Notice of Issuance of Part 71 Federal Operating Permit to Great Lakes Transmission Limited Partnership, 61208 [2015-25838]
Download as PDF
61208
Federal Register / Vol. 80, No. 196 / Friday, October 9, 2015 / Notices
Route 162) from State Route 33 (Old
Knoxville Highway) to US 321/State
Route 73/Lamar Alexander Parkway,
Review Period Ends: 11/18/2015,
Contact: Theresa Claxton 615–781–
5770. Revision to FR Notice
Published: 09/18/2015; Extending
Comment Period from 10/19/2015 to
11/18/2015.
EIS No. 20150278, Draft, USACE, GA,
Update of the Water Control Manual
for the Apalachicola-ChattahoocheeFlint River Basin in Alabama, Florida,
and Georgia and Water Supply
Storage Assessment, Comment Period
Ends: 12/01/2015, Contact: Lewis C.
Sumner 251–694–3857. Revision to
FR Notice Published 10/02/2015;
Correction to EIS Status should read
’Draft’ and Correcting the Comment
Period from 11/16/2015 to 12/1/2015.
Dated: October 6, 2015.
Karin Leff,
Acting Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2015–25795 Filed 10–8–15; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9935–20-Region 5]
Notice of Issuance of Part 71 Federal
Operating Permit to Great Lakes
Transmission Limited Partnership
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
This notice announces that on
August 28, 2015, pursuant to title V of
the Clean Air Act, the Environmental
Protection Agency (EPA) issued a title V
permit to operate (title V permit) to
Great Lakes Transmission Limited
Partnership. This permit authorizes
Great Lakes Transmission Limited
Partnership to operate a natural gas
compressor station at its facility
(Facility) in Deer River, Minnesota. The
compressor station consists of two
stationary natural gas-fired turbines,
which in turn drive two natural gas
compressors for the Deer River
Compressor Station No.4, which is
located on the Leech Lake Band of
Ojibwe Indian Reservation.
DATES: During the public comment
period, which ended June 1, 2015, EPA
received comments on the draft title V
permit. Therefore, in accordance with
40 CFR 71.11(i)(2), this permit is
effective 30 days after service of notice
of the decision to issue the permit,
October 2, 2015. 40 CFR 71.11(i)(2)
provides that the final permit decision
tkelley on DSK3SPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:44 Oct 08, 2015
Jkt 238001
becomes effective 30 days after the
service of notice of the decision unless
a later effective date is specified, review
is requested, or no comments requested
a change in the draft permit, in which
case the permit becomes effective
immediately upon issuance. The
exceptions noted above to the 30 days
after notice of permit issuance date did
not apply in this permitting action. EPA
received comments on the draft permit
from the Leech Lake Band of Ojibwe
and the Minnesota Historical Society
State Historic Preservation Office during
the public comment period, and
changes were made to the final permit.
ADDRESSES: The final signed permit is
available for public inspection online at
https://yosemite.epa.gov/r5/r5ard.nsf/
Tribal+Permits!OpenView, or during
normal business hours at the following
address: EPA, Region 5, 77 West Jackson
Boulevard (AR–18J), Chicago, Illinois
60604.
FOR FURTHER INFORMATION CONTACT:
Constantine Blathras, Environmental
Engineer, EPA, Region 5, 77 W. Jackson
Boulevard (AR–18J), Chicago, Illinois
60604, (312) 886–0671, or
blathras.constantine@epa.gov.
SUPPLEMENTARY INFORMATION: This
supplemental information is organized
as follows:
A. What is the background information?
B. What is the purpose of this notice?
A. What Is the background
information?
The Deer River Compressor Station
No. 4 is owned by Great Lakes
Transmission Limited Partnership. Deer
River Compressor Station No. 4 consists
of two stationary natural gas-fired
turbines which, in turn, drive two
natural gas compressors. EPA received
the permit application on April 25,
2014.
On April 29, 2015, EPA made
available for a 30-day public comment
a draft Federal title V permit to operate
(V–LL–2706100011–14–01) in
accordance with the requirements of 40
CFR 71.11(d). This title V permit
incorporated all applicable air quality
requirements for the Deer River
Compressor Station No.4, including the
monitoring necessary to ensure
compliance with these requirements.
EPA received written comments,
responded to those comments, finalized
the permit and provided copies to the
applicant pursuant to 40 CFR 71.11(i).
B. What is the purpose of this notice?
EPA is notifying the public of the
issuance of the title V permit to Great
Lakes Transmission Limited Partnership
on August 28, 2015. Because EPA
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
received comments on the draft title V
permit, it is effective 30 days after
notice of permit issuance, October 2,
2015, pursuant to 40 CFR 71.11(i)(2).
Dated: September 25, 2015.
Susan Hedman,
Regional Administrator, Region 5.
