One-Time Deauthorization of Water Resources Projects, 60647-60657 [2015-25586]
Download as PDF
Federal Register / Vol. 80, No. 194 / Wednesday, October 7, 2015 / Notices
the consumer financial products or
services industry, including regional
trends, concerns, and other relevant
information.’’ 12 U.S.C. 5494.
(a) The purpose of the Board is
outlined in Section 1014(a) of the DoddFrank Act (https://www.sec.gov/about/
laws/wallstreetreform-cpa.pdf), which
states that the Board shall ‘‘advise and
consult with the Bureau in the exercise
of its functions under the Federal
consumer financial laws’’ and ‘‘provide
information on emerging practices in
the consumer financial products or
services industry, including regional
trends, concerns, and other relevant
information.’’ (b) To carry out the
Board’s purpose, the scope of its
activities shall include providing
information, analysis, and
recommendations to the Bureau. The
Board will generally serve as a vehicle
for market intelligence and expertise for
the Bureau. Its objectives will include
identifying and assessing the impact on
consumers and other market
participants of new, emerging, and
changing products, practices, or
services. (c) The Board will also be
available to advise and consult with the
Director and the Bureau on other
matters related to the Bureau’s functions
under the Dodd-Frank Act.
asabaliauskas on DSK5VPTVN1PROD with NOTICES
II. Agenda
The Consumer Advisory Board will
discuss Arbitration, Trends and Themes
in the marketplace, and Reaching
Limited English Speaking Consumers.
Persons who need a reasonable
accommodation to participate should
contact CFPB_504Request@cfpb.gov,
202–435–9EEO, 1–855–233–0362, or
202–435–9742 (TTY) at least ten
business days prior to the meeting or
event to request assistance. The request
must identify the date, time, location,
and title of the meeting or event, the
nature of the assistance requested, and
contact information for the requester.
CFPB will strive to provide, but cannot
guarantee that accommodation will be
provided for late requests.
Individuals who wish to attend the
Consumer Advisory Board meeting must
RSVP to cfpb_cabandcouncilsevents@
cfpb.gov by noon, October 21, 2015.
Members of the public must RSVP by
the due date and must include ‘‘CAB’’
in the subject line of the RSVP.
III. Availability
The Board’s agenda will be made
available to the public on October 7,
2015, via consumerfinance.gov.
Individuals should express in their
RSVP if they require a paper copy of the
agenda.
VerDate Sep<11>2014
18:12 Oct 06, 2015
Jkt 238001
A recording and transcript of this
meeting will be available after the
meeting on the CFPB’s Web site
consumerfinance.gov.
Dated: October 2, 2015.
Christopher D’Angelo,
Chief of Staff, Bureau of Consumer Financial
Protection.
[FR Doc. 2015–25539 Filed 10–6–15; 8:45 am]
BILLING CODE 4810–AM–P
DEPARTMENT OF DEFENSE
Department of the Army, Corps of
Engineers
One-Time Deauthorization of Water
Resources Projects
Army Corps of Engineers, DoD.
Notice of Interim
Deauthorization List.
AGENCY:
ACTION:
The U.S. Army Corps of
Engineers is publishing an Interim
Deauthorization List of water resources
development projects and separable
elements that have been identified for
deauthorization in accordance with
section 6001(c) of the Water Resources
Reform and Development Act of 2014,
Public Law 113–121, 128 STAT. 1346–
1347 (WRRDA 2014), and is soliciting
comments from the public on the list for
90 calendar days. Comments should be
provided to the contact named below by
January 4, 2016.
FOR FURTHER INFORMATION CONTACT: Mr.
Joseph W. Aldridge, Headquarters, U.S.
Army Corps of Engineers, Attention:
CECW–IP, Washington, DC 20314–1000.
Tel. (202) 761–4130 or
joseph.w.aldridge@usace.army.mil.
SUPPLEMENTARY INFORMATION: Interim
Deauthorization List required by
§ 6001(c).
Section 6001(c) provides that the
Secretary shall develop an Interim
Deauthorization List that identifies each
water resources development project, or
separable element of a project, that
meets the following criteria. Projects
and separable elements eligible for
deauthorization are those uncompleted
construction projects and separable
elements meeting all of the following
criteria: (1) They were authorized for
construction before November 8, 2007,
or their most recent modification of the
construction authorization predates
November 8, 2007; (2) their construction
has not been initiated, or, if
construction has been initiated, there
have been no obligations of Federal or
non-federal funds for construction in
the current fiscal year or any of the past
6 fiscal years; and, (3) there has been no
SUMMARY:
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
60647
funding for a post-authorization study
in the current fiscal year or any of the
past 6 fiscal years. As specifically
provided in section 6001(f)(1)(B) of
WRRDA 2014, water resources
development projects include
environmental infrastructure assistance
projects and programs of the U.S. Army
Corps of Engineers. In accordance with
section 103(f) of the Water Resources
Development Act of 1986, separable
elements is defined as ‘‘a portion of a
project—
(1) which is physically separable from
other portions of the project; and
(2) which—
(A) achieves hydrologic effects, or
(B) produces physical or economic
benefits, which are separately
identifiable from those produced by
other portions of the project.’’
The following elements of an
authorized water resources development
project also qualify as separable
elements: An element for which there is
an executed design agreement or project
partnership agreement specific to that
element; an element that has received
funding specified for that element; an
element that was authorized separately
from or as an amendment to the
authorization for the remainder of the
water resources development project,
that was separately identified in the
authorization for the water resources
development project, or for which a
statute specifies an authorized cost,
estimated cost, or amount authorized to
be appropriated; an element that has
been placed in service or for which the
Government or the non-federal partner
has assumed operation and
maintenance; an element that has been
deauthorized; or the remaining portion
of the water resources development
project apart from other separable
elements. Following a 90-day public
review period of the Interim
Deauthorization List, the Assistant
Secretary of the Army for Civil Works
(ASA(CW)) will publish a Final
Deauthorization List in the Federal
Register. Section 6001(d)(2)(A) of
WRRDA 2014 requires that the Secretary
shall include on the Final
Deauthorization List projects and
separable elements of projects that have,
in the aggregate, an estimated Federal
cost to complete that is at least $18
billion. The ASA(CW) has strived to
meet the requirements of Section 6001,
but was not able to identify projects that
totaled $18 billion.
The projects and elements on the
Final Deauthorization List will be
deauthorized automatically after 180
days following the date that the
ASA(CW) submits the Final
Deauthorization List to Congress, unless
E:\FR\FM\07OCN1.SGM
07OCN1
60648
Federal Register / Vol. 80, No. 194 / Wednesday, October 7, 2015 / Notices
asabaliauskas on DSK5VPTVN1PROD with NOTICES
the Congress passes a joint resolution
disapproving the Final Deauthorization
List or the non-Federal interest for the
project or separable element of the
project provides sufficient funds to
complete the project or separable
element. The amount shown as the
VerDate Sep<11>2014
18:12 Oct 06, 2015
Jkt 238001
Federal Balance to complete is a
working estimate generally based on the
authorization and as such any nonFederal interests considering providing
sufficient funds to complete a project or
separable element should contact the
appropriate District Commander to
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
discuss the process necessary to develop
a final cost to complete a project or
separable element.
The Interim Deauthorization List
follows below in Table 1.
E:\FR\FM\07OCN1.SGM
07OCN1
VerDate Sep<11>2014
NAV ........
Business
line
18:12 Oct 06, 2015
Jkt 238001
FRM .......
AR ..........
AR ..........
FRM .......
EI ............
AL ...........
PO 00000
EI ............
AR ..........
Frm 00039
EI ............
CA ..........
Fmt 4703
EI ............
CA ..........
Sfmt 4703
E:\FR\FM\07OCN1.SGM
FRM .......
EI ............
CA ..........
CA ..........
CA ..........
FRM .......
EI ............
CA ..........
EI ............
EI ............
EI ............
CA ..........
EI ............
CA ..........
FRM .......
CA ..........
EI ............
AR ..........
AER ........
AR ..........
EI ............
AL ...........
State
CA ..........
CA ..........
CA ..........
Corps
district
07OCN1
SPL ........
SPL ........
SPL ........
SPL ........
SPL ........
SPL ........
SPL ........
SPL ........
SPK ........
SPK ........
SPK ........
SPK ........
SWL .......
SWL .......
SWL .......
MVM .......
MVK .......
SAM .......
SAM .......
asabaliauskas on DSK5VPTVN1PROD with NOTICES
CA 26, 27 & 29 ...........
CA 52 ..........................
CA 26, 27 & 29 ...........
CA 24 ..........................
CA 44 ..........................
CA 24 ..........................
CA 39 & 45 .................
CA 39 ..........................
CA 21 ..........................
CA 3 ............................
CA 3 & 5 .....................
CA 4 ............................
AR 3 ............................
AR 3 ............................
AR 1, 2, 3 & 4; OK 1 ..
AR 1 ............................
AR 4 ............................
AL 4 ............................
AL 2, 3 & 4 .................
Congressional districts
EASTERN MUNICIPAL
WATER DISTRICT,
CA.
GOLETA & VICINITY,
CA.
LOS ANGELES HARBOR/TERMINAL ISLAND, CA.
LOWER MISSION
CREEK, CA.
SAN DIEGO AREA
WATER REUSE
DEMOSTRATION
FACILITIES, CA.
SAN DIEGO COUNTY,
CA (CORONADO
TRANSBAY
WASTEWATER
PIPELINE).
SOUTHERN CALIFORNIA COMPREHENSIVE
WATER REUSE
SYSTEM, CA.
CHINO HILLS, CA ......
L’ANGUILLE RIVER
BASIN, AR.
ARKANSAS RIVER
LEVEES, AR.
BEAVER DAM , AR
(TROUT PRODUCTION CENTER).
BEAVER LAKE, BENTON/WASH, AR.
CALAVERAS COUNTY, CA.
CLEAR LAKE BASIN,
CA.
COLUSA TROUGH
DRAINAGE CANAL,
SACRAMENTO
RIVER AND TRIBUTARIES, CA.
PINE FLAT DAM, CA
UNION COUNTY, AR
ALABAMA–COOSA
RIVER AND TRIBUTARIES, AL
(COOSA RIVER BETWEEN MONTGOMERY AND
GADSDEN).
DUCK RIVER, AL .......
Project/element name
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
SEPARABLE ELEMENT.
PROJECT ...................
SEPARABLE ELEMENT.
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
Project/element type (1)
102–580
106–554
102–580
100–676
106–554
102–580
106–554
106–554
106–541
99–662
106–554
104–303
104–303
94–587
101–640
99–662
106–554
106–554
99–662
Public law of
authorization
or latest
amendment
217c(1) .....
108d .........
217c(2) .....
3a .............
108d .........
102b .........
108a .........
108a .........
101b(7) .....
830 ...........
108a .........
526 ...........
523 ...........
105 ...........
110(a1) .....
103 ...........
108d .........
108a .........
813 ...........
Section of
public law
TABLE 1 (INTERIM DEAUTHORIZATION LIST)
.......
NOT
NOT
NOT
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
CONSTRUCTION
PAUSED.
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
CONSTRUCTION
PAUSED.
NEVER FUNDED .......
NEVER FUNDED .......
CONSTRUCTION
INITIATED.
CONSTRUCTION
INITIATED.
CONSTRUCTION
INITIATED.
NEVER FUNDED
CONSTRUCTION NOT
INITIATED.
Project/element phase
and status (2)
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
1984 ............................
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
2002 ............................
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
2004 ............................
NO OBLIGATION FOR
CONSTRUCTION.
2008 ............................
1986 ............................
