership. This permit authorizes Great Lakes Transmission Limited Partnership to operate a natural gas compressor station at its facility (Facility) in Deer River, Minnesota. The compressor station consists of two stationary natural gas-fired turbines, which in turn drive two natural gas compressors for the Deer River Compressor Station No.4, which is located on the Leech Lake Band of Ojibwe Indian Reservation. DATES: During the public comment period, which ended June 1, 2015, EPA received comments on the draft title V permit. Therefore, in accordance with 40 CFR 71.11(i)(2), this permit is effective 30 days after service of notice of the decision to issue the permit, October 2, 2015. 40 CFR 71.11(i)(2) provides that the final permit decision tkelley on DSK3SPTVN1PROD with NOTICES SUMMARY: VerDate Sep<11>2014 17:44 Oct 08, 2015 Jkt 238001 becomes effective 30 days after the service of notice of the decision unless a later effective date is specified, review is requested, or no comments requested a change in the draft permit, in which case the permit becomes effective immediately upon issuance. The exceptions noted above to the 30 days after notice of permit issuance date did not apply in this permitting action. EPA received comments on the draft permit from the Leech Lake Band of Ojibwe and the Minnesota Historical Society State Historic Preservation Office during the public comment period, and changes were made to the final permit. ADDRESSES: The final signed permit is available for public inspection online at https://yosemite.epa.gov/r5/r5ard.nsf/ Tribal+Permits!OpenView, or during normal business hours at the following address: EPA, Region 5, 77 West Jackson Boulevard (AR–18J), Chicago, Illinois 60604. FOR FURTHER INFORMATION CONTACT: Constantine Blathras, Environmental Engineer, EPA, Region 5, 77 W. Jackson Boulevard (AR–18J), Chicago, Illinois 60604, (312) 886–0671, or blathras.constantine@epa.gov. SUPPLEMENTARY INFORMATION: This supplemental information is organized as follows: A. What is the background information? B. What is the purpose of this notice? A. What Is the background information? The Deer River Compressor Station No. 4 is owned by Great Lakes Transmission Limited Partnership. Deer River Compressor Station No. 4 consists of two stationary natural gas-fired turbines which, in turn, drive two natural gas compressors. EPA received the permit application on April 25, 2014. On April 29, 2015, EPA made available for a 30-day public comment a draft Federal title V permit to operate (V–LL–2706100011–14–01) in accordance with the requirements of 40 CFR 71.11(d). This title V permit incorporated all applicable air quality requirements for the Deer River Compressor Station No.4, including the monitoring necessary to ensure compliance with these requirements. EPA received written comments, responded to those comments, finalized the permit and provided copies to the applicant pursuant to 40 CFR 71.11(i). B. What is the purpose of this notice? EPA is notifying the public of the issuance of the title V permit to Great Lakes Transmission Limited Partnership on August 28, 2015. Because EPA PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 received comments on the draft title V permit, it is effective 30 days after notice of permit issuance, October 2, 2015, pursuant to 40 CFR 71.11(i)(2). Dated: September 25, 2015. Susan Hedman, Regional Administrator, Region 5. [FR Doc. 2015–25838 Filed 10–8–15; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPPT–2014–0734; FRL 9933–60– OEI] Agency Information Collection Activities; Information Collection Request Submitted to OMB for Review and Approval; Comment Request; Health and Safety Data Reporting, Submission of Lists and Copies of Health and Safety Studies Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: EPA has submitted the following information collection request (ICR) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (PRA): ‘‘Health and Safety Data Reporting, Submission of Lists and Copies of Health and Safety Studies’’ and identified by EPA ICR No. 0575.15 and OMB Control No. 2070– 0004. The ICR, which is available in the docket along with other related materials, provides a detailed explanation of the collection activities and the burden estimate that is only briefly summarized in this document. EPA did not receive any comments in response to the previously provided public review opportunity issued in the Federal Register on March 30, 2015 (80 FR 16672). With this submission, EPA is providing an additional 30 days for public review. DATES: Comments must be received on or before November 9, 2015. ADDRESSES: Submit your comments, identified by docket identification (ID) number EPA–HQ–OPPT–2014–0734, to both EPA and OMB as follows: • To EPA online using https:// www.regulations.gov (our preferred method) or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW., Washington, DC 20460. • To OMB via email to oira_ submission@omb.eop.gov. Address comments to OMB Desk Officer for EPA. SUMMARY: E:\FR\FM\09OCN1.SGM 09OCN1