[FR Doc. 2015–25838 Filed 10–8–15; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPPT–2014–0734; FRL 9933–60–
OEI]
Agency Information Collection
Activities; Information Collection
Request Submitted to OMB for Review
and Approval; Comment Request;
Health and Safety Data Reporting,
Submission of Lists and Copies of
Health and Safety Studies
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
EPA has submitted the
following information collection request
(ICR) to the Office of Management and
Budget (OMB) for review and approval
in accordance with the Paperwork
Reduction Act (PRA): ‘‘Health and
Safety Data Reporting, Submission of
Lists and Copies of Health and Safety
Studies’’ and identified by EPA ICR No.
0575.15 and OMB Control No. 2070–
0004. The ICR, which is available in the
docket along with other related
materials, provides a detailed
explanation of the collection activities
and the burden estimate that is only
briefly summarized in this document.
EPA did not receive any comments in
response to the previously provided
public review opportunity issued in the
Federal Register on March 30, 2015 (80
FR 16672). With this submission, EPA is
providing an additional 30 days for
public review.
DATES: Comments must be received on
or before November 9, 2015.
ADDRESSES: Submit your comments,
identified by docket identification (ID)
number EPA–HQ–OPPT–2014–0734, to
both EPA and OMB as follows:
• To EPA online using https://
www.regulations.gov (our preferred
method) or by mail to: EPA Docket
Center, Environmental Protection
Agency, Mail Code 28221T, 1200
Pennsylvania Ave. NW., Washington,
DC 20460.
• To OMB via email to oira_
submission@omb.eop.gov. Address
comments to OMB Desk Officer for EPA.
SUMMARY:
E:\FR\FM\09OCN1.SGM
09OCN1
Agencies
[Federal Register Volume 80, Number 196 (Friday, October 9, 2015)]
[Notices]
[Page 61208]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-25838]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[FRL-9935-20-Region 5]
Notice of Issuance of Part 71 Federal Operating Permit to Great
Lakes Transmission Limited Partnership
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This notice announces that on August 28, 2015, pursuant to
title V of the Clean Air Act, the Environmental Protection Agency (EPA)
issued a title V permit to operate (title V permit) to Great Lakes
Transmission Limited Partnership. This permit authorizes Great Lakes
Transmission Limited Partnership to operate a natural gas compressor
station at its facility (Facility) in Deer River, Minnesota. The
compressor station consists of two stationary natural gas-fired
turbines, which in turn drive two natural gas compressors for the Deer
River Compressor Station No.4, which is located on the Leech Lake Band
of Ojibwe Indian Reservation.
DATES: During the public comment period, which ended June 1, 2015, EPA
received comments on the draft title V permit. Therefore, in accordance
with 40 CFR 71.11(i)(2), this permit is effective 30 days after service
of notice of the decision to issue the permit, October 2, 2015. 40 CFR
71.11(i)(2) provides that the final permit decision becomes effective
30 days after the service of notice of the decision unless a later
effective date is specified, review is requested, or no comments
requested a change in the draft permit, in which case the permit
becomes effective immediately upon issuance. The exceptions noted above
to the 30 days after notice of permit issuance date did not apply in
this permitting action. EPA received comments on the draft permit from
the Leech Lake Band of Ojibwe and the Minnesota Historical Society
State Historic Preservation Office during the public comment period,
and changes were made to the final permit.
ADDRESSES: The final signed permit is available for public inspection
online at https://yosemite.epa.gov/r5/r5ard.nsf/Tribal+Permits!OpenView,
or during normal business hours at the following address: EPA, Region
5, 77 West Jackson Boulevard (AR-18J), Chicago, Illinois 60604.
FOR FURTHER INFORMATION CONTACT: Constantine Blathras, Environmental
Engineer, EPA, Region 5, 77 W. Jackson Boulevard (AR-18J), Chicago,
Illinois 60604, (312) 886-0671, or blathras.constantine@epa.gov.
SUPPLEMENTARY INFORMATION: This supplemental information is organized
as follows:
A. What is the background information?
B. What is the purpose of this notice?
A. What Is the background information?
The Deer River Compressor Station No. 4 is owned by Great Lakes
Transmission Limited Partnership. Deer River Compressor Station No. 4
consists of two stationary natural gas-fired turbines which, in turn,
drive two natural gas compressors. EPA received the permit application
on April 25, 2014.
On April 29, 2015, EPA made available for a 30-day public comment a
draft Federal title V permit to operate (V-LL-2706100011-14-01) in
accordance with the requirements of 40 CFR 71.11(d). This title V
permit incorporated all applicable air quality requirements for the
Deer River Compressor Station No.4, including the monitoring necessary
to ensure compliance with these requirements. EPA received written
comments, responded to those comments, finalized the permit and
provided copies to the applicant pursuant to 40 CFR 71.11(i).
B. What is the purpose of this notice?
EPA is notifying the public of the issuance of the title V permit
to Great Lakes Transmission Limited Partnership on August 28, 2015.
Because EPA received comments on the draft title V permit, it is
effective 30 days after notice of permit issuance, October 2, 2015,
pursuant to 40 CFR 71.11(i)(2).
Dated: September 25, 2015.
Susan Hedman,
Regional Administrator, Region 5.
[FR Doc. 2015-25838 Filed 10-8-15; 8:45 am]
BILLING CODE 6560-50-P