Latest fiscal year of
federal or non–federal
obligations
for construction
5,000,000
10,000,000
5,000,000
14,625,971
6,500,000
1,233,626
1,543,324
1,543,324
41,502,918
18,900,846
1,543,324
1,500,000
5,000,000
5,990,000
591,605
19,466,768
51,247,100
5,000,000
$3,781,921,691
Federal balance to
complete (subject
to Section 902
where applicable)
Federal Register / Vol. 80, No. 194 / Wednesday, October 7, 2015 / Notices
60649
VerDate Sep<11>2014
EI ............
Business
line
18:12 Oct 06, 2015
CT ..........
Jkt 238001
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
E:\FR\FM\07OCN1.SGM
AER ........
AER ........
AER ........
AER ........
EI ............
AER ........
NAV ........
FL ...........
FL ...........
FL ...........
FL ...........
DC & MD
AER ........
EI ............
CT ..........
CT, ME,
MA,
NH, RI
& VT.
EI ............
CT ..........
State
FL ...........
FL ...........
Corps
district
07OCN1
SAJ ........
SAJ ........
SAJ ........
SAJ ........
SAJ ........
SAJ ........
NAB ........
NAE ........
NAE ........
NAE ........
NAE ........
asabaliauskas on DSK5VPTVN1PROD with NOTICES
FL 12 ...........................
FL 17, 18, 20, 21, 22,
23, 25, 26 & 27.
FL 16 & 23 ..................
FL 18, 20, 21, 22, 23,
24, 25, 26 & 27.
FL 17, 18, 20, 21, 22,
23, 25, 26 & 27.
FL 17, 18, 19, 20, 21,
22 & 23.
.....................................
CT 1, 2, 3, 4 & 5; ME
1, & 2; MA 1, 2, 3, 4,
5, 6, 7, 8, & 9; NH 1
& 2; RI 1 & 2; VT AT
LARGE.
CT 3 ............................
CT 1 ............................
CT 4 ............................
Congressional districts
NEW ENGLAND
WATER RESOURCES AND
ECOSYSTEM RESTORATION, CT, ME,
MA, NH, RI & VT.
WASHINGTON DC
AND MARYLAND,
D.C. & MD.
COMPREHENSIVE
EVERGLADES RESTORATION PLAN,
FL (LAKE BELT
GROUND RESERVOIR TECHNOLOGY).
COMPREHENSIVE
EVERGLADES RESTORATION PLAN,
FL (NORTH NEW
RIVER IMPROVEMENTS).
COMPREHENSIVE
EVERGLADES RESTORATION PLAN,
FL (RAISE AND
BRIDGE EAST
PORTION OF
TAMIAMI TRAIL
AND FILL MIAMI
CANAL WITHIN
WATER)
(CONSEVATION
AREA 3).
COMPREHENSIVE
EVERGLADES RESTORATION PLAN,
FL (TAYLOR
CREEK/NUBBIN
SLOUGH STORAGE
AND TREATMENT
AREA).
COMPREHENSIVE
EVERGLADES RESTORATION PLAN,
FL (WASTEWATER
REUSE TECHNOLOGY).
HUDSON RIVER, FL ..
NEW HAVEN, CT .......
BRIDGEPORT COMBINED SEWER
OVERFLOW
PTOJECT, CT.
HARTFORD, CT .........
Project/element name
PROJECT ...................
SEPARABLE ELEMENT.
SEPARABLE ELEMENT.
SEPARABLE ELEMENT.
SEPARABLE ELEMENT.
SEPARABLE ELEMENT.
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
Project/element type (1)
81–516
106–541
106–541
106–541
106–541
106–541
106–554
106–541
106–53
106–53
106–53
Public law of
authorization
or latest
amendment
101 ...........
601 b2biiii
601 b2cvii
601 b2cviii
601 b2cix
601 b2biiii
108d .........
507 ...........
502b .........
502b .........
502b .........
Section of
public law
TABLE 1 (INTERIM DEAUTHORIZATION LIST)—Continued
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
CONSTRUCTION NOT
INITIATED.
NEVER FUNDED .......
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
CONSTRUCTION NOT
INITIATED.
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
Project/element phase
and status (2)
NO OBLIGATION FOR
CONSTRUCTION.
2005 ............................
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
2005 ............................
1998 ............................
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
Latest fiscal year of
federal or non–federal
obligations
for construction
3,650,000
20,500,000
67,800,000
21,500,000
67,150,000
17,000,000
14,807,000
(3)0
10,000,000
10,000,000
10,000,000
Federal balance to
complete (subject
to Section 902
where applicable)
60650
Federal Register / Vol. 80, No. 194 / Wednesday, October 7, 2015 / Notices
EI ............
VerDate Sep<11>2014
18:12 Oct 06, 2015
NAV ........
NAV ........
FL ...........
FL ...........
FL ...........
Jkt 238001
EI ............
PO 00000
EI ............
IL ............
Frm 00041
Fmt 4703
AER ........
KY ..........
KY & TN
FRM .......
FRM .......
IN ...........
FRM .......
FRM .......
NAV ........
EI ............
EI ............
EI ............
FRM .......
EI ............
LA ...........
EI ............
IN ...........
FRM .......
IL ............
FRM .......
EI ............
FL ...........
HI ...........
FRM .......
FL ...........
LA ...........
Sfmt 4703
LA ...........
LA ...........
LA ...........
E:\FR\FM\07OCN1.SGM
LA ...........
LA ...........
07OCN1
LA ...........
MA ..........
NAE ........
MVN .......
MVN .......
MVN .......
MVN .......
MVN .......
MVN .......
MVN .......
MVK .......
MVM .......
LRH ........
LRL ........
LRE ........
LRC ........
LRC ........
POH .......
SAJ ........
SAJ ........
SAJ ........
SAJ ........
SAJ ........
asabaliauskas on DSK5VPTVN1PROD with NOTICES
MA 9 ...........................
LA 1 ............................
LA 2 & 6 ......................
LA 1 & 2 ......................
LA 1 & 2 ......................
LA 1, 2, 3 & 6 .............
LA 6 ............................
LA 1, 2 & 6 .................
LA 1 ............................
TN 8; KY 1 ..................
KY 5 ............................
IN 7 .............................
IN 3 .............................
IL 9, 10 & 14 ...............
IL 11 & 14 ...................
HI 1 .............................
FL 10, 11, 12 & 13 .....
FL 10, 11, 12 & 13 .....
FL 14 ...........................
FL 14 ...........................
FL 27 ...........................
ST. CHARLES, ST.
BERNARD, AND
PLAQUEMINES
PARISHES, LA.
ST. JOHN THE BAPTIST AND ST.
JAMES PARISHES,
LA.
TANGIPAHOA,
TCHEFUNCTE, AND
TICKFAW RIVERS,
LA.
FALL RIVER AND
NEW BEDFORD,
MA.
BEAVER CREEK
BASIN, KY.
REELFOOT LAKE, TN
& KY.
PEARL RIVER, SLIDELL, SAINT TAMMANY PARISH, LA.
AMITE RIVER AND
TRIBUTARIES, LA.
BAYOU COCODRIE
AND TRIBUTARIES,
LA.
GULF INTRACOASTAL WATERWAY, LA–TX SECTION, LA & TX.
KENNER, LA ..............
INDIANAPOLIS, IN .....
DES PLAINES RIVER,
IL (NORTH FORK
MILL CREEK DAM
MODIFICATION).
FORT WAYNE, IN ......
TAMPA HARBOR,
ALAFIA RIVER, FL.
TAMPA HARBOR, FL
((PORT SUTTON
TURNING BASIN)
WIDENING TO AN
ADDITIONAL 105
FEET TO THE
FENDER LINE
ALONG PENDOLA
POINT).
WAIKIKI EROSION
CONTROL, HI.
AURORA, IL ...............
LITTLE TALBOT ISLAND, FL.
SOUTH TAMPA, FL ...
KEY BISCAYNE, FL ...
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
SEPARABLE ELEMENT.
PROJECT ...................
PROJECT ...................
SEPARABLE ELEMENT.
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
106–554
99–662
106–554
106–554
106–554
87–874
93–251
102–580
99–662
106–53
89–298
106–554
106–554
106–53
106–554
89–298
99–662
106–554
106–554
106–53
106–554
108c .........
401 ...........
108a .........
108a .........
108 ...........
101 ...........
87 .............
101(11) .....
401b .........
101b11 .....
204 ...........
108a .........
108a .........
101b10 .....
108d .........
301 ...........
858 ...........
107 ...........
108a .........
101b7 .......
108a .........
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
CONSTRUCTION
PAUSED.
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
NEVER FUNDED .......
CONSTRUCTION
PAUSED.
NEVER FUNDED .......
NEVER FUNDED .......
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
1987 ............................
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
2002 ............................
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
2006 ............................
NO OBLIGATION FOR
CONSTRUCTION.
2000 ............................
35,000,000
21,723,000
1,543,324
1,543,324
5,000,000
201,422,000
345,472,000
38,058,405
29,311,000
33,072,769
20,873,500
1,543,324
1,529,324
5,795,400
8,000,000
16,584,000
8,434,881
64,771,847
1,543,324
6,786,030
1,543,324
Federal Register / Vol. 80, No. 194 / Wednesday, October 7, 2015 / Notices
60651
VerDate Sep<11>2014
FRM .......
Business
line
18:12 Oct 06, 2015
Jkt 238001
MI ...........
PO 00000
NAV ........
Frm 00042
Fmt 4703
MI ...........
Sfmt 4703
FRM .......
E:\FR\FM\07OCN1.SGM
NAV ........
MI ...........
NAV ........
EI ............
EI ............
NAV ........
EI ............
MI, MN &
WI.
FRM .......
MI ...........
FRM .......
FRM .......
MI ...........
MI ...........
NAV ........
MI ...........
EI ............
NAV ........
MI ...........
MI ...........
NAV ........
MA ..........
State
MN .........
MN .........
MN .........
MN & WI
MO .........
Corps
district
07OCN1
NWK .......
LRE ........
MVP .......
LRE ........
LRE ........
LRE ........
LRE ........
LRE ........
LRE ........
LRE ........
LRE ........
LRE ........
LRE ........
LRE ........
LRE ........
NAE ........
asabaliauskas on DSK5VPTVN1PROD with NOTICES
MO 4 & 6 ....................
MN 8; WI 7 .................
MN 5 ...........................
MN 8 ...........................
MN 8 ...........................
MI 1; MN 8; WI 7 ........
MI 4 & 5 ......................
MI 5 .............................
MI 4 & 5 ......................
MI 5 .............................
MI 1 .............................
MI 1 .............................
MI 6 .............................
MI 5 .............................
MI 1 .............................
MA 4, 7 & 8 ................
Congressional districts
BENTON HARBOR,
ST JOSEPH
WASTEWATER
TREATMENT
PLANT, ST JOSEPH, MI.
CHARLEVOIX, MI
(REVETMENT CONNECTION).
ONTONAGON HARBOR, ONTONAGON
COUNTY MI.
SAGINAW RIVER
AND TRIBUTARIES,
MI (CASS RIVER AT
VASSAR).
SAGINAW RIVER
AND TRIBUTARIES,
MI (CURTIS ROAD
BRIDGE).
SAGINAW RIVER
AND TRIBUTARIES,
MI (FLINT RIVER
AT FLINT).
SAGINAW RIVER
AND TRIBUTARIES,
MI (SHIAWASSEE
FLATS).
GREAT LAKES CONNECTING CHANNELS & HARBORS,
MN, MI & WI.
DULUTH, MN (ALTERNATIVE TECHNOLOGY
PROJECT).
LAKE SUPERIOR
CENTER, MN.
MISSISSIPPI PLACE,
MN.
DULUTH—SUPERIOR
CHANNEL EXTENSION, MN & WI.
KANSAS CITY, MO ....
