DBM Pipeline, LLC; Notice of Staff Protest to Proposed Blanket Certificate Activity, 60895 [2015-25634]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 195 / Thursday, October 8, 2015 / Notices
Applicants: Southwest Power Pool,
Inc.
Description: Report Filing: Seams
Transmission Projects-Re-Submission of
Transmittal Letter in ER15–2705 to be
effective N/A.
Filed Date: 10/2/15.
Accession Number: 20151002–5080.
Comments Due: 5 p.m. ET 10/23/15.
Docket Numbers: ER16–3–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc.’s Informational Filing to Notify the
Commission of Implementation of YearFour Reallocation of Revenue
Requirements Pursuant to Attachments J
and O for the Balanced Portfolio.
Filed Date: 10/1/15.
Accession Number: 20151001–5136.
Comments Due: 5 p.m. ET 10/22/15.
Docket Numbers: ER16–11–000.
Applicants: Sierra Pacific Power
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 27—Annual BPA–GTA
Update 2015 to be effective 10/31/2015.
Filed Date: 10/1/15.
Accession Number: 20151001–5407.
Comments Due: 5 p.m. ET 10/22/15.
Docket Numbers: ER16–12–000.
Applicants: LRI Renewable Energy
LLC.
Description: § 205(d) Rate Filing:
Emerald City Amendment to LRI to be
effective 10/2/2015.
Filed Date: 10/2/15.
Accession Number: 20151002–5083.
Comments Due: 5 p.m. ET 10/23/15.
Docket Numbers: ER16–13–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Attach AE Regarding
Annual Auction Revenue Right
Allocation to be effective 1/28/2016.
Filed Date: 10/2/15.
Accession Number: 20151002–5106.
Comments Due: 5 p.m. ET 10/23/15.
Docket Numbers: ER16–14–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2015–10–02_MISO–SPP JOA Section
8.1.2 Amendment M2M to be effective
3/1/2015.
Filed Date: 10/2/15.
Accession Number: 20151002–5124.
Comments Due: 5 p.m. ET 10/23/15.
Docket Numbers: ER16–15–000.
Applicants: R.E. Ginna Nuclear Power
Plant, LLC.
Description: § 205(d) Rate Filing: 2015
normal Oct to be effective 10/2/2015.
Filed Date: 10/2/15.
Accession Number: 20151002–5125.
Comments Due: 5 p.m. ET 10/23/15.
VerDate Sep<11>2014
16:41 Oct 07, 2015
Jkt 238001
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 2, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
60895
historic properties. Mitigation plans do
not comply with the National Historic
Preservation Act under the
Commission’s regulations for blanket
projects. DBM Pipeline must file with
the Commission construction plan to
avoid historic properties (exceed 25 feet
from any of the historic properties). In
addition, DBM Pipeline must file with
the FERC complete responses to the
FERC Environmental Data Request
dated September 23, 2015.
Without this information,
environmental concerns cannot be
adequately addressed within the 30 day
period after the protest deadline.
Dated: October 2, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–25634 Filed 10–7–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[FR Doc. 2015–25616 Filed 10–7–15; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Docket No. CP15–553–000]
DEPARTMENT OF ENERGY
Equitrans, L.P.; Notice of Application
Federal Energy Regulatory
Commission
Take notice that on September 18,
2015, Equitrans, L.P. (‘‘Equitrans’’),
pursuant to section 7(c) of the Federal
Energy Regulatory Commission’s (FERC)
regulations under the Natural Gas Act
(NGA), filed in Docket No. CP15–553–
000, application for all authorizations
necessary for it to restate the certificated
capacities for the Allegheny Valley
Connector (AVC) storage facilities
located in Cambria, Clarion, Allegheny
and Westmoreland Counties,
Pennsylvania to reflect actual
operations. The new collective storage
deliverability will be adjusted to 246
MMcf/d from 260 MMcf/d and the new
working gas capacity will be adjusted to
11.2 Bcf from 15.1 Bcf. The filing may
also be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions concerning this
application may be directed to Matthew
Eggerding, Counsel—Midstream, EQT
Corporation, 625 Liberty Avenue, Suite
1700, Pittsburgh, PA 15222 by calling
(412) 553–5786; by faxing (412) 553–
7781; or by emailing MEggerding@
eqt.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
[Docket No. CP15–537–000]
DBM Pipeline, LLC; Notice of Staff
Protest to Proposed Blanket Certificate
Activity
Commission staff (Protestor) hereby
protests the prior notice request filed
under the provisions of part 157,
subpart F, of the Commission’s
regulations, by DBM Pipeline, LLC
(DBM Pipeline) on July 27, 2015 in the
above referenced docket. Pursuant to its
part 157, subpart F, blanket certificate
authority, DBM Pipeline proposes to
construction and operate approximately
9 miles of 20-inch-diameter pipeline in
Reeves and Culberson Counties, Texas,
and Eddy County, New Mexico.
Protestor seeks to have this prior notice
request processed as a case-specific
application filed under section 7(c) of
the Natural Gas Act and part 157,
subpart A, of the Commission’s
regulations.1
Protestor notes that on September 28,
2015, DBM Pipeline filed a data
response which described a mitigation
plan instead of an avoidance plan for
1 Section 157.205(f) provides that a protested
prior notice filing shall be treated as though it had
filed a case-specific application under National Gas
Act section 7, unless, pursuant to section 157.205(g)
the protestor withdraws its protest within 30 days
after protests were due.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
E:\FR\FM\08OCN1.SGM
08OCN1
Agencies
[Federal Register Volume 80, Number 195 (Thursday, October 8, 2015)]
[Notices]
[Page 60895]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-25634]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP15-537-000]
DBM Pipeline, LLC; Notice of Staff Protest to Proposed Blanket
Certificate Activity
Commission staff (Protestor) hereby protests the prior notice
request filed under the provisions of part 157, subpart F, of the
Commission's regulations, by DBM Pipeline, LLC (DBM Pipeline) on July
27, 2015 in the above referenced docket. Pursuant to its part 157,
subpart F, blanket certificate authority, DBM Pipeline proposes to
construction and operate approximately 9 miles of 20-inch-diameter
pipeline in Reeves and Culberson Counties, Texas, and Eddy County, New
Mexico. Protestor seeks to have this prior notice request processed as
a case-specific application filed under section 7(c) of the Natural Gas
Act and part 157, subpart A, of the Commission's regulations.\1\
---------------------------------------------------------------------------
\1\ Section 157.205(f) provides that a protested prior notice
filing shall be treated as though it had filed a case-specific
application under National Gas Act section 7, unless, pursuant to
section 157.205(g) the protestor withdraws its protest within 30
days after protests were due.
---------------------------------------------------------------------------
Protestor notes that on September 28, 2015, DBM Pipeline filed a
data response which described a mitigation plan instead of an avoidance
plan for historic properties. Mitigation plans do not comply with the
National Historic Preservation Act under the Commission's regulations
for blanket projects. DBM Pipeline must file with the Commission
construction plan to avoid historic properties (exceed 25 feet from any
of the historic properties). In addition, DBM Pipeline must file with
the FERC complete responses to the FERC Environmental Data Request
dated September 23, 2015.
Without this information, environmental concerns cannot be
adequately addressed within the 30 day period after the protest
deadline.
Dated: October 2, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-25634 Filed 10-7-15; 8:45 am]