Agencies

[Federal Register Volume 80, Number 196 (Friday, October 9, 2015)]
[Notices]
[Page 61208]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-25838]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[FRL-9935-20-Region 5]


Notice of Issuance of Part 71 Federal Operating Permit to Great 
Lakes Transmission Limited Partnership

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: This notice announces that on August 28, 2015, pursuant to 
title V of the Clean Air Act, the Environmental Protection Agency (EPA) 
issued a title V permit to operate (title V permit) to Great Lakes 
Transmission Limited Partnership. This permit authorizes Great Lakes 
Transmission Limited Partnership to operate a natural gas compressor 
station at its facility (Facility) in Deer River, Minnesota. The 
compressor station consists of two stationary natural gas-fired 
turbines, which in turn drive two natural gas compressors for the Deer 
River Compressor Station No.4, which is located on the Leech Lake Band 
of Ojibwe Indian Reservation.

DATES: During the public comment period, which ended June 1, 2015, EPA 
received comments on the draft title V permit. Therefore, in accordance 
with 40 CFR 71.11(i)(2), this permit is effective 30 days after service 
of notice of the decision to issue the permit, October 2, 2015. 40 CFR 
71.11(i)(2) provides that the final permit decision becomes effective 
30 days after the service of notice of the decision unless a later 
effective date is specified, review is requested, or no comments 
requested a change in the draft permit, in which case the permit 
becomes effective immediately upon issuance. The exceptions noted above 
to the 30 days after notice of permit issuance date did not apply in 
this permitting action. EPA received comments on the draft permit from 
the Leech Lake Band of Ojibwe and the Minnesota Historical Society 
State Historic Preservation Office during the public comment period, 
and changes were made to the final permit.

ADDRESSES: The final signed permit is available for public inspection 
online at https://yosemite.epa.gov/r5/r5ard.nsf/Tribal+Permits!OpenView, 
or during normal business hours at the following address: EPA, Region 
5, 77 West Jackson Boulevard (AR-18J), Chicago, Illinois 60604.

FOR FURTHER INFORMATION CONTACT: Constantine Blathras, Environmental 
Engineer, EPA, Region 5, 77 W. Jackson Boulevard (AR-18J), Chicago, 
Illinois 60604, (312) 886-0671, or blathras.constantine@epa.gov.

SUPPLEMENTARY INFORMATION: This supplemental information is organized 
as follows:

A. What is the background information?
B. What is the purpose of this notice?

A. What Is the background information?

    The Deer River Compressor Station No. 4 is owned by Great Lakes 
Transmission Limited Partnership. Deer River Compressor Station No. 4 
consists of two stationary natural gas-fired turbines which, in turn, 
drive two natural gas compressors. EPA received the permit application 
on April 25, 2014.
    On April 29, 2015, EPA made available for a 30-day public comment a 
draft Federal title V permit to operate (V-LL-2706100011-14-01) in 
accordance with the requirements of 40 CFR 71.11(d). This title V 
permit incorporated all applicable air quality requirements for the 
Deer River Compressor Station No.4, including the monitoring necessary 
to ensure compliance with these requirements. EPA received written 
comments, responded to those comments, finalized the permit and 
provided copies to the applicant pursuant to 40 CFR 71.11(i).

B. What is the purpose of this notice?

    EPA is notifying the public of the issuance of the title V permit 
to Great Lakes Transmission Limited Partnership on August 28, 2015. 
Because EPA received comments on the draft title V permit, it is 
effective 30 days after notice of permit issuance, October 2, 2015, 
pursuant to 40 CFR 71.11(i)(2).

    Dated: September 25, 2015.
Susan Hedman,
Regional Administrator, Region 5.
[FR Doc. 2015-25838 Filed 10-8-15; 8:45 am]