MUDDY RIVER,
BROOKLINE AND
BOSTON, MA
(AQUATIC ECOSYSTEM RESTORATION FEATURES).
ALPENA HARBOR, MI
(25 FOOT CHANNEL).
BAY CITY, MI .............
Project/element name
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
SEPARABLE ELEMENT.
SEPARABLE ELEMENT.
SEPARABLE ELEMENT.
SEPARABLE ELEMENT.
PROJECT ...................
SEPARABLE ELEMENT.
PROJECT ...................
PROJECT ...................
PROJECT ...................
SEPARABLE ELEMENT.
Project/element type (1)
106–53
99–662
106–53
104–303
104–303
101–640
106–53
104–303
99–662
106–53
104–303
106–53
106–554
101–640
104–303
106–541
Public law of
authorization
or latest
amendment
502b .........
201a .........
577 ...........
542 ...........
541a/b ......
101a15 .....
364(4) .......
329 ...........
845 ...........
364(3) .......
363e .........
373 ...........
108d .........
105 ...........
363d .........
522 ...........
Section of
public law
TABLE 1 (INTERIM DEAUTHORIZATION LIST)—Continued
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
CONSTRUCTION
PAUSED.
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
Project/element phase
and status (2)
NO OBLIGATION FOR
CONSTRUCTION.
1995 ............................
NO OBLIGATION FOR
CONSTRUCTION.
2006 ............................
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
Latest fiscal year of
federal or non–federal
obligations
for construction
15,000,000
14,064,481
2,968,178
10,000,000
1,000,000
17,938,174
106,825,583
571,781
720,653
13,909,394
37,134,623
52,500
1,500,000
8,466,275
4,063,120
24,050,000
Federal balance to
complete (subject
to Section 902
where applicable)
60652
Federal Register / Vol. 80, No. 194 / Wednesday, October 7, 2015 / Notices
NAV ........
VerDate Sep<11>2014
MS ..........
AER ........
NAV ........
MS ..........
18:12 Oct 06, 2015
NC ..........
FRM .......
EI ............
NC ..........
Jkt 238001
EI ............
NH ..........
PO 00000
EI ............
NJ ...........
Frm 00043
Fmt 4703
EI ............
Sfmt 4703
E:\FR\FM\07OCN1.SGM
EI ............
EI ............
NV ..........
NY ..........
NY ..........
EI ............
FRM .......
NV ..........
EI ............
EI ............
EI ............
FRM .......
EI ............
NY ..........
FRM .......
NJ ...........
EI ............
NJ ...........
NJ ...........
EI ............
NJ ...........
EI ............
NH ..........
EI ............
NC & SC
EI ............
MS & LA
FRM .......
MO & IL
NY ..........
07OCN1
NY ..........
NY ..........
NY ..........
NY ..........
NAN .......
NAN .......
NAN .......
LRB ........
LRB ........
LRB ........
LRB ........
LRB ........
SPL ........
SPL ........
NAP ........
NAP ........
NAN .......
NAN .......
NAN .......
NAE ........
NAE ........
SAW .......
SAW .......
SAW .......
MVN .......
MVK .......
MVK .......
MVS .......
asabaliauskas on DSK5VPTVN1PROD with NOTICES
NY 6 & 11 ...................
NY 17, 18, 19 & 20 .....
NY 10 & 11; NJ 8 .......
NY 24 ..........................
NY26 & 27 ..................
NY 26 & 27 .................
NY 26 & 27 .................
NY26 & 27 ..................
NV 4 ............................
NV 4 ............................
NJ 5 ............................
NJ 4, 6 & 12 ...............
NJ 9 ............................
NJ 8 ............................
NJ 8 ............................
NH 1 ............................
NH 2 ............................
NC 9 & 12 ...................
NC 8 & 9 .....................
NC 8 ............................
LA 2 ............................
MS 2 ...........................
MO 1, 2, 3, & 8; IL 12
& 13.
MS 2 ...........................
INNER HARBOR
PROJECT, NEW
YORK, NY.
LOWER HUDSON
RIVER & TRIBUTARIES, NY.
OUTER HARBOR
PROJECT, NEW
YORK, NY.
ERIE COUNTY, BUFFALO AMHRST, NY.
ERIE COUNTY, NY
(SLUDGE DISPOSAL).
ERIE COUNTY, NY
(WATER QUALITY
TUNNEL).
LEWISTON
STORMWATER, NY.
LIVERPOOL, NY ........
PATTERSON AND
PASSAIC COUNTY,
NJ.
STATE OF NEW JERSEY AND NEW
JERSEY WASTEWATER TREATMENT TRUST, NJ.
TOWN OF NEWTON,
NJ.
LAS VEGAS WASH
AND TRIBUTARIES,
NV.
LAS VEGAS, NV ........
NORTH HUDSON, NJ
ELIZABETH, NJ ..........
SUGAR CREEK
BASIN, NC & SC.
NASHUA, NH (COMBINED SEWER
OVERFLOW).
ROCHESTER, NH ......
UNION COUNTY, NC
ST LOUIS HARBOR,
MO & IL.
YAZOO BASIN, TRIBUTARIES, MS.
YAZOO RIVER, MS
(SHEPARDSTOWN
BRIDGE).
MISSISSIPPI AND
LOUISIANA ESTUARINE AREAS, MS &
LA.
LUMBERTON, NC ......
PROJECT ...................
PROJECT ...................
PROJECT ...................
SEPARABLE ELEMENT.
PROJECT ...................
PROJECT ...................
SEPARABLE ELEMENT.
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
SEPARABLE ELEMENT.
PROJECT ...................
PROJECT ...................
106–53
106–53
106–53
106–554
102–580
102–580
102–580
102–580
109–103
102–580
106–554
102–580
106–554
106–53
106–53
104–303
106–53
99–662
106–554
106–53
100–676
99–662
89–298
99–662
502(f) ........
212e .........
502(f) ........
108d .........
222 ...........
219c (11) ..
219c (12) ..
221 ...........
115 ...........
101(13) .....
108d .........
219c (10) ..
108c .........
502(f) ........
502(f) ........
504(e) (4)
502b .........
401a .........
108a .........
502b .........
3(a)8 .........
822 ...........
204 ...........
601a .........
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
CONSTRUCTION
PAUSED.
NEVER FUNDED .......
NEVER FUNDED .......
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
2003 ............................
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
2007 ............................
15,000,000
30,000,000
15,000,000
2,000,000
200,000
1,543,324
1,543,324
7,000,000
20,000,000
3,360,938
7,000,000
1,543,324
30,000,000
20,000,000
20,000,000
10,897,120
19,853,000
54,523,100
1,543,324
1,700,000
70,668,540
2,011,094
233,490,728
43,253,100
Federal Register / Vol. 80, No. 194 / Wednesday, October 7, 2015 / Notices
60653
VerDate Sep<11>2014
NAV ........
Business
line
18:12 Oct 06, 2015
OH ..........
FRM .......
FRM .......
OH ..........
Jkt 238001
PO 00000
OR ..........
EI ............
EI ............
OK ..........
Frm 00044
Fmt 4703
Sfmt 4703
E:\FR\FM\07OCN1.SGM
EI ............
EI ............
EI ............
EI ............
EI ............
EI ............
EI ............
OR ..........
PA ..........
PA ..........
PA ..........
PA ..........
PA ..........
PA ..........
PA ..........
EI ............
EI ............
OR ..........
EI ............
EI ............
EI ............
EI ............
EI ............
PA ..........
EI ............
OR ..........
HYD .......
OH ..........
NAV ........
NY/NJ .....
State
PA ..........
PA ..........
PA ..........
PA ..........
PA ..........
Corps
district
07OCN1
NAB ........
NAB ........
NAB ........
NAB ........
LRP ........
LRP ........
LRP ........
LRP ........
LRP ........
LRP ........
LRP ........
LRP ........
LRP ........
NWP .......
NWP .......
NWP .......
NWP .......
SWT .......
LRL ........
LRH ........
LRB ........
NAN .......
asabaliauskas on DSK5VPTVN1PROD with NOTICES
PA 4 ............................
PA 4 ............................
PA 11 & 15 .................
PA 10 ..........................
PA 9, 12, 14 & 18 .......
PA 3 ............................
PA 14 ..........................
PA 18 ..........................
PA 18 ..........................
PA 9 ............................
PA 9 ............................
PA 18 ..........................
PA 5 ............................
OR 1 & 2 .....................
OR 2 ...........................
OR 2 ...........................
OR 1 ...........................
OK 2 ............................
OH 8 ...........................
OH 15 .........................
OH 9 ...........................
NJ 6, 9 & 13; NY 7, 8,
9, 12, 13,14 & 15.
Congressional districts
WASHINGTON,
GREENE, WESTMORELAND, AND
FAYETTE COUNTIES, PA.
BRADFORD AND
SULLIVAN COUNTIES, PA.
DAUPHIN COUNTY,
PA.
DILLSBURG BOROUGH AUTHORITY,
PA.
HAMPDEN TOWNSHIP, PA.
FINDLAY TOWNSHIP,
PA.
GREENSBORO AND
GLASSWORKS, PA.
JEFFERSON TOWNSHIP, GREENE
COUNTY, PA.
NORTH FAYETTE
TOWNSHIP, ALLEGHENY COUNTY,
PA.
ROBINSON TOWNSHIP, PA.
SPRINGDALE BOROUGH, PA.
TITUSVILLE, PA .........
COUDERSPORT, PA
PORTLAND, OR .........
MEDFORD, OR ..........
HOOD RIVER, OR .....
NEW YORK HARBOR
COLLECTION AND
REMOVAL OF
DRIFT, NY & NJ.
OTTAWA RIVER HARBOR, OH.
HOCKING RIVER,
LOGAN, OH.
MIAMI RIVER BASIN,
PLEASANT RUN,
VICINITY FAIRFIELD, OH.
FORT GIBSON LAKE,
OK (POWER UNITS
5 & 6).
ASTORIA, OR .............
Project/element name
PROJECT ...................
PROJECT ...................
PROJECT ...................
SEPARABLE ELEMENT.
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
SEPARABLE ELEMENT.
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
Project/element type (1)
106–53
106–53
106–53
106–53
106–554
106–554
106–53
106–53
106–53
106–53
102–580
106–53
106–554
106–554
106–554
106–554
106–53
99–662
99–662
99–662
101–640
101–640
Public law of
authorization
or latest
amendment
502b .........
502b .........
502b .........
548 ...........
108 ...........
108 ...........
502 ...........
502 ...........
502 ...........
502 ...........
219c(15) ...
502 ...........
108 ...........
108a (38)
108a (37)
108a (36)
502b .........
601a .........
401a .........
401a .........
107a7 .......
102 ...........
Section of
public law
TABLE 1 (INTERIM DEAUTHORIZATION LIST)—Continued
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
CONSTRUCTION NOT
INITIATED.
NEVER FUNDED .......
CONSTRUCTION
PAUSED.
Project/element phase
and status (2)
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
2006 ............................
2005 ............................
Latest fiscal year of
federal or non–federal
obligations
for construction
3,000,000
2,000,000
2,000,000
13,000,000
8,000,000
7,300,000
500,000
1,200,000
500,000
1,000,000
1,543,324
11,000,000
1,543,324
1,543,324
1,543,324
1,543,324
5,000,000
45,485,000
18,041,480
16,282,709
13,218,200
201,549,768
Federal balance to
complete (subject
to Section 902
where applicable)
60654
Federal Register / Vol. 80, No. 194 / Wednesday, October 7, 2015 / Notices
EI ............
VerDate Sep<11>2014
18:12 Oct 06, 2015
FRM .......
FRM .......
PA ..........
PA ..........
PA ..........
FRM .......
EI ............
PA ..........
Jkt 238001
EI ............
