Transwestern Pipeline Company, LLC; Notice of Request Under Blanket Authorization, 60892-60893 [2015-25637]

Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES 60892 Federal Register / Vol. 80, No. 195 / Thursday, October 8, 2015 / Notices Preliminary Determination: Based upon the above criteria, Commission staff preliminarily determines that the proposal satisfies the requirements for a qualifying conduit hydropower facility, which is not required to be licensed or exempted from licensing. Comments and Motions to Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is 45 days from the issuance date of this notice. Deadline for filing motions to intervene is 30 days from the issuance date of this notice. Anyone may submit comments or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the ‘‘COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY’’ or ‘‘MOTION TO INTERVENE,’’ as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in 1 18 CFR 385.2001–2005 (2015). VerDate Sep<11>2014 16:41 Oct 07, 2015 Jkt 238001 accordance with 18 CFR 4.34(b) and 385.2010. Locations of Notice of Intent: Copies of the notice of intent can be obtained directly from the applicant or such copies can be viewed and reproduced at the Commission in its Public Reference Room, Room 2A, 888 First Street NE., Washington, DC 20426. The filing may also be viewed on the web at https:// www.ferc.gov/docs-filing/elibrary.asp using the ‘‘eLibrary’’ link. Enter the docket number (i.e., CD15–34) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. Dated: October 1, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–25633 Filed 10–7–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–559–000] Transwestern Pipeline Company, LLC; Notice of Request Under Blanket Authorization Take notice that on September 25, 2015, Transwestern Pipeline Company, LLC (Transwestern), 1300 Main Street, Houston, Texas 77002, filed a prior notice application pursuant to sections 157.205, 157.208, and 157.210 of the Federal Energy Regulatory Commission’s (Commission) regulations under the Natural Gas Act (NGA), and Transwestern’s blanket certificate issued in Docket No. CP82–534–000. Transwestern seeks authorization to: (1) Modify the existing compressor units at its P–1 Compressor Station located in Roosevelt County, New Mexico, and at its P–2 Compressor Station located in Deaf Smith County, Texas; and (2) increase the certificated capacity of its Panhandle Lateral to flow an additional 22,000 million cubic feet per day, all as more fully set forth in the application, which is open to the public for inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 Any questions regarding this application should be directed to Mr. Kelly Allen, Manager, Regulatory Affairs Department, Transwestern Pipeline Company, LLC, 1300 Main Street, Houston, Texas 77002 or phone (713) 989–2606, or fax (713) 989–1205 or by email Kelly.Allen@energytransfer.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenter will E:\FR\FM\08OCN1.SGM 08OCN1 Federal Register / Vol. 80, No. 195 / Thursday, October 8, 2015 / Notices not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: October 2, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–25637 Filed 10–7–15; 8:45 am] BILLING CODE 6717–01–P Dated: October 1, 2015. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FR Doc. 2015–25631 Filed 10–7–15; 8:45 am] [Docket Nos. EL12–101–000; EL14–29–000; EL13–16–000] mstockstill on DSK4VPTVN1PROD with NOTICES New York Association of Public Power v. Niagara Mohawk Power Corporation and New York Independent System Operator, Inc., New York Association of Public Power v. Niagara Mohawk Power Corporation and New York Independent System Operator, Inc., Municipal Electric Utilities Association of New York v. Niagara Mohawk Power Corporation and New York Independent System Operator, Inc.; Notice of Filing Take notice that on September 30, 2015, Niagara Mohawk Power Corporation submitted tariff filing: Refund Report to be effective N/A. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and VerDate Sep<11>2014 16:41 Oct 07, 2015 interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on October 21, 2015. Jkt 238001 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER15–2722–000] Wheelabrator Saugus Inc.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Wheelabrator Saugus Inc.’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is October 19, 2015. PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 60893 The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 29, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–25653 Filed 10–7–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC15–157–000. Applicants: Pennsylvania Electric Company, Metropolitan Edison Company, Jersey Central Power & Light Co., FirstEnergy Transmission, LLC, Mid-Atlantic Interstate Transmission, LL. Description: Response of Pennsylvania Electric Company, et al., to August 28, 2015 Commission letter requesting additional information. Filed Date: 9/28/15. Accession Number: 20150928–5341. Comments Due: 5 p.m. ET 10/19/15. Take notice that the Commission received the following electric rate filings: E:\FR\FM\08OCN1.SGM 08OCN1

Agencies

[Federal Register Volume 80, Number 195 (Thursday, October 8, 2015)]
[Notices]
[Pages 60892-60893]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-25637]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-559-000]


Transwestern Pipeline Company, LLC; Notice of Request Under 
Blanket Authorization

    Take notice that on September 25, 2015, Transwestern Pipeline 
Company, LLC (Transwestern), 1300 Main Street, Houston, Texas 77002, 
filed a prior notice application pursuant to sections 157.205, 157.208, 
and 157.210 of the Federal Energy Regulatory Commission's (Commission) 
regulations under the Natural Gas Act (NGA), and Transwestern's blanket 
certificate issued in Docket No. CP82-534-000. Transwestern seeks 
authorization to: (1) Modify the existing compressor units at its P-1 
Compressor Station located in Roosevelt County, New Mexico, and at its 
P-2 Compressor Station located in Deaf Smith County, Texas; and (2) 
increase the certificated capacity of its Panhandle Lateral to flow an 
additional 22,000 million cubic feet per day, all as more fully set 
forth in the application, which is open to the public for inspection. 
The filing may also be viewed on the web at https://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-
free, (866) 208-3676 or TTY, (202) 502-8659.
    Any questions regarding this application should be directed to Mr. 
Kelly Allen, Manager, Regulatory Affairs Department, Transwestern 
Pipeline Company, LLC, 1300 Main Street, Houston, Texas 77002 or phone 
(713) 989-2606, or fax (713) 989-1205 or by email 
Kelly.Allen@energytransfer.com.
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenter will

[[Page 60893]]

not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.

    Dated: October 2, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-25637 Filed 10-7-15; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.