Duke Energy Carolinas, LLC; Notice of Availability of Draft Environmental Assessment, 60890-60891 [2015-25638]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
60890
Federal Register / Vol. 80, No. 195 / Thursday, October 8, 2015 / Notices
Filed Date: 9/29/15.
Accession Number: 20150929–5111.
Comments Due: 5 p.m. ET 10/20/15.
Docket Numbers: ER15–1861–000.
Applicants: Tucson Electric Power
Company.
Description: Report Filing: Refund
Report to be effective N/A.
Filed Date: 9/29/15.
Accession Number: 20150929–5002.
Comments Due: 5 p.m. ET 10/20/15.
Docket Numbers: ER15–1862–000.
Applicants: Tucson Electric Power
Company.
Description: Report Filing: Refund
Report to be effective N/A.
Filed Date: 9/29/15.
Accession Number: 20150929–5003.
Comments Due: 5 p.m. ET 10/20/15.
Docket Numbers: ER15–2720–001;
ER15–2689–001; ER15–2688–001.
Applicants: WestRock CP, LLC,
MeadWestvaco Coated Board, LLC,
MeadWestvaco Virginia Corporation.
Description: Notice of Non-Material
Change in Status of the WestRock MBR
Sellers.
Filed Date: 9/28/15.
Accession Number: 20150928–5344.
Comments Due: 5 p.m. ET 10/19/15.
Docket Numbers: ER15–2736–000.
Applicants: PJM Interconnection,
L.L.C., Commonwealth Edison
Company.
Description: § 205(d) Rate Filing:
ComEd submits Amended Facilities,
Interconnection, and Easement
Agreement 4266 to be effective 9/28/
2015.
Filed Date: 9/28/15.
Accession Number: 20150928–5305.
Comments Due: 5 p.m. ET 10/19/15.
Docket Numbers: ER15–2737–000.
Applicants: Beethoven Wind, LLC.
Description: Tariff Cancellation:
Notice of cancellation to be effective
9/29/2015.
Filed Date: 9/28/15.
Accession Number: 20150928–5308.
Comments Due: 5 p.m. ET 10/19/15.
Docket Numbers: ER15–2738–000.
Applicants: Sierra Pacific Power
Company.
Description: Initial rate filing: Rate
Schedule No. 68—SPPC Concurrence
with PG&E Service Agreement 84 to be
effective 10/31/2015.
Filed Date: 9/28/15.
Accession Number: 20150928–5310.
Comments Due: 5 p.m. ET 10/19/15.
Docket Numbers: ER15–2739–000.
Applicants: PJM Interconnection,
L.L.C., Trans-Allegheny Interstate Line
Company, West Penn Power Company,
The Potomac Edison Company,
Pennsylvania Electric Company,
Metropolitan Edison Company,
Monongahela Power Company.
VerDate Sep<11>2014
16:41 Oct 07, 2015
Jkt 238001
Description: § 205(d) Rate Filing:
Trans-Allegheny, et al. submits service
agreement nos. 2149, 3743, and 3818 to
be effective 10/1/2015.
Filed Date: 9/29/15.
Accession Number: 20150929–5090.
Comments Due: 5 p.m. ET 10/20/15.
Docket Numbers: ER15–2740–000.
Applicants: Central Hudson Gas &
Electric Corporation.
Description: § 205(d) Rate Filing:
Revision to FERC Rate Schedule 206 to
be effective 7/1/2015.
Filed Date: 9/29/15.
Accession Number: 20150929–5101.
Comments Due: 5 p.m. ET 10/20/15.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES15–66–000.
Applicants: El Paso Electric Company.
Description: Supplement to
September 9, 2015 Application of El
Paso Electric Company for FPA Section
204 authorization.
Filed Date: 9/16/15.
Accession Number: 20150916–5070.
Comments Due: 5 p.m. ET 10/13/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 29, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–25651 Filed 10–7–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2503–154]
Duke Energy Carolinas, LLC; Notice of
Availability of Draft Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for a new license for the KeoweeToxaway Hydroelectric Project, located
on the Toxaway, Keowee, and Little
Rivers in Oconee County and Pickens
County, South Carolina and
Transylvania County, North Carolina,
and has prepared a draft Environmental
Assessment (EA) for the project. The
project does not occupy federal land.