PA ..........
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
FRM .......
EI ............
EI ............
EI ............
PR ..........
PR ..........
RI ...........
RI ...........
SC ..........
NAV ........
FRM .......
PA ..........
E:\FR\FM\07OCN1.SGM
TX ..........
FRM .......
FRM .......
TN ..........
NAV ........
FRM .......
FRM .......
TX ..........
FRM .......
TN ..........
EI ............
PA ..........
FRM .......
PA ..........
EI ............
PA ..........
TX ..........
07OCN1
TX ..........
TX ..........
SWG ......
SWF .......
SWF .......
SWF .......
SWF .......
MVM .......
MVM .......
SAC ........
NAE ........
NAE ........
SAJ ........
SAJ ........
NAP ........
NAP ........
NAP ........
NAP ........
NAP ........
NAP ........
NAB ........
NAB ........
NAB ........
asabaliauskas on DSK5VPTVN1PROD with NOTICES
TX 2, 7, 8, 10, 18 & 29
TX 2, 8 & 14 ...............
TX 2, 8 & 14 ...............
TX 2, 8 & 14 ...............
TX 8 & 17 ...................
TN 8 ............................
TN 9 ............................
SC 1 ............................
RI 1 & 2 ......................
RI 2 .............................
PR AT LARGE ............
PR AT LARGE ............
PA 8 ............................
PA 6 ............................
PA 2 & 3 .....................
PA 1, 2, 3 & 13 ...........
PA 2 & 3 .....................
PA 17 ..........................
PA 4 ............................
PA 5 ............................
PA 4 & 11 ...................
MEMPHIS HARBOR,
MEMPHIS, TN.
NONCONNAH
CREEK, TN & MS
(EXTENSION).
NAVASOTA RIVER
BASIN, TX
(MILLICAN LAKE,
TX).
TRINITY RIVER AND
TRIBUTARIES, TX
(LIBERTY LOCAL
PROTECTION
PROJECT).
TRINITY RIVER AND
TRIBUTARIES, TX
(NAVIGATION
CHANNEL ABOVE
LIBERTY).
TRINITY RIVER AND
TRIBUTARIES, TX
(WEST FORK
FLOODWAY).
BUFFALO BAYOU
AND TRIBUTARIES,
TX (HALLS BAYOU).
DREDGING OF SALT
PONDS IN THE
STATE OF RHODE
ISLAND, RI.
CHARLESTON, SC ....
MOUNT JOY TOWNSHIP AND
CONEWAGO
TOWNSHIP, PA.
PATTON TOWNSHIP,
PA.
UPPER ALLEN
TOWNSHIP, PA.
DELAWARE RIVER
BASIN—WABASH
CREEK, BOROUGH
OF TAMAQUA, PA.
PHILADELPHIA, PA
(FRANKFORD DAM).
PHILADELPHIA, PA
(PENNYPACK
PARK).
PHILADELPHIA, PA
(WATER WORKS
RESTORATION).
PHOENIXVILLE BOROUGH, CHESTER
COUNTY, PA.
TOWAMENCIN
TOWNSHIP, PA.
GUANAJIBO RIVER,
PR.
RIO NIGUA AT SALINAS, PR.
CRANSTON, RI ..........
SEPARABLE ELEMENT.
SEPARABLE ELEMENT.
SEPARABLE ELEMENT.
SEPARABLE ELEMENT.
SEPARABLE ELEMENT.
SEPARABLE ELEMENT.
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
101–640
108–447
108–447
108–447
90–483
106–541
106–53
108–137
106–53
101–640
106–53
106–53
106–53
106–554
104–303
104–303
104–303
93–251
106–53
106–53
106–554
101(21) .....
116 ...........
116 ...........
116 ...........
203 ...........
334 ...........
364 ...........
127 ...........
578 ...........
54 .............
101 ...........
101 ...........
502b .........
108d .........
564a .........
564d .........
564e .........
2 ...............
502b .........
502b .........
108d .........
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
CONSTRUCTION NOT
INITIATED.
CONSTRUCTION NOT
INITIATED.
CONSTRUCTION NOT
INITIATED.
CONSTRUCTION NOT
INITIATED.
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NO OBLIGATION FOR
CONSTRUCTION.
1981 ............................
1981 ............................
1981 ............................
1983 ............................
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
2004 ............................
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
2005 ............................
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
1993 ............................
NO OBLIGATION FOR
CONSTRUCTION.
112,536,000
119,408,000
5,412,060,000
19,985,000
778,421,000
36,188,000
110,044,000
10,000,000
1,100,000
6,000,000
12,145,000
33,495,941
1,462,000
2,400,000
1,000,000
15,000,000
900,000
13,194,000
3,400,000
1,400,000
8,300,000
Federal Register / Vol. 80, No. 194 / Wednesday, October 7, 2015 / Notices
60655
VerDate Sep<11>2014
FRM .......
Business
line
19:11 Oct 06, 2015
EI ............
TX & OK
Jkt 238001
PO 00000
VA ..........
NAV ........
FRM .......
UT ..........
Frm 00046
REC .......
VA ..........
Fmt 4703
FRM .......
WA .........
Sfmt 4703
E:\FR\FM\07OCN1.SGM
................
................
.....................................
WV 1 ...........................
WV 1 ...........................
WV 3 ...........................
WV 2 ...........................
WA 1 & 2 ....................
WA 5 ...........................
VA 2 ............................
VA 3 ............................
VA 9 ............................
UT 4 ............................
UT 1 ............................
TX 4; OK 2 ..................
TX 15 & 34 .................
Congressional districts
# PROJECTS ..............
UPPER JORDAN
RIVER, UT.
LEVISA AND TUG
FORKS AND
UPPER CUMBERLAND RIVER
VA, WV, KY (HAYSI
LAKE, VA).
NORFOLK HARBOR
ANCHORAGES, VA.
WALLOPS ISLAND,
VA.
SNAKE RIVER INTERPRETIVE CENTER,
CLARKSTON, WA.
STILLAGUMAISH
RIVER BASIN, WA.
CABIN CREEK LPP,
WV.
ISLAND CREEK
BASIN, VICINITY
OF LOGAN, WV
(NON–STRUCTURAL FEATURES).
WEST VIRGINIA
PORT DEVELOPMENT, WV.
WEIRTON PORT, WV
LOWER RIO GRANDE
BASIN, TEXAS
(SOUTH MAIN
CHANNEL), TX.
RED RIVER WATERWAY (BANK STABILIZATION FEATURES).
CACHE COUNTY, UT
Project/element name
147 ..............................
PROJECT ...................
PROJECT ...................
SEPARABLE ELEMENT.
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
PROJECT ...................
SEPARABLE ELEMENT.
PROJECT ...................
PROJECT ...................
SEPARABLE ELEMENT.
SEPARABLE ELEMENT.
Project/element type (1)
........................
106–53
106–53
99–662
99–662
106–541
108–137
106–53
101–640
104–303
106–53
106–53
90–483
99–662
Public law of
authorization
or latest
amendment
..................
557(2) .......
557(3) .......
401a .........
601a .........
101b (27)
124 ...........
567 ...........
107a13 .....
353 ...........
357 ...........
502b .........
101 ...........
401a .........
Section of
public law
TABLE 1 (INTERIM DEAUTHORIZATION LIST)—Continued
.....................................
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
NEVER FUNDED .......
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
CONSTRUCTION NOT
INITIATED.
NEVER FUNDED .......
CONSTRUCTION NOT
INITIATED.
CONSTRUCTION NOT
INITIATED.
Project/element phase
and status (2)
TOTAL ........................
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
NO OBLIGATION FOR
CONSTRUCTION.
2004 ............................
1989 ............................
NO OBLIGATION FOR
CONSTRUCTION.
2004 ............................
2004 ............................
2005 ............................
Latest fiscal year of
federal or non–federal
obligations
for construction
14,348,670,778
15,274,778
24,144,000
107,707,600
10,409,900
26,047,966
3,750,044
8,000,000
63,130,000
185,915,319
11,087,268
5,000,000
685,324,228
207,183,000
Federal balance to
complete (subject
to Section 902
where applicable)
NOTES:
(1) PROJECT/ELEMENT TYPE: PROJECT = WATER RESOURCES DEVELOPMENT PROJECT AUTHORIZED FOR CONSTRUCTION, INCLUDING AUTHORIZED ENVIRONMENTAL INFRASTRUCTURE ASSISTANCE PROGRAM IN ACCORDANCE WITH WRRDA 2014, SECTION 6001(f)(1)(B).
(2) PROJECT/ELEMENT PHASE AND STATUS: NEVER FUNDED = NEVER FUNDED FOR CONSTRUCTION, INCLUDING PROJECTS IN PRECONSTRUCTION ENGINEERING AND DESIGN; CONSTRUCTION NOT INITIATED = CONSTRUCTION FUNDED BUT PHYSICAL CONSTRUCTION NOT INITIATED; CONSTRUCTION PAUSED = CONSTRUCTION FUNDED BUT PHYSICAL CONSTRUCTION PAUSED.
(3) PER PUBLIC LAW 106–541, SEC. 507, NO CRITICAL RESTORATION PROJECT MAY BE INITIATED UNDER THIS SUBSECTION AFTER SEPTEMBER 30, 2005.
LRP ........
NAV ........
WV .........
LRH ........
LRH ........
NAV ........
WV .........
LRH ........
NWS .......
NWW ......
NAO .......
NAO .......
LRH ........
SPK ........
SPK ........
SWT .......
SWG ......
Corps
district
WV .........
FRM .......
WV .........
AER ........
WA .........
FRM .......
VA ..........
FRM .......
UT ..........
NAV ........
TX ..........
State
asabaliauskas on DSK5VPTVN1PROD with NOTICES
60656
Federal Register / Vol. 80, No. 194 / Wednesday, October 7, 2015 / Notices
07OCN1
Federal Register / Vol. 80, No. 194 / Wednesday, October 7, 2015 / Notices
Authority: This notice is required by
§ 6001(c) of the Water Resources Reform and
Development Act of 2014, Public Law 113–
121, 128 STAT 1346–1347.
Dated: September 30, 2015.
Jo-Ellen Darcy,
Assistant Secretary of the Army (Civil Works).
[FR Doc. 2015–25586 Filed 10–6–15; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF DEFENSE
Department of the Army, Corps of
Engineers
Intent To Prepare a Draft Feasibility
Study and Environmental Impact
Statement (EIS) for Navigational
Improvements to San Juan Harbor in
San Juan, Puerto Rico
AGENCY:
U.S. Army Corps of Engineers,
DOD.
ACTION:
Notice of intent.
The purpose of the feasibility
study is to improve navigation in San
Juan Harbor.
ADDRESSES: U.S. Army Corps of
Engineers, Planning Division,
Environmental Branch, P.O. Box 4970,
Jacksonville, FL 32232–0019.
FOR FURTHER INFORMATION CONTACT: Mr.
Paul DeMarco at (904) 232–1897 or
email at paul.m.demarco@
usace.army.mil.
SUPPLEMENTARY INFORMATION:
1. Description of the Proposed Action.
Proposed navigational improvements to
San Juan Harbor include deepening
main channels up to minus 50 feet and
widening main channels up to an
additional 50 feet. Additional
information is available on our
Environmental Documents Web page at
https://www.saj.usace.army.mil/About/
DivisionsOffices/Planning/
EnvironmentalBranch/
EnvironmentalDocuments.aspx#SJH.
2. Reasonable Alternatives. Lesser
increments of widening and deepening
and other alternatives would also be
evaluated. The dredged material is
expected to be suitable for placement in
the Ocean Dredged Material Disposal
Site located a few miles from the harbor
entrance. Some material may be suitable
for placement in dredged holes and for
other purposes. Other alternatives as
identified during the scoping and plan
formulation process will be considered.
