Florida Power and Light Company St. Lucie Plant, Unit 2, 60937 [2015-25696]
Download as PDF
Federal Register / Vol. 80, No. 195 / Thursday, October 8, 2015 / Notices
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–389; NRC–2015–0235]
Florida Power and Light Company St.
Lucie Plant, Unit 2
Nuclear Regulatory
Commission.
ACTION: 10 CFR 2.206 request; receipt.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is giving notice that
by petition dated March 10, 2014, as
supplemented, the Southern Alliance
for Clean Energy (SACE, the petitioner)
has requested that the NRC take
enforcement action with regard to
Florida Power and Light Company (FPL
or the licensee). The petitioner’s
requests are included in the
SUPPLEMENTARY INFORMATION section of
this document.
ADDRESSES: Please refer to Docket ID
NRC–2015–0235 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2015–0235. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email at pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if that document
is available in ADAMS) is provided the
first time that a document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
SUPPLEMENTARY INFORMATION: By letter
dated March 10, 2014 (ADAMS
Accession No. ML14071A431), as
supplemented,1 SACE requested a
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
1 Supplements (ADAMS Accession Nos.
ML14071A431, ML14115A457, ML14115A458,
ML14125A514, ML14128A557, ML14143A412,
ML14147A523, ML14310A811, and
ML14337A792).
VerDate Sep<11>2014
16:41 Oct 07, 2015
Jkt 238001
hearing and that the NRC revoke the
de facto license amendment for the
replacement of the steam generators
(SGs) under section 50.59 of Title 10 of
the Code of Federal Regulations (10
CFR). As the basis for this request, the
petitioner stated that the § 50.59 process
was incorrectly applied and that
replacement of the SGs should have
required a license amendment under 10
CFR 50.90. The petitioner stated
concerns with how the licensee
implemented the § 50.59 process.
However, the Commission, by a
Memorandum and Order (CLI–14–11) 2
dated December 19, 2014, referred the
SACE’s hearing request to the Executive
Director for Operations for disposition
under 10 CFR 2.206.
The request is being treated pursuant
to 10 CFR 2.206 of the NRC’s
regulations. The NRC staff has reviewed
the petition and its supplements and
referred the request to the Director of
the Office of Nuclear Reactor
Regulation. The Director determined
that the petitioner’s request partially
meets the criteria for review under 10
CFR 2.206 and partially meets the
criteria for rejection.
The parts of the petition that met the
criteria for rejection are the SACE’s
concerns related to the inspection of the
replacement SGs, as well as the
concerns regarding the effects of the
extended power uprate on SG tube
inservice inspection and flow-induced
effects on the SG internals. These items
meet one criterion for rejection in
accordance with Management Directive
(MD) 8.11, on the basis that these issues
have already been reviewed, evaluated,
and resolved by the NRC staff. However,
the NRC staff determined that part of the
petition that addresses SACE’s concerns
regarding the licensee’s application of
the § 50.59 process, with respect to the
change in a methodology as described in
the Updated Final Safety Analysis
Report, meets the criteria for review of
a petition under 10 CFR 2.206. The NRC
staff will take appropriate action on this
petition within a reasonable time as
provided by 10 CFR 2.206.
Dated at Rockville, Maryland, this 28th day
of September 2015.
For the Nuclear Regulatory Commission.
William M. Dean,
Director, Office of Nuclear Reactor
Regulation.
[FR Doc. 2015–25696 Filed 10–7–15; 8:45 am]
BILLING CODE 7590–01–P
2 Commission Memorandum and Order dated
December 19, 2014 (ADAMS Accession No.
ML14353A114).
PO 00000
Frm 00066
Fmt 4703
Sfmt 4703
60937
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 052–00025 and 052–00026;
NRC–2008–0252]
Vogtle Electric Generating Plant, Units
3 and 4
Nuclear Regulatory
Commission.
AGENCY:
License amendment application;
opportunity to comment, request a
hearing, and petition for leave to
intervene.
ACTION:
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of an amendment to Combined
Licenses (NPF–91 and NPF–92), issued
to Southern Nuclear Operating
Company, Inc. (SNC), Georgia Power
Company, Oglethorpe Power
Corporation, MEAG Power SPVM, LLC.,
MEAG Power SPVJ, LLC., MEAG Power
SPVP, LLC., and the City of Dalton,
Georgia (together ‘‘the licensees’’), for
construction and operation of the Vogtle
Electric Generating Plant (VEGP), Units
3 and 4, located in Burke County,
Georgia.