The draft EA contains staff’s analysis
of the potential environmental impacts
of the project and concludes that
relicensing the project, with appropriate
environmental measures, would not
constitute a major federal action that
would significantly affect the quality of
the human environment.
A copy of the draft EA is on file with
the Commission and is available for
public inspection. The draft EA may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. You may also register
online at https://www.ferc.gov/docsfiling/esubscription.asp to be notified
via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice.
Comments may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments.
For assistance, please contact FERC
Online Support. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail
comments to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. The first page of
any filing should include docket
number P–2503–154.
For further information, contact
Rachel McNamara at (202) 502–8340 or
rachel.mcnamara@ferc.gov.
E:\FR\FM\08OCN1.SGM
08OCN1
Federal Register / Vol. 80, No. 195 / Thursday, October 8, 2015 / Notices
Dated: October 1, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–25638 Filed 10–7–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER15–2728–000]
Maricopa West Solar PV, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of
Maricopa West Solar PV, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 19,
2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–25655 Filed 10–7–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD15–34–000]
City of Manitou Springs, Colorado;
Notice of Preliminary Determination of
a Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On September 24, 2015, the City of
Manitou Springs, Colorado, filed a
60891
notice of intent to construct a qualifying
conduit hydropower facility, pursuant
to section 30 of the Federal Power Act
(FPA), as amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Manitou
Springs WTP Hydro Project would have
an installed capacity of 40 kilowatts
(kW), and would be located along an
existing 16-inch-diameter raw water
pipeline supplying water to the city’s
water treatment plant. The project
would be located in the City of Manitou
Springs in El Paso County, Colorado.
Applicant Contact: Jason Wells, City
Administrator, 606 Manitou Ave.,
Manitou Springs, CO 80829, Phone No.
(719) 685–2626.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A proposed
powerhouse, approximately 12.5 feet by
23 feet, adjacent to the existing water
treatment plant building; (2) a short, 6inch-diameter penstock teeing off the
existing 16-inch-diameter raw water
supply pipeline; (3) one vertical in-line
Francis turbine/generator unit with an
installed capacity of 40 kilowatts (kW);
(4) a short, 6-inch-diameter discharge
returning water to the existing 16-inchdiameter raw water pipeline; and (5)
appurtenant facilities.
The proposed project would have a
total installed capacity of 40 kW.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ...................
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume,
ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and
not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a
non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts .........
On or before August 9, 2013, the facility is not licensed, or exempted from the
licensing requirements of Part I of the FPA.
Y
mstockstill on DSK4VPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(i), as amended by HREA ...............
FPA 30(a)(3)(C)(ii), as amended by HREA ..............
FPA 30(a)(3)(C)(iii), as amended by HREA ..............
VerDate Sep<11>2014
16:41 Oct 07, 2015
Jkt 238001
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
E:\FR\FM\08OCN1.SGM
08OCN1
Y
Y
Y
Agencies
[Federal Register Volume 80, Number 195 (Thursday, October 8, 2015)]
[Notices]
[Pages 60890-60891]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-25638]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2503-154]
Duke Energy Carolinas, LLC; Notice of Availability of Draft
Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office
of Energy Projects has reviewed the application for a new license for
the Keowee-Toxaway Hydroelectric Project, located on the Toxaway,
Keowee, and Little Rivers in Oconee County and Pickens County, South
Carolina and Transylvania County, North Carolina, and has prepared a
draft Environmental Assessment (EA) for the project. The project does
not occupy federal land.
The draft EA contains staff's analysis of the potential
environmental impacts of the project and concludes that relicensing the
project, with appropriate environmental measures, would not constitute
a major federal action that would significantly affect the quality of
the human environment.
A copy of the draft EA is on file with the Commission and is
available for public inspection. The draft EA may also be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number, excluding the last three digits in the
docket number field, to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. You may also register online
at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via
email of new filings and issuances related to this or other pending
projects. For assistance, contact FERC Online Support.
Any comments should be filed within 30 days from the date of this
notice. Comments may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments.
For assistance, please contact FERC Online Support. Although the
Commission strongly encourages electronic filing, documents may also be
paper-filed. To paper-file, mail comments to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-2503-154.
For further information, contact Rachel McNamara at (202) 502-8340
or rachel.mcnamara@ferc.gov.
[[Page 60891]]
Dated: October 1, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-25638 Filed 10-7-15; 8:45 am]
BILLING CODE 6717-01-P