3. Scoping Process:
a. Public and Agency Involvement. A
scoping letter is being sent to agencies,
commercial interests, and the public.
b. Issues to be Analyzed in Depth in
the DEIS. Important issues expected
include impacts to protected species,
asabaliauskas on DSK5VPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
18:12 Oct 06, 2015
Jkt 238001
sea grass, hardgrounds, socio-economic
factors, and any other factors that might
be determined during the scoping and
plan formulation process.
c. Possible Assignments for Input into
the EIS Among Lead and Potential
Cooperating Agencies.
—U.S. Fish and Wildlife Service: Input
concerning listed species, critical
habitat, and other fish and wildlife
resources.
—National Marine Fisheries Service:
Input concerning listed species,
critical habitat, and essential fish
habitat.
—U.S. Environmental Protection
Agency: Input concerning ocean
disposal.
—The U.S. Army Corps of Engineers is
the Lead agency and, together with
the non-federal sponsor (Puerto Rico
Ports Authority) will assume
responsibility for all other aspects of
the EIS.
d. Other Environmental Review and
Consultation Requirements. The
proposed action is subject to the
requirements of the Endangered Species
Act, Marine Mammal Protection Act,
Essential Fish Habitat requirements,
National Historic Preservation Act,
numerous other laws and executive
orders, and any other requirements that
might be identified during the scoping
and plan formulation process.
4. Scoping Meeting. A public scoping
meeting will be held on November 5,
2015, at 9:00 a.m. in Room 101 of the
Puerto Rico Convention Center, 100
Convention Boulevard, San Juan, Puerto
Rico.
5. Date the DEIS Made Available to
the Public. Depending on the issues,
alternatives, investigations, and other
requirements identified during the
scoping and plan formulation process;
the Draft EIS should be available by
September 30, 2017.
Dated: September 29, 2015.
Eric P. Summa,
Chief, Environmental Branch.
[FR Doc. 2015–25574 Filed 10–6–15; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF EDUCATION
Announcement of Requirements and
Registration for the Reach Higher
Career App Challenge
Office of Career, Technical, and
Adult Education, Department of
Education.
ACTION: Notice; public challenge.
AGENCY:
The U.S. Department of
Education (the Department) is
SUMMARY:
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
60657
announcing the Reach Higher Career
App Challenge (RHCAC or Challenge), a
prize competition funded by the Carl D.
Perkins Career and Technical Education
Act of 2006 (Perkins IV or Act). RHCAC
calls upon potential entrants, who may
include eligible educators, mobile
application (app) developers, and other
interested individuals to submit
information concerning concepts for
mobile apps, which may include a
prototype, to improve access to
information about career and technical
education (CTE), help students,
including students with disabilities and
English Learners, navigate education
and career paths, and increase the
capacity of career counselors to serve
students. The Challenge seeks solutions
that: (1) Are focused on middle and high
school students, (2) include integrated
tools to assess user skills and interests,
and (3) offer users accessible
information on occupations, education
options, credentials, and career-seeking
skills through an individualized user
experience.
DATES: We must receive your Challenge
submission on or before December 7,
2015.
The timeframes for judging the
submissions and selecting the finalists
will be determined by the Department.
The Department will conduct at least
one online information session during
the open submission phase of the
challenge. The date of the session will
be determined and announced by the
Department, posted on the Luminary
LightboxTM platform at
www.reachhigherchallenge.com
(Challenge Web page), and sent to
entrants by email. The dates for finalist
activities including the Virtual
Accelerator phase, finalist mentorship,
Innovator’s Boot Camp, and
Demonstration Day (all of these
activities are described elsewhere in this
notice) will be determined and
announced by the Department.
The date for the final judging will be
determined and announced by the
Department following Demonstration
Day.
The winner(s) will be announced on
a date determined and announced by
the Department.
ADDRESSES: Submit entries for the prize
at www.reachhigherchallenge.com/.
FOR FURTHER INFORMATION CONTACT:
Albert Palacios, U.S. Department of
Education, 550 12th Street SW., Room
11086, Washington, DC 20202 or by
email: albert.palacios@ed.gov. If you use
a telecommunications device for the
deaf (TDD) or a text telephone (TTY),
call the FRS, toll free, at 1–800–877–
8339.
E:\FR\FM\07OCN1.SGM
07OCN1
Agencies
[Federal Register Volume 80, Number 194 (Wednesday, October 7, 2015)]
[Notices]
[Pages 60647-60657]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-25586]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers
One-Time Deauthorization of Water Resources Projects
AGENCY: Army Corps of Engineers, DoD.
ACTION: Notice of Interim Deauthorization List.
-----------------------------------------------------------------------
SUMMARY: The U.S. Army Corps of Engineers is publishing an Interim
Deauthorization List of water resources development projects and
separable elements that have been identified for deauthorization in
accordance with section 6001(c) of the Water Resources Reform and
Development Act of 2014, Public Law 113-121, 128 STAT. 1346-1347 (WRRDA
2014), and is soliciting comments from the public on the list for 90
calendar days. Comments should be provided to the contact named below
by January 4, 2016.
FOR FURTHER INFORMATION CONTACT: Mr. Joseph W. Aldridge, Headquarters,
U.S. Army Corps of Engineers, Attention: CECW-IP, Washington, DC 20314-
1000. Tel. (202) 761-4130 or joseph.w.aldridge@usace.army.mil.
SUPPLEMENTARY INFORMATION: Interim Deauthorization List required by
Sec. 6001(c).
Section 6001(c) provides that the Secretary shall develop an
Interim Deauthorization List that identifies each water resources
development project, or separable element of a project, that meets the
following criteria. Projects and separable elements eligible for
deauthorization are those uncompleted construction projects and
separable elements meeting all of the following criteria: (1) They were
authorized for construction before November 8, 2007, or their most
recent modification of the construction authorization predates November
8, 2007; (2) their construction has not been initiated, or, if
construction has been initiated, there have been no obligations of
Federal or non-federal funds for construction in the current fiscal
year or any of the past 6 fiscal years; and, (3) there has been no
funding for a post-authorization study in the current fiscal year or
any of the past 6 fiscal years. As specifically provided in section
6001(f)(1)(B) of WRRDA 2014, water resources development projects
include environmental infrastructure assistance projects and programs
of the U.S. Army Corps of Engineers. In accordance with section 103(f)
of the Water Resources Development Act of 1986, separable elements is
defined as ``a portion of a project--
(1) which is physically separable from other portions of the
project; and
(2) which--
(A) achieves hydrologic effects, or
(B) produces physical or economic benefits, which are separately
identifiable from those produced by other portions of the project.''
The following elements of an authorized water resources development
project also qualify as separable elements: An element for which there
is an executed design agreement or project partnership agreement
specific to that element; an element that has received funding
specified for that element; an element that was authorized separately
from or as an amendment to the authorization for the remainder of the
water resources development project, that was separately identified in
the authorization for the water resources development project, or for
which a statute specifies an authorized cost, estimated cost, or amount
authorized to be appropriated; an element that has been placed in
service or for which the Government or the non-federal partner has
assumed operation and maintenance; an element that has been
deauthorized; or the remaining portion of the water resources
development project apart from other separable elements. Following a
90-day public review period of the Interim Deauthorization List, the
Assistant Secretary of the Army for Civil Works (ASA(CW)) will publish
a Final Deauthorization List in the Federal Register. Section
6001(d)(2)(A) of WRRDA 2014 requires that the Secretary shall include
on the Final Deauthorization List projects and separable elements of
projects that have, in the aggregate, an estimated Federal cost to
complete that is at least $18 billion. The ASA(CW) has strived to meet
the requirements of Section 6001, but was not able to identify projects
that totaled $18 billion.
The projects and elements on the Final Deauthorization List will be
deauthorized automatically after 180 days following the date that the
ASA(CW) submits the Final Deauthorization List to Congress, unless
[[Page 60648]]
the Congress passes a joint resolution disapproving the Final
Deauthorization List or the non-Federal interest for the project or
separable element of the project provides sufficient funds to complete
the project or separable element. The amount shown as the Federal
Balance to complete is a working estimate generally based on the
authorization and as such any non-Federal interests considering
providing sufficient funds to complete a project or separable element
should contact the appropriate District Commander to discuss the
process necessary to develop a final cost to complete a project or
separable element.
The Interim Deauthorization List follows below in Table 1.
[[Page 60649]]
Table 1 (Interim Deauthorization List)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Latest fiscal Federal balance
Public law of Project/element year of federal to complete
State Business line Corps Congressional Project/element Project/element authorization Section of phase and status or non-federal (subject to
district districts name type \(1)\ or latest public law \(2)\ obligations for Section 902 where
amendment construction applicable)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
AL........... NAV.......... SAM.......... AL 2, 3 & 4....... ALABAMA-COOSA PROJECT........... 99-662 813........... CONSTRUCTION NOT 1986............. $3,781,921,691
RIVER AND INITIATED.
TRIBUTARIES, AL
(COOSA RIVER
BETWEEN
MONTGOMERY AND
GADSDEN).
AL........... EI........... SAM.......... AL 4.............. DUCK RIVER, AL.... PROJECT........... 106-554 108a.......... CONSTRUCTION NOT NO OBLIGATION FOR 5,000,000
INITIATED. CONSTRUCTION.
AR........... EI........... MVK.......... AR 4.............. UNION COUNTY, AR.. PROJECT........... 106-554 108d.......... CONSTRUCTION NOT 2008............. 51,247,100
INITIATED.
AR........... FRM.......... MVM.......... AR 1.............. L'ANGUILLE RIVER PROJECT........... 99-662 103........... CONSTRUCTION NOT 2004............. 19,466,768
BASIN, AR. INITIATED.
AR........... FRM.......... SWL.......... AR 1, 2, 3 & 4; OK ARKANSAS RIVER PROJECT........... 101-640 110(a1)....... NEVER FUNDED..... NO OBLIGATION FOR 591,605
1. LEVEES, AR. CONSTRUCTION.
AR........... AER.......... SWL.......... AR 3.............. BEAVER DAM , AR SEPARABLE ELEMENT. 94-587 105........... NEVER FUNDED..... NO OBLIGATION FOR 5,990,000
(TROUT PRODUCTION CONSTRUCTION.
CENTER).
AR........... EI........... SWL.......... AR 3.............. BEAVER LAKE, SEPARABLE ELEMENT. 104-303 523........... CONSTRUCTION 2002............. 5,000,000
BENTON/WASH, AR. PAUSED.
CA........... EI........... SPK.......... CA 4.............. CALAVERAS COUNTY, PROJECT........... 104-303 526........... NEVER FUNDED..... NO OBLIGATION FOR 1,500,000
CA. CONSTRUCTION.
CA........... EI........... SPK.......... CA 3 & 5.......... CLEAR LAKE BASIN, PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CA. CONSTRUCTION.
CA........... FRM.......... SPK.......... CA 3.............. COLUSA TROUGH PROJECT........... 99-662 830........... NEVER FUNDED..... NO OBLIGATION FOR 18,900,846
DRAINAGE CANAL, CONSTRUCTION.
SACRAMENTO RIVER
AND TRIBUTARIES,
CA.
CA........... EI........... SPK.......... CA 21............. PINE FLAT DAM, CA. PROJECT........... 106-541 101b(7)....... NEVER FUNDED..... NO OBLIGATION FOR 41,502,918
CONSTRUCTION.
CA........... EI........... SPL.......... CA 39............. CHINO HILLS, CA... PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
CA........... EI........... SPL.......... CA 39 & 45........ EASTERN MUNICIPAL PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
WATER DISTRICT, CONSTRUCTION.
CA.