SUMMARY:
Submit comments by November
9, 2015. Requests for a hearing or
petition for leave to intervene must be
filed by December 7, 2015.
DATES:
You may submit comments
by any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0252. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: Cindy Bladey,
Office of Administration, Mail Stop:
OWFN–12–H08, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
Ruth C. Reyes, Office of New Reactors,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–000; telephone:
301–415–3249; email: Ruth.Reyes@
nrc.gov.
SUPPLEMENTARY INFORMATION:
E:\FR\FM\08OCN1.SGM
08OCN1
Agencies
[Federal Register Volume 80, Number 195 (Thursday, October 8, 2015)]
[Notices]
[Page 60937]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-25696]
[[Page 60937]]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-389; NRC-2015-0235]
Florida Power and Light Company St. Lucie Plant, Unit 2
AGENCY: Nuclear Regulatory Commission.
ACTION: 10 CFR 2.206 request; receipt.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is giving notice
that by petition dated March 10, 2014, as supplemented, the Southern
Alliance for Clean Energy (SACE, the petitioner) has requested that the
NRC take enforcement action with regard to Florida Power and Light
Company (FPL or the licensee). The petitioner's requests are included
in the SUPPLEMENTARY INFORMATION section of this document.
ADDRESSES: Please refer to Docket ID NRC-2015-0235 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2015-0235. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email at pdr.resource@nrc.gov. The
ADAMS accession number for each document referenced (if that document
is available in ADAMS) is provided the first time that a document is
referenced.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
SUPPLEMENTARY INFORMATION: By letter dated March 10, 2014 (ADAMS
Accession No. ML14071A431), as supplemented,\1\ SACE requested a
hearing and that the NRC revoke the de facto license amendment for the
replacement of the steam generators (SGs) under section 50.59 of Title
10 of the Code of Federal Regulations (10 CFR). As the basis for this
request, the petitioner stated that the Sec. 50.59 process was
incorrectly applied and that replacement of the SGs should have
required a license amendment under 10 CFR 50.90. The petitioner stated
concerns with how the licensee implemented the Sec. 50.59 process.
---------------------------------------------------------------------------
\1\ Supplements (ADAMS Accession Nos. ML14071A431, ML14115A457,
ML14115A458, ML14125A514, ML14128A557, ML14143A412, ML14147A523,
ML14310A811, and ML14337A792).
---------------------------------------------------------------------------
However, the Commission, by a Memorandum and Order (CLI-14-11) \2\
dated December 19, 2014, referred the SACE's hearing request to the
Executive Director for Operations for disposition under 10 CFR 2.206.
---------------------------------------------------------------------------
\2\ Commission Memorandum and Order dated December 19, 2014
(ADAMS Accession No. ML14353A114).
---------------------------------------------------------------------------
The request is being treated pursuant to 10 CFR 2.206 of the NRC's
regulations. The NRC staff has reviewed the petition and its
supplements and referred the request to the Director of the Office of
Nuclear Reactor Regulation. The Director determined that the
petitioner's request partially meets the criteria for review under 10
CFR 2.206 and partially meets the criteria for rejection.
The parts of the petition that met the criteria for rejection are
the SACE's concerns related to the inspection of the replacement SGs,
as well as the concerns regarding the effects of the extended power
uprate on SG tube inservice inspection and flow-induced effects on the
SG internals. These items meet one criterion for rejection in
accordance with Management Directive (MD) 8.11, on the basis that these
issues have already been reviewed, evaluated, and resolved by the NRC
staff. However, the NRC staff determined that part of the petition that
addresses SACE's concerns regarding the licensee's application of the
Sec. 50.59 process, with respect to the change in a methodology as
described in the Updated Final Safety Analysis Report, meets the
criteria for review of a petition under 10 CFR 2.206. The NRC staff
will take appropriate action on this petition within a reasonable time
as provided by 10 CFR 2.206.
Dated at Rockville, Maryland, this 28th day of September 2015.
For the Nuclear Regulatory Commission.
William M. Dean,
Director, Office of Nuclear Reactor Regulation.
[FR Doc. 2015-25696 Filed 10-7-15; 8:45 am]
BILLING CODE 7590-01-P