CA........... FRM.......... SPL.......... CA 24............. GOLETA & VICINITY, PROJECT........... 102-580 102b.......... CONSTRUCTION 1984............. 1,233,626
CA. PAUSED.
CA........... EI........... SPL.......... CA 44............. LOS ANGELES HARBOR/ PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 6,500,000
TERMINAL ISLAND, CONSTRUCTION.
CA.
CA........... FRM.......... SPL.......... CA 24............. LOWER MISSION PROJECT........... 100-676 3a............ NEVER FUNDED..... NO OBLIGATION FOR 14,625,971
CREEK, CA. CONSTRUCTION.
CA........... EI........... SPL.......... CA 26, 27 & 29.... SAN DIEGO AREA PROJECT........... 102-580 217c(2)....... NEVER FUNDED..... NO OBLIGATION FOR 5,000,000
WATER REUSE CONSTRUCTION.
DEMOSTRATION
FACILITIES, CA.
CA........... EI........... SPL.......... CA 52............. SAN DIEGO COUNTY, PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 10,000,000
CA (CORONADO CONSTRUCTION.
TRANSBAY
WASTEWATER
PIPELINE).
CA........... EI........... SPL.......... CA 26, 27 & 29.... SOUTHERN PROJECT........... 102-580 217c(1)....... NEVER FUNDED..... NO OBLIGATION FOR 5,000,000
CALIFORNIA CONSTRUCTION.
COMPREHENSIVE
WATER REUSE
SYSTEM, CA.
[[Page 60650]]
CT........... EI........... NAE.......... CT 4.............. BRIDGEPORT PROJECT........... 106-53 502b.......... CONSTRUCTION NOT NO OBLIGATION FOR 10,000,000
COMBINED SEWER INITIATED. CONSTRUCTION.
OVERFLOW PTOJECT,
CT.
CT........... EI........... NAE.......... CT 1.............. HARTFORD, CT...... PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 10,000,000
CONSTRUCTION.
CT........... EI........... NAE.......... CT 3.............. NEW HAVEN, CT..... PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 10,000,000
CONSTRUCTION.
CT, ME, MA, AER.......... NAE.......... CT 1, 2, 3, 4 & 5; NEW ENGLAND WATER PROJECT........... 106-541 507........... NEVER FUNDED..... NO OBLIGATION FOR (3)0
NH, RI & VT. ME 1, & 2; MA 1, RESOURCES AND CONSTRUCTION.
2, 3, 4, 5, 6, 7, ECOSYSTEM
8, & 9; NH 1 & 2; RESTORATION, CT,
RI 1 & 2; VT AT ME, MA, NH, RI &
LARGE. VT.
DC & MD...... EI........... NAB.......... .................. WASHINGTON DC AND PROJECT........... 106-554 108d.......... CONSTRUCTION NOT 1998............. 14,807,000
MARYLAND, D.C. & INITIATED.
MD.
FL........... AER.......... SAJ.......... FL 17, 18, 19, 20, COMPREHENSIVE SEPARABLE ELEMENT. 106-541 601 b2biiii... CONSTRUCTION NOT 2005............. 17,000,000
21, 22 & 23. EVERGLADES INITIATED.
RESTORATION PLAN,
FL (LAKE BELT
GROUND RESERVOIR
TECHNOLOGY).
FL........... AER.......... SAJ.......... FL 17, 18, 20, 21, COMPREHENSIVE SEPARABLE ELEMENT. 106-541 601 b2cix..... NEVER FUNDED..... NO OBLIGATION FOR 67,150,000
22, 23, 25, 26 & EVERGLADES CONSTRUCTION.
27. RESTORATION PLAN,
FL (NORTH NEW
RIVER
IMPROVEMENTS).
FL........... AER.......... SAJ.......... FL 18, 20, 21, 22, COMPREHENSIVE SEPARABLE ELEMENT. 106-541 601 b2cviii... NEVER FUNDED..... NO OBLIGATION FOR 21,500,000
23, 24, 25, 26 & EVERGLADES CONSTRUCTION.
27. RESTORATION PLAN,
FL (RAISE AND
BRIDGE EAST
PORTION OF
TAMIAMI TRAIL AND
FILL MIAMI CANAL
WITHIN WATER)
(CONSEVATION AREA
3).
FL........... AER.......... SAJ.......... FL 16 & 23........ COMPREHENSIVE SEPARABLE ELEMENT. 106-541 601 b2cvii.... CONSTRUCTION NOT NO OBLIGATION FOR 67,800,000
EVERGLADES INITIATED. CONSTRUCTION.
RESTORATION PLAN,
FL (TAYLOR CREEK/
NUBBIN SLOUGH
STORAGE AND
TREATMENT AREA).
FL........... AER.......... SAJ.......... FL 17, 18, 20, 21, COMPREHENSIVE SEPARABLE ELEMENT. 106-541 601 b2biiii... CONSTRUCTION NOT 2005............. 20,500,000
22, 23, 25, 26 & EVERGLADES INITIATED.
27. RESTORATION PLAN,
FL (WASTEWATER
REUSE TECHNOLOGY).
FL........... NAV.......... SAJ.......... FL 12............. HUDSON RIVER, FL.. PROJECT........... 81-516 101........... NEVER FUNDED..... NO OBLIGATION FOR 3,650,000
CONSTRUCTION.
[[Page 60651]]
FL........... EI........... SAJ.......... FL 27............. KEY BISCAYNE, FL.. PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
FL........... FRM.......... SAJ.......... FL 14............. LITTLE TALBOT PROJECT........... 106-53 101b7......... CONSTRUCTION 2000............. 6,786,030
ISLAND, FL. PAUSED.
FL........... EI........... SAJ.......... FL 14............. SOUTH TAMPA, FL... PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
FL........... NAV.......... SAJ.......... FL 10, 11, 12 & 13 TAMPA HARBOR, PROJECT........... 106-554 107........... CONSTRUCTION NOT 2006............. 64,771,847
ALAFIA RIVER, FL. INITIATED.
FL........... NAV.......... SAJ.......... FL 10, 11, 12 & 13 TAMPA HARBOR, FL SEPARABLE ELEMENT. 99-662 858........... NEVER FUNDED..... NO OBLIGATION FOR 8,434,881
((PORT SUTTON CONSTRUCTION.
TURNING BASIN)
WIDENING TO AN
ADDITIONAL 105
FEET TO THE
FENDER LINE ALONG
PENDOLA POINT).
HI........... FRM.......... POH.......... HI 1.............. WAIKIKI EROSION PROJECT........... 89-298 301........... NEVER FUNDED..... NO OBLIGATION FOR 16,584,000
CONTROL, HI. CONSTRUCTION.
IL........... EI........... LRC.......... IL 11 & 14........ AURORA, IL........ PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 8,000,000
CONSTRUCTION.
IL........... FRM.......... LRC.......... IL 9, 10 & 14..... DES PLAINES RIVER, SEPARABLE ELEMENT. 106-53 101b10........ NEVER FUNDED..... NO OBLIGATION FOR 5,795,400
IL (NORTH FORK CONSTRUCTION.
MILL CREEK DAM
MODIFICATION).
IN........... EI........... LRE.......... IN 3.............. FORT WAYNE, IN.... PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,529,324
CONSTRUCTION.
IN........... EI........... LRL.......... IN 7.............. INDIANAPOLIS, IN.. PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
KY........... FRM.......... LRH.......... KY 5.............. BEAVER CREEK PROJECT........... 89-298 204........... NEVER FUNDED..... NO OBLIGATION FOR 20,873,500
BASIN, KY. CONSTRUCTION.
KY & TN...... AER.......... MVM.......... TN 8; KY 1........ REELFOOT LAKE, TN PROJECT........... 106-53 101b11........ NEVER FUNDED..... NO OBLIGATION FOR 33,072,769
& KY. CONSTRUCTION.
LA........... FRM.......... MVK.......... LA 1.............. PEARL RIVER, PROJECT........... 99-662 401b.......... CONSTRUCTION NOT 2002............. 29,311,000
SLIDELL, SAINT INITIATED.
TAMMANY PARISH,
LA.
LA........... FRM.......... MVN.......... LA 1, 2 & 6....... AMITE RIVER AND PROJECT........... 102-580 101(11)....... NEVER FUNDED..... NO OBLIGATION FOR 38,058,405
TRIBUTARIES, LA. CONSTRUCTION.
LA........... FRM.......... MVN.......... LA 6.............. BAYOU COCODRIE AND PROJECT........... 93-251 87............ CONSTRUCTION 1987............. 345,472,000
TRIBUTARIES, LA. PAUSED.
LA........... NAV.......... MVN.......... LA 1, 2, 3 & 6.... GULF INTRACOASTAL PROJECT........... 87-874 101........... NEVER FUNDED..... NO OBLIGATION FOR 201,422,000
WATERWAY, LA-TX CONSTRUCTION.
SECTION, LA & TX.
LA........... EI........... MVN.......... LA 1 & 2.......... KENNER, LA........ PROJECT........... 106-554 108........... NEVER FUNDED..... NO OBLIGATION FOR 5,000,000
CONSTRUCTION.
LA........... EI........... MVN.......... LA 1 & 2.......... ST. CHARLES, ST. PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
BERNARD, AND CONSTRUCTION.
PLAQUEMINES
PARISHES, LA.
LA........... EI........... MVN.......... LA 2 & 6.......... ST. JOHN THE PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
BAPTIST AND ST. CONSTRUCTION.
JAMES PARISHES,
LA.
LA........... FRM.......... MVN.......... LA 1.............. TANGIPAHOA, PROJECT........... 99-662 401........... NEVER FUNDED..... NO OBLIGATION FOR 21,723,000
TCHEFUNCTE, AND CONSTRUCTION.
TICKFAW RIVERS,
LA.
MA........... EI........... NAE.......... MA 9.............. FALL RIVER AND NEW PROJECT........... 106-554 108c.......... NEVER FUNDED..... NO OBLIGATION FOR 35,000,000
BEDFORD, MA. CONSTRUCTION.
[[Page 60652]]
MA........... FRM.......... NAE.......... MA 4, 7 & 8....... MUDDY RIVER, SEPARABLE ELEMENT. 106-541 522........... NEVER FUNDED..... NO OBLIGATION FOR 24,050,000
BROOKLINE AND CONSTRUCTION.
BOSTON, MA
(AQUATIC
ECOSYSTEM
RESTORATION
FEATURES).
MI........... NAV.......... LRE.......... MI 1.............. ALPENA HARBOR, MI PROJECT........... 104-303 363d.......... NEVER FUNDED..... NO OBLIGATION FOR 4,063,120
(25 FOOT CHANNEL). CONSTRUCTION.
MI........... NAV.......... LRE.......... MI 5.............. BAY CITY, MI...... PROJECT........... 101-640 105........... NEVER FUNDED..... NO OBLIGATION FOR 8,466,275
CONSTRUCTION.
MI........... EI........... LRE.......... MI 6.............. BENTON HARBOR, ST PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 1,500,000
JOSEPH WASTEWATER CONSTRUCTION.
TREATMENT PLANT,
ST JOSEPH, MI.
MI........... NAV.......... LRE.......... MI 1.............. CHARLEVOIX, MI SEPARABLE ELEMENT. 106-53 373........... NEVER FUNDED..... NO OBLIGATION FOR 52,500
(REVETMENT CONSTRUCTION.
CONNECTION).
MI........... NAV.......... LRE.......... MI 1.............. ONTONAGON HARBOR, PROJECT........... 104-303 363e.......... NEVER FUNDED..... NO OBLIGATION FOR 37,134,623
ONTONAGON COUNTY CONSTRUCTION.
MI.
MI........... FRM.......... LRE.......... MI 5.............. SAGINAW RIVER AND SEPARABLE ELEMENT. 106-53 364(3)........ NEVER FUNDED..... NO OBLIGATION FOR 13,909,394
TRIBUTARIES, MI CONSTRUCTION.
(CASS RIVER AT
VASSAR).
MI........... FRM.......... LRE.......... MI 4 & 5.......... SAGINAW RIVER AND SEPARABLE ELEMENT. 99-662 845........... NEVER FUNDED..... NO OBLIGATION FOR 720,653
TRIBUTARIES, MI CONSTRUCTION.
(CURTIS ROAD
BRIDGE).
MI........... FRM.......... LRE.......... MI 5.............. SAGINAW RIVER AND SEPARABLE ELEMENT. 104-303 329........... NEVER FUNDED..... NO OBLIGATION FOR 571,781
TRIBUTARIES, MI CONSTRUCTION.
(FLINT RIVER AT
FLINT).
MI........... FRM.......... LRE.......... MI 4 & 5.......... SAGINAW RIVER AND SEPARABLE ELEMENT. 106-53 364(4)........ NEVER FUNDED..... NO OBLIGATION FOR 106,825,583
TRIBUTARIES, MI CONSTRUCTION.
(SHIAWASSEE
FLATS).
MI, MN & WI.. NAV.......... LRE.......... MI 1; MN 8; WI 7.. GREAT LAKES PROJECT........... 101-640 101a15........ NEVER FUNDED..... NO OBLIGATION FOR 17,938,174
CONNECTING CONSTRUCTION.
CHANNELS &
HARBORS, MN, MI &
WI.
MN........... NAV.......... LRE.......... MN 8.............. DULUTH, MN PROJECT........... 104-303 541a/b........ NEVER FUNDED..... NO OBLIGATION FOR 1,000,000
(ALTERNATIVE CONSTRUCTION.
TECHNOLOGY
PROJECT).
MN........... EI........... LRE.......... MN 8.............. LAKE SUPERIOR PROJECT........... 104-303 542........... NEVER FUNDED..... NO OBLIGATION FOR 10,000,000
CENTER, MN. CONSTRUCTION.
MN........... EI........... MVP.......... MN 5.............. MISSISSIPPI PLACE, PROJECT........... 106-53 577........... CONSTRUCTION NOT 2006............. 2,968,178
MN. INITIATED.
MN & WI...... NAV.......... LRE.......... MN 8; WI 7........ DULUTH--SUPERIOR PROJECT........... 99-662 201a.......... CONSTRUCTION 1995............. 14,064,481
CHANNEL PAUSED.
EXTENSION, MN &
WI.
MO........... EI........... NWK.......... MO 4 & 6.......... KANSAS CITY, MO... PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 15,000,000
CONSTRUCTION.
[[Page 60653]]
MO & IL...... NAV.......... MVS.......... MO 1, 2, 3, & 8; ST LOUIS HARBOR, PROJECT........... 99-662 601a.......... NEVER FUNDED..... NO OBLIGATION FOR 43,253,100
IL 12 & 13. MO & IL. CONSTRUCTION.
MS........... FRM.......... MVK.......... MS 2.............. YAZOO BASIN, PROJECT........... 89-298 204........... CONSTRUCTION 2007............. 233,490,728
TRIBUTARIES, MS. PAUSED.
MS........... NAV.......... MVK.......... MS 2.............. YAZOO RIVER, MS SEPARABLE ELEMENT. 99-662 822........... NEVER FUNDED..... NO OBLIGATION FOR 2,011,094
(SHEPARDSTOWN CONSTRUCTION.
BRIDGE).
MS & LA...... AER.......... MVN.......... LA 2.............. MISSISSIPPI AND PROJECT........... 100-676 3(a)8......... CONSTRUCTION NOT 2003............. 70,668,540
LOUISIANA INITIATED.
ESTUARINE AREAS,
MS & LA.
NC........... EI........... SAW.......... NC 8.............. LUMBERTON, NC..... PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 1,700,000
CONSTRUCTION.
NC........... EI........... SAW.......... NC 8 & 9.......... UNION COUNTY, NC.. PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
NC & SC...... FRM.......... SAW.......... NC 9 & 12......... SUGAR CREEK BASIN, PROJECT........... 99-662 401a.......... NEVER FUNDED..... NO OBLIGATION FOR 54,523,100
NC & SC. CONSTRUCTION.
NH........... EI........... NAE.......... NH 2.............. NASHUA, NH PROJECT........... 106-53 502b.......... CONSTRUCTION NOT NO OBLIGATION FOR 19,853,000
(COMBINED SEWER INITIATED. CONSTRUCTION.
OVERFLOW).
NH........... EI........... NAE.......... NH 1.............. ROCHESTER, NH..... PROJECT........... 104-303 504(e) (4).... CONSTRUCTION NOT NO OBLIGATION FOR 10,897,120
INITIATED. CONSTRUCTION.
NJ........... EI........... NAN.......... NJ 8.............. ELIZABETH, NJ..... PROJECT........... 106-53 502(f)........ NEVER FUNDED..... NO OBLIGATION FOR 20,000,000
CONSTRUCTION.
NJ........... EI........... NAN.......... NJ 8.............. NORTH HUDSON, NJ.. PROJECT........... 106-53 502(f)........ NEVER FUNDED..... NO OBLIGATION FOR 20,000,000
CONSTRUCTION.
NJ........... EI........... NAN.......... NJ 9.............. PATTERSON AND PROJECT........... 106-554 108c.......... NEVER FUNDED..... NO OBLIGATION FOR 30,000,000
PASSAIC COUNTY, CONSTRUCTION.
NJ.
NJ........... EI........... NAP.......... NJ 4, 6 & 12...... STATE OF NEW PROJECT........... 102-580 219c (10)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
JERSEY AND NEW CONSTRUCTION.
JERSEY WASTEWATER
TREATMENT TRUST,
NJ.
NJ........... EI........... NAP.......... NJ 5.............. TOWN OF NEWTON, NJ PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 7,000,000
CONSTRUCTION.
NV........... FRM.......... SPL.......... NV 4.............. LAS VEGAS WASH AND PROJECT........... 102-580 101(13)....... CONSTRUCTION NOT NO OBLIGATION FOR 3,360,938
TRIBUTARIES, NV. INITIATED. CONSTRUCTION.
NV........... FRM.......... SPL.......... NV 4.............. LAS VEGAS, NV..... PROJECT........... 109-103 115........... NEVER FUNDED..... NO OBLIGATION FOR 20,000,000
CONSTRUCTION.
NY........... EI........... LRB.......... NY26 & 27......... ERIE COUNTY, SEPARABLE ELEMENT. 102-580 221........... NEVER FUNDED..... NO OBLIGATION FOR 7,000,000
BUFFALO AMHRST, CONSTRUCTION.
NY.
NY........... EI........... LRB.......... NY 26 & 27........ ERIE COUNTY, NY PROJECT........... 102-580 219c (12)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
(SLUDGE DISPOSAL). CONSTRUCTION.
NY........... EI........... LRB.......... NY 26 & 27........ ERIE COUNTY, NY PROJECT........... 102-580 219c (11)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
(WATER QUALITY CONSTRUCTION.
TUNNEL).
NY........... EI........... LRB.......... NY26 & 27......... LEWISTON SEPARABLE ELEMENT. 102-580 222........... NEVER FUNDED..... NO OBLIGATION FOR 200,000
STORMWATER, NY. CONSTRUCTION.
NY........... EI........... LRB.......... NY 24............. LIVERPOOL, NY..... PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 2,000,000
CONSTRUCTION.
NY........... EI........... NAN.......... NY 10 & 11; NJ 8.. INNER HARBOR PROJECT........... 106-53 502(f)........ NEVER FUNDED..... NO OBLIGATION FOR 15,000,000
PROJECT, NEW CONSTRUCTION.
YORK, NY.
NY........... FRM.......... NAN.......... NY 17, 18, 19 & 20 LOWER HUDSON RIVER PROJECT........... 106-53 212e.......... NEVER FUNDED..... NO OBLIGATION FOR 30,000,000
& TRIBUTARIES, NY. CONSTRUCTION.
NY........... EI........... NAN.......... NY 6 & 11......... OUTER HARBOR PROJECT........... 106-53 502(f)........ NEVER FUNDED..... NO OBLIGATION FOR 15,000,000
PROJECT, NEW CONSTRUCTION.
YORK, NY.
[[Page 60654]]
NY/NJ........ NAV.......... NAN.......... NJ 6, 9 & 13; NY NEW YORK HARBOR PROJECT........... 101-640 102........... CONSTRUCTION 2005............. 201,549,768
7, 8, 9, 12, COLLECTION AND PAUSED.
13,14 & 15. REMOVAL OF DRIFT,
NY & NJ.
OH........... NAV.......... LRB.......... OH 9.............. OTTAWA RIVER PROJECT........... 101-640 107a7......... CONSTRUCTION NOT 2006............. 13,218,200
HARBOR, OH. INITIATED.
OH........... FRM.......... LRH.......... OH 15............. HOCKING RIVER, PROJECT........... 99-662 401a.......... NEVER FUNDED..... NO OBLIGATION FOR 16,282,709
LOGAN, OH. CONSTRUCTION.
OH........... FRM.......... LRL.......... OH 8.............. MIAMI RIVER BASIN, PROJECT........... 99-662 401a.......... CONSTRUCTION NOT NO OBLIGATION FOR 18,041,480
PLEASANT RUN, INITIATED. CONSTRUCTION.
VICINITY
FAIRFIELD, OH.
OK........... HYD.......... SWT.......... OK 2.............. FORT GIBSON LAKE, SEPARABLE ELEMENT. 99-662 601a.......... NEVER FUNDED..... NO OBLIGATION FOR 45,485,000
OK (POWER UNITS 5 CONSTRUCTION.
& 6).
OR........... EI........... NWP.......... OR 1.............. ASTORIA, OR....... PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 5,000,000
CONSTRUCTION.
OR........... EI........... NWP.......... OR 2.............. HOOD RIVER, OR.... PROJECT........... 106-554 108a (36)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
OR........... EI........... NWP.......... OR 2.............. MEDFORD, OR....... PROJECT........... 106-554 108a (37)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
OR........... EI........... NWP.......... OR 1 & 2.......... PORTLAND, OR...... PROJECT........... 106-554 108a (38)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
PA........... EI........... LRP.......... PA 5.............. COUDERSPORT, PA... PROJECT........... 106-554 108........... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
PA........... EI........... LRP.......... PA 18............. FINDLAY TOWNSHIP, PROJECT........... 106-53 502........... NEVER FUNDED..... NO OBLIGATION FOR 11,000,000
PA. CONSTRUCTION.
PA........... EI........... LRP.......... PA 9.............. GREENSBORO AND PROJECT........... 102-580 219c(15)...... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
GLASSWORKS, PA. CONSTRUCTION.
PA........... EI........... LRP.......... PA 9.............. JEFFERSON PROJECT........... 106-53 502........... NEVER FUNDED..... NO OBLIGATION FOR 1,000,000
TOWNSHIP, GREENE CONSTRUCTION.
COUNTY, PA.
PA........... EI........... LRP.......... PA 18............. NORTH FAYETTE PROJECT........... 106-53 502........... NEVER FUNDED..... NO OBLIGATION FOR 500,000
TOWNSHIP, CONSTRUCTION.
ALLEGHENY COUNTY,
PA.
PA........... EI........... LRP.......... PA 18............. ROBINSON TOWNSHIP, PROJECT........... 106-53 502........... NEVER FUNDED..... NO OBLIGATION FOR 1,200,000
PA. CONSTRUCTION.
PA........... EI........... LRP.......... PA 14............. SPRINGDALE PROJECT........... 106-53 502........... NEVER FUNDED..... NO OBLIGATION FOR 500,000
BOROUGH, PA. CONSTRUCTION.
PA........... EI........... LRP.......... PA 3.............. TITUSVILLE, PA.... PROJECT........... 106-554 108........... NEVER FUNDED..... NO OBLIGATION FOR 7,300,000
CONSTRUCTION.
PA........... EI........... LRP.......... PA 9, 12, 14 & 18. WASHINGTON, PROJECT........... 106-554 108........... NEVER FUNDED..... NO OBLIGATION FOR 8,000,000
GREENE, CONSTRUCTION.
WESTMORELAND, AND
FAYETTE COUNTIES,
PA.
PA........... EI........... NAB.......... PA 10............. BRADFORD AND SEPARABLE ELEMENT. 106-53 548........... NEVER FUNDED..... NO OBLIGATION FOR 13,000,000
SULLIVAN CONSTRUCTION.
COUNTIES, PA.
PA........... EI........... NAB.......... PA 11 & 15........ DAUPHIN COUNTY, PA PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 2,000,000
CONSTRUCTION.
PA........... EI........... NAB.......... PA 4.............. DILLSBURG BOROUGH PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 2,000,000
AUTHORITY, PA. CONSTRUCTION.
PA........... EI........... NAB.......... PA 4.............. HAMPDEN TOWNSHIP, PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 3,000,000
PA. CONSTRUCTION.
[[Page 60655]]
PA........... EI........... NAB.......... PA 4 & 11......... MOUNT JOY TOWNSHIP PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 8,300,000
AND CONEWAGO CONSTRUCTION.
TOWNSHIP, PA.
PA........... EI........... NAB.......... PA 5.............. PATTON TOWNSHIP, PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 1,400,000
PA. CONSTRUCTION.
PA........... EI........... NAB.......... PA 4.............. UPPER ALLEN PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 3,400,000
TOWNSHIP, PA. CONSTRUCTION.
PA........... FRM.......... NAP.......... PA 17............. DELAWARE RIVER PROJECT........... 93-251 2............. CONSTRUCTION NOT 1993............. 13,194,000
BASIN--WABASH INITIATED.
CREEK, BOROUGH OF
TAMAQUA, PA.
PA........... FRM.......... NAP.......... PA 2 & 3.......... PHILADELPHIA, PA PROJECT........... 104-303 564e.......... NEVER FUNDED..... NO OBLIGATION FOR 900,000
(FRANKFORD DAM). CONSTRUCTION.
PA........... FRM.......... NAP.......... PA 1, 2, 3 & 13... PHILADELPHIA, PA PROJECT........... 104-303 564d.......... NEVER FUNDED..... NO OBLIGATION FOR 15,000,000
(PENNYPACK PARK). CONSTRUCTION.
PA........... FRM.......... NAP.......... PA 2 & 3.......... PHILADELPHIA, PA PROJECT........... 104-303 564a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,000,000
(WATER WORKS CONSTRUCTION.
RESTORATION).
PA........... EI........... NAP.......... PA 6.............. PHOENIXVILLE PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 2,400,000
BOROUGH, CHESTER CONSTRUCTION.
COUNTY, PA.
PA........... EI........... NAP.......... PA 8.............. TOWAMENCIN PROJECT........... 106-53 502b.......... CONSTRUCTION NOT 2005............. 1,462,000
TOWNSHIP, PA. INITIATED.
PR........... FRM.......... SAJ.......... PR AT LARGE....... GUANAJIBO RIVER, PROJECT........... 106-53 101........... NEVER FUNDED..... NO OBLIGATION FOR 33,495,941
PR. CONSTRUCTION.
PR........... FRM.......... SAJ.......... PR AT LARGE....... RIO NIGUA AT PROJECT........... 106-53 101........... NEVER FUNDED..... NO OBLIGATION FOR 12,145,000
SALINAS, PR. CONSTRUCTION.
RI........... EI........... NAE.......... RI 2.............. CRANSTON, RI...... PROJECT........... 101-640 54............ NEVER FUNDED..... NO OBLIGATION FOR 6,000,000
CONSTRUCTION.
RI........... EI........... NAE.......... RI 1 & 2.......... DREDGING OF SALT PROJECT........... 106-53 578........... NEVER FUNDED..... NO OBLIGATION FOR 1,100,000
PONDS IN THE CONSTRUCTION.
STATE OF RHODE
ISLAND, RI.
SC........... EI........... SAC.......... SC 1.............. CHARLESTON, SC.... PROJECT........... 108-137 127........... NEVER FUNDED..... NO OBLIGATION FOR 10,000,000
CONSTRUCTION.
TN........... NAV.......... MVM.......... TN 9.............. MEMPHIS HARBOR, PROJECT........... 106-53 364........... NEVER FUNDED..... NO OBLIGATION FOR 110,044,000
MEMPHIS, TN. CONSTRUCTION.
TN........... FRM.......... MVM.......... TN 8.............. NONCONNAH CREEK, SEPARABLE ELEMENT. 106-541 334........... CONSTRUCTION NOT 2004............. 36,188,000
TN & MS INITIATED.
(EXTENSION).
TX........... FRM.......... SWF.......... TX 8 & 17......... NAVASOTA RIVER SEPARABLE ELEMENT. 90-483 203........... CONSTRUCTION NOT 1983............. 778,421,000
BASIN, TX INITIATED.
(MILLICAN LAKE,
TX).
TX........... FRM.......... SWF.......... TX 2, 8 & 14...... TRINITY RIVER AND SEPARABLE ELEMENT. 108-447 116........... CONSTRUCTION NOT 1981............. 19,985,000
TRIBUTARIES, TX INITIATED.
(LIBERTY LOCAL
PROTECTION
PROJECT).
TX........... NAV.......... SWF.......... TX 2, 8 & 14...... TRINITY RIVER AND SEPARABLE ELEMENT. 108-447 116........... CONSTRUCTION NOT 1981............. 5,412,060,000
TRIBUTARIES, TX INITIATED.
(NAVIGATION
CHANNEL ABOVE
LIBERTY).
TX........... FRM.......... SWF.......... TX 2, 8 & 14...... TRINITY RIVER AND SEPARABLE ELEMENT. 108-447 116........... CONSTRUCTION NOT 1981............. 119,408,000
TRIBUTARIES, TX INITIATED.
(WEST FORK
FLOODWAY).
TX........... FRM.......... SWG.......... TX 2, 7, 8, 10, 18 BUFFALO BAYOU AND SEPARABLE ELEMENT. 101-640 101(21)....... NEVER FUNDED..... NO OBLIGATION FOR 112,536,000
& 29. TRIBUTARIES, TX CONSTRUCTION.
(HALLS BAYOU).
[[Page 60656]]
TX........... FRM.......... SWG.......... TX 15 & 34........ LOWER RIO GRANDE SEPARABLE ELEMENT. 99-662 401a.......... CONSTRUCTION NOT 2005............. 207,183,000
BASIN, TEXAS INITIATED.
(SOUTH MAIN
CHANNEL), TX.
TX & OK...... NAV.......... SWT.......... TX 4; OK 2........ RED RIVER WATERWAY SEPARABLE ELEMENT. 90-483 101........... CONSTRUCTION NOT 2004............. 685,324,228
(BANK INITIATED.
STABILIZATION
FEATURES).
UT........... EI........... SPK.......... UT 1.............. CACHE COUNTY, UT.. PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 5,000,000
CONSTRUCTION.
UT........... FRM.......... SPK.......... UT 4.............. UPPER JORDAN PROJECT........... 106-53 357........... CONSTRUCTION NOT 2004............. 11,087,268
RIVER, UT. INITIATED.
VA........... FRM.......... LRH.......... VA 9.............. LEVISA AND TUG SEPARABLE ELEMENT. 104-303 353........... CONSTRUCTION NOT 1989............. 185,915,319
FORKS AND UPPER INITIATED.
CUMBERLAND RIVER
VA, WV, KY (HAYSI
LAKE, VA).
VA........... NAV.......... NAO.......... VA 3.............. NORFOLK HARBOR PROJECT........... 101-640 107a13........ NEVER FUNDED..... NO OBLIGATION FOR 63,130,000
ANCHORAGES, VA. CONSTRUCTION.
VA........... FRM.......... NAO.......... VA 2.............. WALLOPS ISLAND, VA PROJECT........... 106-53 567........... NEVER FUNDED..... NO OBLIGATION FOR 8,000,000
CONSTRUCTION.
WA........... REC.......... NWW.......... WA 5.............. SNAKE RIVER PROJECT........... 108-137 124........... CONSTRUCTION NOT 2004............. 3,750,044
INTERPRETIVE INITIATED.
CENTER,
CLARKSTON, WA.
WA........... AER.......... NWS.......... WA 1 & 2.......... STILLAGUMAISH PROJECT........... 106-541 101b (27)..... NEVER FUNDED..... NO OBLIGATION FOR 26,047,966
RIVER BASIN, WA. CONSTRUCTION.
WV........... FRM.......... LRH.......... WV 2.............. CABIN CREEK LPP, PROJECT........... 99-662 601a.......... NEVER FUNDED..... NO OBLIGATION FOR 10,409,900
WV. CONSTRUCTION.
WV........... FRM.......... LRH.......... WV 3.............. ISLAND CREEK SEPARABLE ELEMENT. 99-662 401a.......... NEVER FUNDED..... NO OBLIGATION FOR 107,707,600
BASIN, VICINITY CONSTRUCTION.
OF LOGAN, WV (NON-
STRUCTURAL
FEATURES).
WV........... NAV.......... LRH.......... WV 1.............. WEST VIRGINIA PORT PROJECT........... 106-53 557(3)........ NEVER FUNDED..... NO OBLIGATION FOR 24,144,000
DEVELOPMENT, WV. CONSTRUCTION.
WV........... NAV.......... LRP.......... WV 1.............. WEIRTON PORT, WV.. PROJECT........... 106-53 557(2)........ NEVER FUNDED..... NO OBLIGATION FOR 15,274,778
CONSTRUCTION.
--------------------------------------------------------------------------------------------------------------------------------
............. ............. .................. # PROJECTS........ 147............... .............. .............. ................. TOTAL............ 14,348,670,778
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
NOTES:
(1) PROJECT/ELEMENT TYPE: PROJECT = WATER RESOURCES DEVELOPMENT PROJECT AUTHORIZED FOR CONSTRUCTION, INCLUDING AUTHORIZED ENVIRONMENTAL INFRASTRUCTURE ASSISTANCE PROGRAM IN ACCORDANCE WITH
WRRDA 2014, SECTION 6001(f)(1)(B).
(2) PROJECT/ELEMENT PHASE AND STATUS: NEVER FUNDED = NEVER FUNDED FOR CONSTRUCTION, INCLUDING PROJECTS IN PRECONSTRUCTION ENGINEERING AND DESIGN; CONSTRUCTION NOT INITIATED = CONSTRUCTION
FUNDED BUT PHYSICAL CONSTRUCTION NOT INITIATED; CONSTRUCTION PAUSED = CONSTRUCTION FUNDED BUT PHYSICAL CONSTRUCTION PAUSED.
(3) PER PUBLIC LAW 106-541, SEC. 507, NO CRITICAL RESTORATION PROJECT MAY BE INITIATED UNDER THIS SUBSECTION AFTER SEPTEMBER 30, 2005.
[[Page 60657]]
Authority: This notice is required by Sec. 6001(c) of the Water
Resources Reform and Development Act of 2014, Public Law 113-121,
128 STAT 1346-1347.
Dated: September 30, 2015.
Jo-Ellen Darcy,
Assistant Secretary of the Army (Civil Works).
[FR Doc. 2015-25586 Filed 10-6-15; 8:45 am]
BILLING CODE 3720-58-P